12. WDOL - 23 Feb 24.pdf

PDF 235 KB Posted

Attached to
Transportation/Paving IDIQ Federal contract opportunity
Solicitation number
FA468624R0003
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a wage determination for residential construction projects published by the Department of Labor. It lists the prevailing wage rates and fringe benefit requirements for various construction trade workers in California counties. The wage determination covers a wide range of trades including asbestos workers, bricklayers, carpenters, electricians, elevator mechanics, ironworkers, laborers, plasterers, and others. Wage rates are specified for multiple geographic areas within California. The wage determination includes details on applicable executive orders, wage rate adjustments, and special pay provisions for certain work conditions. It serves as the required wage rates for any federally-funded residential construction contracts in the listed counties.

The related federal contract opportunity is a solicitation from the Department of the Air Force for a Transportation/Paving Indefinite Delivery Indefinite Quantity (IDIQ) contract. The Contractor shall provide design, labor, equipment, materials, and other items to accomplish airfield and general paving work. The solicitation number is FA468624R0003.

View the file

Other files for this federal contract opportunity

Other files attached to Transportation/Paving IDIQ, newest first.
File Type Posted
Solicitation Amendment FA468624R00030005 SF 30.pdf PDF
7. Document Verification Checklist 8 May 2024.docx DOCX document
RFI-05-Solicitation Phase-TP.pdf PDF
10. Section L - Instructions, Conditions, and Notices to Offerors 2 May 24.pdf PDF
REFERENCE ONLY-File Nomenclature.docx DOCX document
RFI-04-Solicitation Phase-TP.pdf PDF
Solicitation Amendment FA468624R00030004 SF 30.pdf PDF
RFI-03-Solicitation Phase-TP.xlsx XLSX spreadsheet
10. Section L - Instructions, Conditions, and Notices to Offerors 29 Apr 24.pdf PDF
Solicitation Amendment FA468624R00030003 SF 30.pdf PDF
10. Section L - Instructions, Conditions, and Notices to Offerors 18 Apr 24.pdf PDF
Meeting Minutes 04112024-TP GC-MATOC.pdf PDF
8. Cost Worksheet-04182024.xlsx XLSX spreadsheet
RFI-02-Solicitation Phase-TP.pdf PDF
Solicitation Amendment FA468624R00030002 SF 30.pdf PDF
4. VOL 4-PAST PERFORMANCE-Last 4 Contract Number-Company.docx DOCX document
Solicitation Amendment FA468624R00030001 SF 30.pdf PDF
RFI-01-Solicitation Phase-TP.docx DOCX document
11. Section M - Evaluation Factors 05 Apr 24.pdf PDF
3. VOL 3-EXPERIENCE-Last 4 Contract Number-Company Name.docx DOCX document
5. VOL 6-RECALL-Last 4 Contract Number-Company Name.docx DOCX document
9. Highest Technically Rated Offeror (HTRO) Guide.docx DOCX document
3. VOL 3-EXPEREINCE-Last 4 Contract Number-Company Name.docx DOCX document
13. TASK ORDER PROCEDURES - 22 Mar 24.docx DOCX document
8. Cost Worksheet - 22 Mar 24.xlsx XLSX spreadsheet
7. Document Verification Checklist.docx DOCX document
6. Contractor Responsibility GSA Form 527.pdf PDF
4. VOL 3-PAST PERFORMANCE-Last 4 Contract Number-Company.docx DOCX document
1. Specifications-CAO 28 FEB 24-TP.pdf PDF
0. Solicitation - FA468624R0003 - 24 Mar 24.pdf PDF
11. Section M - Evaluation Factors 22 Mar 24.pdf PDF
10. Section L - Instructions, Conditions, and Notices to Offerors 22 Mar 24.pdf PDF
2. Self Scoring Worksheet 22 Mar 24.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: CA20240019 02/23/2024

Superseded General Decision Number: CA20230019

State: California

Construction Type: Residential

Counties: Alameda, Contra Costa, El Dorado, Marin, Monterey, Napa, Placer, Sacramento, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano, Sonoma, Sutter, Yolo and Yuba Counties in California.

RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 01/12/2024 2 01/19/2024 3 01/26/2024 4 02/09/2024 5 02/16/2024 6 02/23/2024

ASBE0016-002 02/01/2023

AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN

MATEO & SANTA CLARA COUNTIES

AREA 2: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO,

SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, & YUBA COUNTIES

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems) Area 1......................$ 80.91 23.82 Area 2......................$ 62.26 23.82

ASBE0016-009 01/01/2021

AREA 1: EL DORADO, MONTEREY, PLACER, SACRAMENTO, SAN BENITO,

SANTA CRUZ, SOLANO, SANOMA, SUTTER, YOLO & YUBA COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN

MATEO & SANTA CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 30.45 10.60 Area 2......................$ 36.53 9.27

BRCA0003-001 08/01/2022

Rates Fringes

MARBLE FINISHER..................$ 39.20 18.31

BRCA0003-002 05/01/2022

Rates Fringes

BRICKLAYER

( 7) Marin, Napa, San Francisco, San Mateo, Solano, Sonoma..............$ 53.69 26.03 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 53.61 23.81 ( 9) El Dorado, Placer, Sacramento, Sutter..........$ 49.32 22.65

(16) Monterey, Santa Cruz...$ 50.78 25.42

SPECIALTY PAY:

(A) Underground work such as tunnel work, sewer work, manholes, catch basins, sewer pipes and telephone conduit shall be paid $1.25 per hour above the regular rate. Work in direct contact with raw sewage shall receive $1.25 per hour in addition to the above.

(B) Operating a saw or grinder shall receive $1.25 per hour above the regular rate.

(C) Gunite nozzle person shall receive $1.25 per hour above the regular rate.

