Attach 22 Seed Project Design Requirements - Revision 2 - 18 Nov 2020.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA469020R0005
Issued by
Department of the Air Force Air Combat Command

About this file

This solicitation is for multiple award construction contracts (MACC) at Ellsworth Air Force Base, South Dakota. The Air Force seeks to award five indefinite delivery indefinite quantity construction contracts for facilities work including carpentry, roofing, excavation, electrical, plumbing, sheet metal, painting, demolition, concrete, masonry, welding, HVAC, and asbestos removal. The base period is five years with five one-year options for a total of ten years. The minimum value is $1,000 and maximum is $95 million across all contracts. This is a 100% small business set-aside for service-disabled veteran-owned, women-owned, and HUBZone businesses with a NAICS code of 237990 and size standard of $39.5 million. Responses are due through the Beta SAM system by January 15, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Solicitation Amendment FA469020R00050009 SF 30.pdf PDF
Solicitation Amendment FA469020R00050008 SF 30.pdf PDF
Solicitation Amendment - FA469020R00050008.pdf PDF
Attach 4 EAFB Specifications - Revision 1 - 19 Nov 2020.doc DOC document
Attach 38 Solicitation Questions and Answers 18 Nov 2020.pdf PDF
Attach 1 General Provisions - Revision 1 - 19 Nov 2020.pdf PDF
Solicitation Conformed Amend 00008 - FA469020R00050008.pdf PDF
Amendment FA469020R00050007 SF 30.pdf PDF
Solicitation FA469020R00050007.pdf PDF
Solicitation Amendment FA469020R00050006 SF.pdf PDF
Attach 11 Section L - Revision 3 - 9 Nov 2020.pdf PDF
Attach 13 FACTS Sheet - Revision 2 - 9 Nov 2020.docx DOCX document
Attach 29 Haul Route.pdf PDF
Attach 19 Seed Project SOW - Revision 2 - 28 Oct 2020.pdf PDF
Attach 31-35 CAD format.zip ZIP file
Attach 36 Ellsworth AFB Special Provisions(MS Word).doc DOC document
Solicitation Amendment FA469020R00050005 SF 30.pdf PDF
Attach 28 Solicitation Questions and Answers 28 Oct 2020.pdf PDF
Attach 11 Section L - Revision 2 - 20 Oct 2020.pdf PDF
Solicitation Amendment FA469020R00050003 SF 30.pdf PDF
Attach 26 Solicitation Questions and Answers 15 Oct 2020.pdf PDF
Attach 13 FACTS Sheet - Revision 1 - 15 Oct 2020.pdf PDF
Attach 25 Solicitation Questions and Answers 9 Oct 2020.pdf PDF
Solicitation Amendment FA469020R00050002 SF 30.pdf PDF
Solicitation Amendment FA469020R00050001 SF 30.pdf PDF
Attach 23 Seed Project Site Utilities.pdf PDF
Attach 24 MACC Site Visit Meeting Minutes.pdf PDF
Attach 1 General Provisions.pdf PDF
Attach 6 WD SD20200001 Heavy Highway Statewide.pdf PDF
Attach 9 WD SD20200027 Building Meade.pdf PDF
Solicitation - FA469020R0005.pdf PDF
Attach 22 Seed Project Design Requirements.xlsx XLSX spreadsheet
Attach 8 WD SD20200003 Residential Meade.pdf PDF
Attach 20 Seed Project Bid Schedule.pdf PDF
Attach 15 Past Performance Questionnaire.docx DOCX document
Attach 13 FACTS Sheet.docx DOCX document
Attach 11 Section L.pdf PDF
Attach 4 Ellsworth AFB Special Provisions.pdf PDF
Attach 5 Ellsworth AFB Installation Facilities Standards.pdf PDF
Attach 7 WD SD20200002 Residential Pennington.pdf PDF
Attach 3 On Off Ramp Procedures.pdf PDF
Attach 16 Transmittal Letter.docx DOCX document
Attach 14 Teaming Partner Consent Letter.docx DOCX document
Attach 21 Seed Project Construction Cost Breakdown.xls XLS spreadsheet
Attach 10 WD SD20200029 Building Pennington.pdf PDF
Attach 12 Section M.pdf PDF
Attach 17 Client Authorization Letter.docx DOCX document
Attach 19 Seed Project SOW.pdf PDF
Attach 18 Seed Project FOPR.pdf PDF
Attach 2 Ordering Instructions.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DESIGN REQUIREMENTS

Revision 2 18 Nov 2020

No.DescriptionSourceParaProposal Location
Does the Proposal Include the Following Design Elements:
1See Appendix A for general location of new wash rack.SOW2.3.1
2Pre-engineered style building.SOW2.3.2
3Coating to protect structural steel members and fasters from corrosion due to high
moisture inside the wash bay.SOW2.3.3
4Minimum 72’ x 25’ building area.SOW2.3.4
5Minimum 72’ x 18’ bay area for washing.SOW2.3.5
6Minimum 16’ height clearance from floor in washing area.SOW2.3.6
