This document consists of meeting minutes from a pre-solicitation/proposal conference for two federal contract opportunities: the GC-MATOC (FA468624R0011) and the Transportation and Paving IDIQ (FA468624R0003).

The Transportation and Paving IDIQ contract requires the contractor to provide design, labor, equipment, materials, and other necessary items for airfield and general paving work at Beale Air Force Base and other locations under the contractor's responsibility. The solicitation is a 100% small business set-aside, with the government intending to award between 5-7 IDIQ contracts. The contract has a base period of 5 years, with additional ordering periods up to a total of 10 years or $500 million. Key topics discussed include teaming agreements, joint ventures, past performance, local office requirements, and scoring/evaluation criteria. The solicitation is anticipated to be released soon with a 30-day response period.

View the file

Other files

File Type Posted
Solicitation Amendment FA468624R00030005 SF 30.pdf PDF
RFI-05-Solicitation Phase-TP.pdf PDF
7. Document Verification Checklist 8 May 2024.docx DOCX document
REFERENCE ONLY-File Nomenclature.docx DOCX document
Solicitation Amendment FA468624R00030004 SF 30.pdf PDF
10. Section L - Instructions, Conditions, and Notices to Offerors 2 May 24.pdf PDF
RFI-04-Solicitation Phase-TP.pdf PDF
Solicitation Amendment FA468624R00030003 SF 30.pdf PDF
RFI-03-Solicitation Phase-TP.xlsx XLSX spreadsheet
10. Section L - Instructions, Conditions, and Notices to Offerors 29 Apr 24.pdf PDF
Solicitation Amendment FA468624R00030002 SF 30.pdf PDF
4. VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company.docx DOCX document
RFI-02-Solicitation Phase-TP.pdf PDF
10. Section L - Instructions, Conditions, and Notices to Offerors 18 Apr 24.pdf PDF
8. Cost Worksheet-04182024.xlsx XLSX spreadsheet
3. VOL 3-EXPERIENCE-Last 4 Contract Number-Company Name.docx DOCX document
Solicitation Amendment FA468624R00030001 SF 30.pdf PDF
11. Section M - Evaluation Factors 05 Apr 24.pdf PDF
RFI-01-Solicitation Phase-TP.docx DOCX document
4. VOL 3-PAST PERFORMANCE-Last 4 Contract Number-Company.docx DOCX document
12. WDOL - 23 Feb 24.pdf PDF
2. Self Scoring Worksheet 22 Mar 24.xlsx XLSX spreadsheet
5. VOL 6-RECALL-Last 4 Contract Number-Company Name.docx DOCX document
10. Section L - Instructions, Conditions, and Notices to Offerors 22 Mar 24.pdf PDF
3. VOL 3-EXPEREINCE-Last 4 Contract Number-Company Name.docx DOCX document
9. Highest Technically Rated Offeror (HTRO) Guide.docx DOCX document
11. Section M - Evaluation Factors 22 Mar 24.pdf PDF
7. Document Verification Checklist.docx DOCX document
13. TASK ORDER PROCEDURES - 22 Mar 24.docx DOCX document
6. Contractor Responsibility GSA Form 527.pdf PDF
0. Solicitation - FA468624R0003 - 24 Mar 24.pdf PDF
1. Specifications-CAO 28 FEB 24-TP.pdf PDF
8. Cost Worksheet - 22 Mar 24.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 9TH RECONNAISSANCE WING (ACC)

BEALE AIR FORCE BASE, CALIFORNIA

15 Apr 2024

MEMORANDUM FOR RECORD

FROM: 9 CONS/PKA

SUBJECT: Pre-Solicitation/Proposal Conference Meeting Minutes

1. The purpose of this memorandum is to summarize the pre-solicitation/proposal conference for the GC-MATOC (FA468624R0011) and the Transportation and Paving IDIQ

(FA468624R0003), respectively.

2. The meeting was held on April 11th at 0900 in the King Conference Room of the 9th

Contracting Squadron, Beale AFB, CA.

