Amendment_0001.pdf
PDF 22 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4809-14-R-0001
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3300.zip | ZIP file | |
| VKAG_14-1201_-_Standard.zip | ZIP file | |
| Pictures.zip | ZIP file | |
| Additional_As-Builts.zip | ZIP file | |
| QR_2_15_July_2015.pdf | ||
| Attachment_5c _Rev_1.pdf | ||
| Amendment_0005.pdf | ||
| Attachment_5a_Rev_1.pdf | ||
| SABER_SOW_Section_C_Rev_1_15_Jul_15.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Site_Visit_Minutes.pdf | ||
| QR_1_5_June_2015.docx | DOCX document | |
| Attach_3.pdf | ||
| SABER_SOW_Section_C_FINAL.docx | DOCX document | |
| Amendment_0002.pdf | ||
| SABER_SOW_Section_C_FINAL.docx | DOCX document | |
| Attach_2.pdf | ||
| Attach_11.pdf | ||
| Attach_8.pdf | ||
| Attach_9.pdf | ||
| Attach_12.pdf | ||
| Attach_7.pdf | ||
| Attach_3.pdf | ||
| Attach_1.pdf | ||
| Attach_6.pdf | ||
| Attach_5.pdf | ||
| RFP.pdf | ||
| Attach_4.xlsx | XLSX spreadsheet |
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to correct the site visit date in block 10 and proposal due date as show n below :
1. The preproposal date show n in block 10 on the SF1442 is revised from 9 Apr 15 to 9 Jun 15 to match the date in Section L, FAR 52.236-27.
2. The proposal due date w as inadvertently omitted from block 13 on the SF1442. The follow ing time/date is added to block 13A: 4:00PM EST on, 25 June 2015 to establish the proposal due date and time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-May-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4809-14-R-0001
X 9B. DATED (SEE ITEM 11)
26-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-May-2015
CODE
4TH CONTRACTING SQUADRON
1600 WRIGHT BROTHERS AVENUE, BLDG 3010
SEYMOUR JOHNSON AFB NC 27531-2459
FA4809 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4809-14-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time 25-Jun-2015 04:00 PM has been added.
The required performance has changed from Simplified Acquistion of Base Engineering Requirements (SABER IX) Indefinite-Delivery, Indefinite Quantity (IDIQ) contract. A pre-proposal conference/site visit is scheduled for 09 Apr 15 at 09:00 am (EST). Only one pre-proposal conference will be held. Site Visit(s) for each task order (TO) after contract award will be scheduled as required. 1. Please enter your CAGE code, Tax Identification Number (TIN) and DUNS number in Block 14.2. A seperate Notice to Proceed will issued for each task order.3. This requirement is an 8(a) Competitive Set-Aside with competition limited to 8(a) firms located within the geographical area serviced by the North Carolina District Office and other 8(a) construction firms with a bona fide place of business within the geographical competitive area and the assigned NAICS code. All other 8(a) BD Participants are deemed ineligible to submit offers.4. The SBA requirements number is 0460/14/402387/01.
The designated NAICS code is 236220.5. The DFAS office responsible for payment will be identified in each task order.6. The guaranteed minimum for the life of the contract is $2,000.00. The maximum contract value is $49,000,000.00. to Simplified Acquistion of Base Engineering Requirements (SABER IX) Indefinite-Delivery, Indefinite Quantity (IDIQ) contract. A pre-proposal conference/site visit is scheduled for 09 Jun 15 at 09:00 am (EST). Only one pre-proposal conference will be held. Site Visit(s) for each task order (TO) after contract award will be scheduled as required. 1. Please enter your CAGE code, Tax Identification Number (TIN) and DUNS number in Block 14.2. A seperate Notice to Proceed will issued for each task order.3. This requirement is an 8(a) Competitive Set-Aside with competition limited to 8(a) firms located within the geographical area serviced by the North Carolina District Office and other 8(a) construction firms with a bona fide place of business within the geographical competitive area and the assigned NAICS code. All other 8(a) BD Participants are deemed ineligible to submit offers.4. The SBA requirements number is 0460/14/402387/01. The designated NAICS code is 236220.5.
The DFAS office responsible for payment will be identified in each task order.6. The guaranteed minimum for the life of the contract is $2,000.00. The maximum contract value is $49,000,000.00..
(End of Summary of Changes)
File details come from the government source that posted it. Updated .