7Minimum 4’ deep foundation walls with spread footings on select SDOT-grade fill. (Foundation design to be dependent on soil testing found during the investigative phase after award of the contract detailed below in Section 3.1 and 3.2. Contractor proposals for MACC source selection shall only be technically evaluated on 4’ deep foundations on spread footings detailed above.)SOW2.3.7
8Ribbed metal roof. Medium bronze color.SOW2.3.8
9Roof pitch 3:12.SOW2.3.9
1024” overhang roof eaves with metal soffit.SOW2.3.10
11Gutters and open faced downspouts adequately sized and anchored to the building. Provide splash blocks for downspouts to empty to.SOW2.3.11
12Snow guards mechanically attached to metal roof ribs.SOW2.3.12
13Exterior compatible with surrounding facilities.SOW2.3.13
148”x8”x16” Concrete masonry unit wainscot for the first 48” of exterior walls.SOW2.3.14
15Ribbed metal sheeting exterior walls on top of CMU wainscot. 24 gauge steel and light tan color.SOW2.3.15
16Insulated R19 walls and R30 roof minimum. Fiberglass insulation, batt or blow in, will not be accepted. Rigid insulation or spray in foam insulation is preferred.SOW2.3.16
17Interior water proof panels to protect walls and ceiling from water spray.SOW2.3.17
18Two (2) 14’ wide by 16’ tall, coiling, metal, insulated, powered garage doors.SOW2.3.18
19Coiling garage doors to be installed on the interior of the wash rack.SOW2.3.19
204” Concrete bollards protecting garage door entrances. Provide at both entrance and exit doors. Painted to match exterior door colors.SOW2.3.20
21Weather stripping around garage doors.SOW2.3.21
22Two (2) exterior metal doors to allow for personnel entry in wash rack near roll up garage doors.SOW2.3.22
23Best Lock 7 pin cylinders and cores for all doors.SOW2.3.23
24Concrete stoop by personnel doorsSOW2.3.24
25Sloped 6” reinforced concrete slab on grade floor.SOW2.3.25
26Provide epoxy floor coating with embedded grit for slip resistance on top of concrete floor. Contractor shall use Tennant Co. Eco-HTS 100™ or equal for the top coat and Eco-Crete SF/B™ or equal for the overlay coat.SOW2.3.26
27Trench drain for washing area and connected to sanitary sewer.SOW2.3.27
28Grit interceptor to protect lift station pumps and preferably located on the interior of the wash rack.SOW2.3.28
29Exhaust fan for wash area near roof level with start/stop switch in wash area.SOW2.3.29
30Indirect gas fired heating unit to prevent freezing in wash rack. Interlocked with exhaust fan. Heater shall be sized to maintain 65 degrees in the wash rack.SOW2.3.30
31Local controls for exhaust fan in wash area.SOW2.3.31
32Ensure ease of access to heating unit for maintenance personnel.SOW2.3.32
33Outdoor air intake for heating unit shall be protected from the prevailing northwest wind. Locate outdoor air intake preferably pointing south.SOW2.3.33
34Heat to be supplied near floor level. Prevent water from pooling in supply air diffusers.SOW2.3.34
35Tie into base EMCS (Honeywell). Provide monitoring and control for room temperature including low temperature alarm. Also provide controls for gas heater.SOW2.3.35
36Back flow preventer for water service.SOW2.3.36
37Hose bibs for connection to pressure washers, detergent mixer, and other washing equipment.SOW2.3.37
38Provide exhaust vent, gas, water, combustion air, and electricity for self-contained hot water pressure washer. See section II. D. for pressure washer.SOW2.3.38
39Small mechanical room for heating unit, electrical panel, water service entrance, space for a 55 gallon detergent tank, and pressure washer equipment.SOW2.3.40
40Interior and exterior access to mechanical room.SOW2.3.41
41Penetrations through mechanical room for pressure washer hoses.SOW2.3.42
42Provide building grounding system.SOW2.3.43
43Lightning protection system at recommendation of Designer of Record based on risk assessment analysis.SOW2.3.44
44Provide electrical outlets in wash rack for equipment. Include a minimum of 4 120v courtesy receptacles around the perimeter of the wash bay. Provide outlets rated for use in wash racks and near water. Provide covers for outlets not in use to better protect against water spray. Electrical equipment in the wash bay requires NEMA 4 ratings.SOW2.3.45
45Adequate LED lighting illuminating exterior entrances.SOW2.3.46