3. The following members were in attendance from the Government:

a. Mr. Robert Watts – 9CONS

b. Mrs. Cali McVay – 9CONS

c. Mr. Gabe Fickle – 9CONS

d. TSgt Theodore Church-Reeves – 9CONS

e. SSgt Makenna Watkins – 9CONS

f. Miss Cassie Medlin - 9CES

4. The following vendors were in attendance:

Mallory

J Miller

Raymond Tems

Troy Smith

Emily

Bobby Ameen

Angie Martinez Stephanie

(Legend)

Mr Burns Don C

Hailey Collier

Brendon Loucks Lindsay Tague Rhonda Simpson Diane Jump SC

Mark Vaca

Jessica Salazar Ryan Fasone Tommy Bartlett Stacy Summers

Justin Min

Legend

Construction

Steve E Bennett Martin, STRATA a|p

Wendy Yam

BDavidenko

Dan Butler Brian Davidenko Heath Sanders Russell

McHatton

Tracey

Lawrence

Collins

Chandler

Harrison

Jonathan

Coltogirone

David Le

Kendra Wagstaff

Gary Bergman Dave Van

Mouwerik

Jennifer Folkers Kara Cogger Ron Harvey BC

Schmidt

Stephen Miller Glenda Hay Roy Aqeel

Mohammad

Ro

Kerlita Hacker Micah Pinney Elizabeth Cabral Carrie Schmidt

Poyner

BC Schmidt

Steve

Mohammad

Quin Rescigno Angie Martinez

5. The meeting primarily discussed the allocation of work under specific specialty codes in government contracts. Participants debated whether specialty contractors should bid directly or collaborate with general contractors. There was also discussion about how scoring works and whether there are advantages to specializing in certain areas. Ultimately, it was suggested that general contractors would likely have an advantage in selecting specialty subcontractors.

a. Teaming Agreements vs. Joint Ventures: There's a distinction being made between regular teaming agreements and joint ventures. Joint ventures involve more formal processes, including approval from the Small Business

Administration (SBA), and allow for the combined past performance of the partners to be considered. Teaming agreements, on the other hand, are simpler agreements between two companies to collaborate on a specific project.

b. Past Performance Consideration: Joint ventures allow for the past performance of both partners to be considered, which can be advantageous in bidding for contracts. Teaming agreements may not have the same weight in terms of past performance evaluation.

c. Concerns and Clarifications: There are concerns raised about whether using teaming agreements instead of joint ventures might open the door to potential protests from competitors. However, there's also clarification that teaming agreements can still be utilized, but they may not carry the same weight as joint ventures in terms of past performance evaluation.

d. Contract Thresholds: There's discussion about how joint ventures might affect contract thresholds, particularly in terms of size standards for small businesses.

It's clarified that operating under a joint venture might change the threshold classification, but specific details may vary.

e. Emphasis on contractor experience with design-build projects, environmental permits, and financial responsibility.

f. Consideration of adjusting project completion timeframes due to factors like the COVID-19 pandemic.

g. Minimum score requirements and bonus points for contractors meeting certain criteria.

h. Clarification on questions and procedures for submitting bids.

i. Contractor Scoring: Contractors are responsible for scoring themselves based on their qualifications and previous contracts. The government will only subtract points if a submitted contract is irrelevant to the work being contracted. Contractors can earn bonus points for meeting certain criteria, but these are not added by the government.

j. Solicitation Release: The solicitation for the GC may talk is anticipated to be released soon, with a 30-day response period. The contract is expected to span a base period of five years, with additional ordering periods up to a total of ten years or until the contract reaches a limit of $500 million, whichever comes first.

k. The discussion also touches upon the structure of proposals for transportation IDIQ contracts, emphasizing the importance of demonstrating relevant experience and capabilities without needing a perfect score in every category. Participants are encouraged to ask questions and seek clarification on the HR process and related documents.

l. RFI (Request for Information) Details: The participants discuss the RFI, including its due date and the process for posting additional amendments or answers to questions.

m. Amendments and Questions: They mention posting the 1st amendment and plan to address more questions. Participants are encouraged to submit new questions if they have any.

n. Teaming Arrangements: Discussion about teaming arrangements, including formalized teaming arrangements for past performance and SBA, joint ventures, and mentor-protege agreements.

o. Multiple Awards: The intention to target 5 awards, but it may vary depending on proposals received.

p. Local Office Requirement: Clarification is sought regarding the requirement for a local office within the SBA office territory of specific cities.

q. Discussion on Tiebreaker Methodology: Changes in the tiebreaker methodology for cost evaluation are mentioned, and participants are encouraged to seek clarification if needed.

r. Conclusion: The meeting concludes with a round of final comments and thanks.

