Amendment_0005.pdf
PDF 156 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4809-14-R-0001
About this file
Amendment 0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pictures.zip | ZIP file | |
| Additional_As-Builts.zip | ZIP file | |
| QR_2_15_July_2015.pdf | ||
| 3300.zip | ZIP file | |
| VKAG_14-1201_-_Standard.zip | ZIP file | |
| Attachment_5c _Rev_1.pdf | ||
| Attachment_5a_Rev_1.pdf | ||
| SABER_SOW_Section_C_Rev_1_15_Jul_15.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Site_Visit_Minutes.pdf | ||
| QR_1_5_June_2015.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Attach_3.pdf | ||
| SABER_SOW_Section_C_FINAL.docx | DOCX document | |
| Amendment_0001.pdf | ||
| SABER_SOW_Section_C_FINAL.docx | DOCX document | |
| Attach_3.pdf | ||
| Attach_1.pdf | ||
| Attach_6.pdf | ||
| Attach_5.pdf | ||
| RFP.pdf | ||
| Attach_4.xlsx | XLSX spreadsheet | |
| Attach_12.pdf | ||
| Attach_7.pdf | ||
| Attach_2.pdf | ||
| Attach_11.pdf | ||
| Attach_8.pdf | ||
| Attach_9.pdf |
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate corrections identif ied in Questions and Responses 2.
A. FAR 52.219-18 has been updated to correct an ambiguity.
B. FAR 52.222-30 and DFARS 252.219-7011 have been added by reference.
C. Revisions to Attachment 10, Section C; Attachment 5a, Seed Project SOW; and Attachment 5c, Sheet A-1 have been incorporated.
D. Proposal due date is extended from 23 July 2015 at 4:00 PM EST to 29 July 2015 at 4:00 PM EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4809-14-R-0001
X 9B. DATED (SEE ITEM 11)
26-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2015
CODE
4TH CONTRACTING SQUADRON
1600 WRIGHT BROTHERS AVENUE, BLDG 3010
SEYMOUR JOHNSON AFB NC 27531-2459
FA4809 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4809-14-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.222-30 Construction Wage Rate Requirements--Price Adjustment
(None or Separately Specified Method)
MAY 2014
252.219-7011 Notification to Delay Performance JUN 1998
The following have been modified:
52.219-18 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(A) CONCERNS (JUN 2003)--
ALTERNATE I (APR 2005)
(a) Offers are solicited only from small business concerns expressly certified by the Small Business Administration
(SBA) for participation in the SBA's 8(a) Program and which meet the following criteria at the time of submission of offer--
(1) The Offeror is in conformance with the 8(a) support limitation set forth in its approved business plan; and
(2) The Offeror is in conformance with the Business Activity Targets set forth in its approved business plan or any remedial action directed by the SBA.
(3) The offeror's approved business plan is on the file and serviced by the US SMALL BUSINESS
ADMINISTRATION.
(b) By submission of its offer, the Offeror certifies that it meets all of the criteria set forth in paragraph (a) of this clause.
(c) Any award resulting from this solicitation will be made to the Small Business Administration, which will subcontract performance to the successful 8(a) offeror selected through the evaluation criteria set forth in this solicitation.
(d)(1) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. If this procurement is processed under simplified acquisition procedures and the total amount of this contract does not exceed $25,000, a small business concern may furnish the product of any domestic firm. This paragraph does not apply to construction or service contracts.
(2) The SUCCESSFUL CONTRACTOR will notify the 4
TH
CONTRACTING SQUADRON, SEYMOUR
JOHNSON AFB Contracting Officer in writing immediately upon entering an agreement (either oral or written) to transfer all or part of its stock or other ownership interest to any other party.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
1. Attachment 1 Specifications, entitled “SABER IX”
a) Section 01000 – General 8 Pages
b) Section 01560 – Environmental Protection 10 Pages
c) Section 02051 – Asbestos Removal, Cleanup, and Disposal 2 Pages
d) Section 02821 – Centipede Grass Hydro-seeding 10 Pages
e) Section 02938 – Sod 2 Pages
f) Section 16721 – Fire Detection, Alarm, and Reporting 12 Pages
2. Attachment 2 Schedule of Wage Rates
Decision No. Dated
a) NC150007 1/02/2015 4 Pages
b) NC150008 1/02/2015 4 Pages
c) NC150014 1/02/2015 4 Pages
d) NC150017 1/02/2015 4 Pages
e) NC150019 1/02/2015 4 Pages
f) NC150041 1/02/2015 5 Pages
g) NC150047 1/02/2015 5 Pages
h) NC150065 1/02/2015 4 Pages
i) NC150069 1/02/2015 4 Pages
j) NC150078 1/02/2015 4 Pages
k) NC150080 1/02/2015 4 Pages
l) NC150103 1/23/2015 5 Pages
m) NC150104 1/23/2015 5 Pages
3. Attachment 3 Past Performance Questionnaire w/ Cover Letter 7 Pages
4. Attachment 4 Offer Schedule 10 Pages
5. Attachment 5 Request for Proposal (RFP) for first (1 st ) Task Order
(Seed Project) to be awarded against the Basic Contract.
Project No. VKAG 14-1201
Title: Repair Restroom and Admin Offices, Bldg 3300
a) Statement of Objectives dated 7 Jul 15 4 Pages
b) Offer Schedule 1 Page
c) Government Drawings, Sheets G-1 dtd 16 Jan 15, A-1 (Rev. 1) dtd 29 Jun 15, M-1 dtd 16 Jan 15, and M-2 dtd 16 Jan 15, entitled “Repair Restroom and Admin Offices, Bldg 3300” 4 Pages
d) AF Form 66 (Seed Project) 1 Page
e) Facility Inspection/Assessment Letter dated 12 May 14 5 Pages
6. Attachment 6 SABER IX Location Plan, Sheet G-1, dated 31 Jan 14 1 Page
7. Attachment 7 AF Form 66 (Basic Contract) 1 Page
8. Attachment 8 Local Instructions 2 Pages
9. Attachment 9 Installation Design Guide 90 Pages
10. Attachment 10 Section C Description/Specifications/Statement of Work dated 7 Jul 15 40 Pages
11. Attachment 11 Determination of Contractor Responsibility 3 Pages
12. Attachnment 12 Special Events Pass Request 2 Pages
(End of Summary of Changes)
File details come from the government source that posted it. Updated .