46Adequate LED interior lighting illuminating entire building.SOW2.3.47
47Gas utility meter. Meter shall be a Dresser Roots meter.SOW2.3.48
48Shutoff for gas service.SOW2.3.49
49Water utility meter. Meter shall be Badger dial type flow through meter.SOW2.3.50
50Curb stop for water service.SOW2.3.51
51Dedicated electrical utility meter for the wash rack. Meter shall be Itron Centron appropriately sized for building.SOW2.3.52
52All meters shall tie into the base automated reading system and be pulse capable.SOW2.3.53
53All site work as to provide proper drainage.SOW2.3.54
54Minimum 6” concrete roadways on min 6” aggregate base course and 8” min depth scarified and re-compacted subgrade entering and leaving wash rack. Roadway design to be dependent on soil testing and site conditions found during the investigative phase after award detailed below in Section 3.1 and 3.2.SOW2.3.55
55New concrete roadways dowelled to existing roadwaysSOW2.3.56
56Allow for tandem MHU-110 trailers to access and leave wash rack. Turning radius of tandem MHU-110 trailers is 45 degrees.SOW2.3.57
57Prior to and during construction the contractor shall have an erosion control plan in place.SOW2.3.58
58Contractor shall provide seeding, fertilizing, mulching, importing and placing of 3” topsoil on all grassed areas disturbed by construction.SOW2.3.59
59A vehicle tracking control or stabilized rock construction entrance shall be constructed for vehicles entering the work site.SOW2.3.60
60Due to the proximity and operations near the airfield the contractor shall actively control Foreign Object Debris (FOD) during the entirety of construction. The contractor shall be responsible for keeping Tyndall Road and all access roads free of FOD from the construction area.SOW2.3.61
61During construction the contractor shall at a minimum provide concrete tests and soil compaction tests as recommended by the Designer of Record.SOW2.3.62
Does the Proposal Include the Following FFE Items:
62Aaladin Series 71-530 heated power washer or equal. See Appendix C for pressure washer required salient features.SOW2.4.1
63Remote control for pressure washer centrally located in wash area.SOW2.4.2
64Provide 2 pressure washer wands/guns for simultaneous use.SOW2.4.3
65Provide hoses for pressure washer capable of reaching entire wash area. The hose reels shall be mounted on each of the long, 72’ sides of the wash bay, so users have access to a pressure wand on either side of the wash bay.SOW2.4.5
66Wall mount hose reels.SOW2.4.6
67Pressure washer wand/gun wall mounts for hanging and storage.SOW2.4.7
68Water Softener sized to support pressure washer.SOW2.4.8
Does the Proposal Include the Following Drawings:
69Cover SheetSOW3.3.1
70Site SurveySOW3.3.2
71Existing UtilitiesSOW3.3.3
72Existing/Final Site & Grading Plan(s)SOW3.3.4
73Stormwater Protection and Erosion Control PlanSOW3.3.5
74Underground Utility PlanSOW3.3.6
75Utility DetailsSOW3.3.7
76Floor PlanSOW3.3.8
77Structural Plans and DetailsSOW3.3.9
78Architectural ElevationsSOW3.3.10
79Wall Sections and DetailsSOW3.3.11
80Door ScheduleSOW3.3.12
81Room Finish ScheduleSOW3.3.13
82Mechanical Plans, Schedules, and DetailsSOW3.3.14
83Plumbing Riser DiagramSOW3.3.15
84Power and Lighting PlanSOW3.3.16
Does the Proposal Include the Following Calculations:
85Structural Wind/Snow Loads Structural Wind/Snow LoadsSOW3.4.1
86Heating/Ventilation LoadsSOW3.4.2
87Electrical LoadsSOW3.4.3
88Lightning Protection Risk Analysis and RecommendationSOW3.4.4
Does the Proposal Include the Following Specifications:
89Were the specs in UFGS Format?SOW3.5
90001000 EAFB Special ProvisionsSOW3.5.1
91001300 EAFB Submittal ProcedureSOW3.5.2
92Submittal ScheduleSOW3.5.3
93017800 Contract CloseoutSOW3.5.5
9401800 Ellsworth Environmental ProvisionsSOW3.5.6
95Cast-In-Place ConcreteSOW3.5.7
96CMU WainscotSOW3.5.8
97Trench DrainSOW3.5.9
98Metal Building SystemsSOW3.5.10
99Metal Wall and Roof PanelsSOW3.5.11
100Door HardwareSOW3.5.12
101Overhead Coiling DoorsSOW3.5.13
102EarthworkSOW3.5.14
103SeedingSOW3.5.15
104Aggregate Base CourseSOW3.5.16
105Portland Cement Concrete for RoadsSOW3.5.17
106Water UtilitySOW3.5.18
107Sewer UtilitySOW3.5.19
108Gas UtilitySOW3.5.20
109HVACSOW3.5.21
110ElectricalSOW3.5.22