6. The following questions were asked in relation to the GC-MATOC, the questions asked related to the transportation IDIQ are answered in RFI02, found on SAM.gov:

a. Does the subcontractor definition include subconsultants like Testing, Traffic Control?

In accordance with FAR Subpart 2.1, a subcontractor provides supplies or services for the performance of the prime contractor a subcontract, whereas FAR 31.205-33 defines a consultant as members belonging to a specific profession or possessing a special skill and who are not officers or employees of the contractor. Subcontractors are subject to the control of the prime contractor and are responsible for delivering a portion of the contracted work or supplies. A subconsultant involves providing specialized expertise or advisory services rather than directly performing tasks or services under the prime contract. Subconsultants such as Testing and

Traffic Control may fall within the subcontractor definition depending on their role and the contractual arrangements. It must be demonstrated that a subconsultant supplied goods or services for the execution of the prime contract and that they are under the control of the prime contractor.

b. If the project is allocated the 236220 NAICS but has utility work, can that be used for line 33?

No. The work samples submitted must fall under the primary NAICS code that corresponds to the self-scoring section for which they are being submitted. Work samples can be provided through joint ventures or official partnership agreements. This allows for the inclusion of relevant work samples, even if they were performed in collaboration with other entities. It is essential to ensure that the work samples accurately reflect the capabilities and qualifications of the entity in relation to the contract requirements.

c. What are you looking for in terms of the Professional Employee Compensation Plan?

There is not a specific template related to the Professional Employee Compensation Plan submission requirement. In accordance with FAR 22.1103, offerors shall submit for evaluation a total compensation plan setting forth proposed salaries and fringe benefits for professional employees working on the contract. Supporting information will include data, such as recognized national and regional compensation surveys and studies of professional, public, and private organizations, used in establishing the total compensation structure. Plans indicating unrealistically low professional employee compensation may be assessed adversely as one of the factors considered in making an award.

d. Do you have definitions for the "personnel" for the Volume 3 Bonus Criteria?

In volume 3, the word “Personnel” does not exist. The word “Professional” does. Examples of

Professional Certifications are: Becoming a CCM | Construction Management Association of

America (cmaanet.org), AIC | American Institute of Constructors (aic-builds.org) , PMP

Certification Training Course Online - (Bestseller ⭐) (simplilearn.com), Certified Construction

Quality Management Professional (CCQMP) - AIBM US

e. If I have a contract for a lease for office space pending award of contract, is that sufficient vs having a current local office?

Offerors must have a bona fide registered office within the Fresno, San Francisco, and

Sacramento SBA Districts. Offices must be registered in those districts prior to proposal submission to be considered eligible for award.

f. Will you provide project sheet attachments?

Attached to this document is the Five (5) Year Work Plan for Beale, AFB.

g. Are you required to have an office in Northern California? Or can it be anywhere in

California?

https://www.cmaanet.org/certification/certified-construction-manager/becoming-ccm https://www.cmaanet.org/certification/certified-construction-manager/becoming-ccm https://aic-builds.org/ https://www.simplilearn.com/project-management/pmp-certification-training?eventname=Mega_Menu_New_Select_Course https://www.simplilearn.com/project-management/pmp-certification-training?eventname=Mega_Menu_New_Select_Course https://aibm.us/certified-construction-quality-management-professional-cqmp/ https://aibm.us/certified-construction-quality-management-professional-cqmp/

This acquisition is solicitated as a 100% total Small Business Set-aside. Eligible Small

Businesses are required to have bona fide offices located, and registered, within the San

Francisco, Fresno, or Sacramento SBA regional districts. Use of military installation addresses being used as registered offices with the SBA will result in ineligibility. Please note that due to a

Moratorium for 8(a)s, there is no restriction on having bona fide offices in the above referenced districts.

h. How will all this be verified? Projects as verified NAICS by Gov Spending or other database? Staff, Payroll records?

Please refer to Sections L and M of the Solicitation which details evaluation processes and criteria for submitted work samples.

i. Has anyone worked on SCIF’s before?

The GC-MATOC SOW encompasses the full range of methods, technologies, and supporting activities necessary to conduct project construction at Beale AFB, CA and other locations for which Beale AFB is responsible to maintain in accordance with technical and regulatory requirements.

j. Are you going to allow the Teaming Agreements for Past Performance on this contract as well?

The Past Performance section has been eliminated from the self-scoring worksheet.

k. Is this a multiple award?

This Solicitation is for a Multiple Award Task Order Contract, Indefinite Delivery Indefinite

Quantity (IDIQ) contract, with the government intending to award between five (5) and seven (7) contracts.

7. Below is the contact information for those who shared:

- Dan Butler: dan.butler@puyenpa.com, 719-428-9226

- Steve Mohammad: smohammad@ieeci.com

- Chandler Harrison: charrison@cleanarcpower.com, 916-410-8534

- Lindsay Tague: david@mountainm.com, 209-743-5939

- Glenda Hay: glenda@atwoodhay.com

- Troy Smith: troy@trinitybuilders.com, 916-838-2113

- Mr Burns: 214-287-6239

- Justin Min: justinmin@mikinc.us

- Dave Van Mouwerik: dave.vanmouwerik@andersonburton.com

- Bobby Ameen: Bobby@24hrc.us

- Carrie Schmidt Poyner: cs@bcschmidt.com

- Jonathan Coltogirone: jonathan@gideonusa.com

- Kara Cogger: kara@cavalryconsulting.com

- Stephen Miller: smiller@cleanarcpower.com, (916) 992-3138

- Angie Martinez: angiemartinez@martinezconstruction.com, 321-349-2000

- Kerlita Hacker: k.hacker@shmechanicalinc.com, (707) 450-7808

- Bennett Martin: Bmartin@strataap.com

- Glenda Hay: glenda@atwoodhay.com

- Micah Pinney: micah.pinney@urs.com

- Elizabeth Cabral: elizabeth.cabral@jacobs.com

8. If there are any questions about this MFR contact SSgt Makenna Watkins at makenna.watkins@us.af.mil or Mrs. Cali McVay at cali.mcvay.1@us.af.mil .

MAKENNA WATKINS, SRA, USAF

Contracting Specialist

9th Contracting Squadron

Beale AFB, CA mailto:makenna.watkins@us.af.mil mailto:cali.mcvay.1@us.af.mil

Five (5) Year Work Plan - Beale AFB Repair Intelligence Facility, B2145 Repair Water Main, 18-inch Return Line, 3MG Tank to Flightline, F8611 Repair Frisky Dam, Dam #8 (Pond 4 - soil donor site) Construct Logistics Warehouse (IB Express) Repair Consolidated Ops/Mx, B1086 (FS Project) Upgrade Aircraft Shelter Fire Suppression, B1044, B1045, B1067 Repair Jr. Enlisted Airmen Dormitory; B24110 Repair Jr. Enlisted Airmen Dormitory; B24114 Repair High-Voltage (12kV) Ckts; F8605/8638 (NAVAIDS/GATR) ADAL Wheatland ECP & Railroad Crossing Repair of Med Group Parking (Terrace to comply w/ ADA reqs) Construct Airfield Lighting Maintenance Facility, B1015 Repair Runway North and South Airfield Overrun, F8280 Repair/Construct Addition to Corrosion Control Facility, B1071 Repair Housing Water Tank, F4802 Repair Maintenance Depot (Quonset Hut B2140) (Phase 2/2- Hinge project for B2145 FS) Repair Road and Culvert at Doolittle Gate Renovate SERE Training/Fitness Pool, F2423 Repair Fire Suppression and Detection/Notification at PAVE PAWS Compound B5761 & B5760 Repair Upper Blackwelder Lake (Main Base Flood Control) Repair High-Voltage (12kV) Ckts; F8605/8638 (Flightline and Munitions) Repair Fuel Systems Hangar and Upgrade Fire Suppression, B1075 (Dock 3) Renovate U-2 Aircraft Maintenance Facility, B1025 (FS Project) Repair 60kV Circuit (B Street Substation to East Switch Yard) Repair Logistics Warehouse Fire Protection, B1023 Repair 9 RW HQ, B2161 (Phase 3/3- Hinge project for B1086 FS) Repair A St Bridges; F2626 & F2608 Repair A Street Flood Control Canal Repair Dormitory, B25307 Construct Addition to Vehicle Management; B2497 Construct Addition to Vehicle Operations; B1013 Repair Hangar and Upgrade Fire Suppression, B1074 Replace GOV Gas Station Construct G2 Methane Plant Interconnect Repair Taxiway Alpha Shoulders, F8295 Construct Harris Fitness Center Parking Lots Repair Wastewater Collection System; Infiltration and Inflow Convert B2400 to Installation Resiliency Operations Center (IROC) Convert 60kV Circuit to 12kV; East Switch Yard to Vassar Substation w/ Interconnect Upgrade Aircraft Shelter Fire Suppression, B1069 Repair Dormitory, B25309 Repair airfield pavements Repair Water Main, Pump House to Pave Paws Tank Repair Hutchison Creek (Canal) Repair Three Bridges; F223, F625, F2124 (Hutchinson Creek) Upgrade Aircraft Hanger Fire Suppression, B11200

Construct ISR Campus Parking Lot Repair Vassar Lake Water Storage Repair Flightline (Doolittle) ECP Repair water main B701 to B11025 Repair 12kV line Repair Main Base Water Mains (J Street to Main Base) Add/Alter Global Hawk Storage, B1220 Construct Wild land Fire Vehicle Storage Facility Repair EOD Facility, B26188 Repair Domitory, B24176 Repair Bowling Alley Repair A Street Upgrade Aircraft Shelter Fire Suppression, B1068 Construct Addition to South Aircraft Parking Apron Repair WWTP equalization pond Demolish Bedsprings Dam Demolish SR-71 Shelters, B1057 and B1058 (Gate 1A, 18121 SF) Demolish Electrical Utilities (Beale South, TLF, Gold Country, Saddle Club and Pave Paws) (Gate 2B) Demolish Unpermitted Landfill (Toxic Buttes) (Gate 2C, XXXXX SF) Demolish WWII Concrete Foundations (J St, Rod & Gun, C St) (Gate 2C, 20k SF) Demolish Goose Lake Dam Repair Taxiway Foxtrot Shoulders, F8295 Demolish and Recontour Lower Blackwelder Dam (Habitat Restoration) Demo Unpermitted Landfill (Upper Blackwelder Dam to Lower Blackwelder Dam) Demo Housing Water Tank, Fac 4809 Demolish B355 Demo Vacated Portions Consolidated Ops/Mx B1086 (Phase 6/6- Demo project for B1086 Facility Strategy) Demolish EOD Dam Demolish Base Septic TanksA46A1A47:AA47:A76

Five (5) Year Work Plan - Beale AFB GC-MATOC.pdf
Sheet1
Mallory:
J Miller:
Raymond Tems:
Troy Smith:
Emily:
Bobby Ameen:
Angie Martinez:
Stephanie Legend:
Mr Burns:
Don C:
Hailey Collier:
Brendon Loucks:
Lindsay Tague:
Rhonda Simpson:
Diane Jump SC:
Mark Vaca:
Jessica Salazar:
Ryan Fasone:
Tommy Bartlett:
Stacy Summers:
Justin Min:
Legend Construction:
Steve E:
Bennett Martin STRATA ap:
Wendy Yam:
BDavidenko:
Dan Butler:
Brian Davidenko:
Heath Sanders:
Russell McHatton:
Chandler Harrison:
Jonathan Coltogirone:
David Le:
Gary Bergman:
Dave Van Mouwerik:
Jennifer Folkers:
Kara Cogger:
Ron Harvey BC Schmidt:
Stephen Miller:
Glenda Hay:
Roy:
Aqeel Mohammad:
Ro:
Kerlita Hacker:
Micah Pinney:
Quin Rescigno:
Elizabeth CabralAngie Martinez:
Carrie Schmidt Poyner BC SchmidtAngie Martinez:
Steve MohammadAngie Martinez:
Repair Intelligence Facility B2145:
Repair Water Main 18inch Return Line 3MG Tank to Flightline F8611:
Repair Frisky Dam Dam 8 Pond 4 soil donor site:
Construct Logistics Warehouse IB Express:
Repair Consolidated OpsMx B1086 FS Project:
Upgrade Aircraft Shelter Fire Suppression B1044 B1045 B1067:
Repair Jr Enlisted Airmen Dormitory B24110:
Repair Jr Enlisted Airmen Dormitory B24114:
Repair HighVoltage 12kV Ckts F86058638 NAVAIDSGATR:
ADAL Wheatland ECP Railroad Crossing:
Repair of Med Group Parking Terrace to comply w ADA reqs:
Construct Airfield Lighting Maintenance Facility B1015:
Repair Runway North and South Airfield Overrun F8280:
RepairConstruct Addition to Corrosion Control Facility B1071:
Repair Housing Water Tank F4802:
Repair Road and Culvert at Doolittle Gate:
Renovate SERE TrainingFitness Pool F2423:
Repair Upper Blackwelder Lake Main Base Flood Control:
Repair HighVoltage 12kV Ckts F86058638 Flightline and Munitions:
Repair Fuel Systems Hangar and Upgrade Fire Suppression B1075 Dock 3:
Renovate U2 Aircraft Maintenance Facility B1025 FS Project:
Repair 60kV Circuit B Street Substation to East Switch Yard:
Repair Logistics Warehouse Fire Protection B1023:
Repair 9 RW HQ B2161 Phase 33 Hinge project for B1086 FS:
Repair A St Bridges F2626 F2608:
Repair A Street Flood Control Canal:
Repair Dormitory B25307:
Construct Addition to Vehicle Management B2497:
Construct Addition to Vehicle Operations B1013:
Repair Hangar and Upgrade Fire Suppression B1074:
Replace GOV Gas Station:
Construct G2 Methane Plant Interconnect:
Repair Taxiway Alpha Shoulders F8295:
Construct Harris Fitness Center Parking Lots:
Repair Wastewater Collection System Infiltration and Inflow:
Convert B2400 to Installation Resiliency Operations Center IROC:
Upgrade Aircraft Shelter Fire Suppression B1069:
Repair Dormitory B25309:
Repair airfield pavements:
Repair Water Main Pump House to Pave Paws Tank:
Repair Hutchison Creek Canal:
Repair Three Bridges F223 F625 F2124 Hutchinson Creek:
Upgrade Aircraft Hanger Fire Suppression B11200:
Construct ISR Campus Parking Lot:
Repair Vassar Lake Water Storage:
Repair Flightline Doolittle ECP:
Repair water main B701 to B11025:
Repair 12kV line:
Repair Main Base Water Mains J Street to Main Base:
AddAlter Global Hawk Storage B1220:
Construct Wild land Fire Vehicle Storage Facility:
Repair EOD Facility B26188:
Repair Domitory B24176:
Repair Bowling Alley:
Repair A Street:
Upgrade Aircraft Shelter Fire Suppression B1068:
Construct Addition to South Aircraft Parking Apron:
Repair WWTP equalization pond:
Demolish Bedsprings Dam:
Demolish SR71 Shelters B1057 and B1058 Gate 1A 18121 SF:
Demolish Unpermitted Landfill Toxic Buttes Gate 2C XXXXX SF:
Demolish Goose Lake Dam:
Repair Taxiway Foxtrot Shoulders F8295:
Demolish and Recontour Lower Blackwelder Dam Habitat Restoration:
Demo Housing Water Tank Fac 4809:
Demolish B355:
Demolish EOD Dam:
Demolish Base Septic TanksA46A1A47AA47A76:
2024-04-18T14:18:31-0700
WATKINS.MAKENNA.CAITLIN.1545678884

File details come from the government source that posted it. Updated .