BRCA0003-007 07/01/2022

Rates Fringes

TERRAZZO FINISHER................$ 41.93 18.98

TERRAZZO WORKER..................$ 56.84 27.53

FOOTNOTE: Base machine operator: $1.00 per hour additional.

BRCA0003-009 08/01/2022

Rates Fringes

MARBLE MASON.....................$ 56.98 28.54

BRCA0003-012 04/01/2022

Rates Fringes

TILE FINISHER

Alameda, Contra Costa, Marin, Monterey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano................$ 33.86 17.74 El Dorado, Placer, Sacramento, Sutter, Yolo, Yuba........................$ 31.12 16.11 Sonoma......................$ 31.89 17.18 Tile Layer Alameda, Contra Costa, Marin, Monterrey, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano..........$ 55.41 20.87 El Dorado, Placer, Sacramento, Sutter, Yolo, Yuba........................$ 51.02 19.35 Sonoma......................$ 52.28 20.79

CARP0022-001 07/01/2023

San Francisco County

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11

CARP0035-005 07/01/2021

AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties

AREA 2: Monterey, San Benito & Santa Cruz Counties

AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties

Rates Fringes

Drywall Installers/Lathers:

Area 1......................$ 54.85 31.93 Area 2......................$ 48.97 31.93 Area 4......................$ 48.12 31.93 Drywall Stocker/Scrapper Area 1......................$ 27.43 18.58 Area 2......................$ 24.49 18.58 Area 4......................$ 24.07 18.58

CARP0035-009 07/01/2020

Marin County

Rates Fringes

CARPENTER

Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0046-001 07/01/2023

El Dorado (West), Placer (West), Sacramento and Yolo Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold &

Steel Shoring Erector, Saw Filer.......................$ 54.66 33.52 Journeyman Carpenter........$ 54.51 33.52 Millwright..................$ 57.01 35.11

Footnote: Placer County (West) includes territory West of and including Highway 49 and El Dorado County (West) includes territory West of and including Highway 49 and territory inside the city limits of Placerville.

CARP0046-003 07/01/2023

El Dorado (East), Placer (East), Sutter and Yuba Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 53.31 33.52 Journeyman Carpenter........$ 53.16 33.52 Millwright..................$ 55.66 35.11

CARP0152-001 07/01/2020

Contra Costa County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0180-001 07/01/2021

Solano County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0217-001 07/01/2023

San Mateo County

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11

CARP0405-001 07/01/2021

Santa Clara County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0405-002 07/01/2021

San Benito County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0505-001 07/01/2021

Santa Cruz County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0605-001 07/01/2021

Monterey County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0713-001 07/01/2021

Alameda County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0751-001 07/01/2021

Napa and Sonoma Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

ELEC0006-003 11/01/2023

SAN FRANCISCO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 51.68 3%+24.65 Technician..................$ 59.43 3%+24.65

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

ELEC0006-005 06/01/2023

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 52.95 3%+20.33

Work on residential wood frame remodel and repair in all wood-constructed buildings not to exceed 24 living units;

and new wood frame single structure 1 or 2 family houses, or on all wood- constructed buildings not to exceed 20 living units under 1 roof excluding projects or tracts containing more than 2 houses, or more than 1 building

ELEC0006-009 06/01/2023

SAN FRANCISCO COUNTY:

Rates Fringes

ELECTRICIAN

All other work..............$ 88.25 3%+42.315

ELEC0180-002 12/01/2023

NAPA & SOLANO COUNTIES

Rates Fringes

ELECTRICIAN......................$ 38.50 21.16

* ELEC0234-002 12/25/2023

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES:

Rates Fringes

ELECTRICIAN

Zone A......................$ 65.16 29.55 Zone B......................$ 71.68 29.75

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-004 12/01/2021

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Sound & Communications Installer...................$ 47.93 24.09 Technician..................$ 55.12 24.30

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

ELEC0302-002 02/27/2023

CONTRA COSTA COUNTY

Rates Fringes

CABLE SPLICER....................$ 68.92 32.67

ELECTRICIAN......................$ 61.26 32.44

ELEC0302-004 12/01/2023

CONTRA COSTA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 48.44 27.60 Technician..................$ 55.71 27.82

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

ELEC0332-002 06/01/2023

SANTA CLARA COUNTY

Rates Fringes

ELECTRICIAN......................$ 45.25 19.428

ELEC0332-004 12/01/2023

SANTA CLARA COUNTY

Sound & Communications Installer...................$ 53.18 27.745 Technician..................$ 61.16 27.985

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

ELEC0340-001 02/01/2016

EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES

Rates Fringes

ELECTRICIAN

Four stories................$ 39.06 24.51 Work on single family homes and apartments up to and including 3 stories.....$ 23.10 12.48

ELEC0340-004 02/01/2018

COLUSA, PLACER, SUTTER, YOLO AND YUBA COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 29.35 3%+15.35 Technician..................$ 33.75 3%+15.35

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

ELEC0401-006 01/01/2021

EL DORADO AND PLACER COUNTIES

ELECTRICIAN......................$ 31.88 3%+7.50

ZONE PAY:

Zone 1 - 0 to 70 miles $0.00 Per Hour Zone 2 - 70 to 90 miles $5.00 Per Hour Zone 3 - 91 miles and over $7.00 Per Hour

ELEC0551-003 12/01/2023

MARIN AND SONOMA COUNTIES:

Rates Fringes

ELECTRICIAN......................$ 38.50 21.16

ELEC0595-004 06/01/2023

ALAMEDA COUNTY

Rates Fringes

CABLE SPLICER....................$ 80.73 3%+42.87

ELECTRICIAN......................$ 70.20 3%+42.87

ELEC0595-007 11/01/2023

ALAMEDA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 51.18 3%+24.15 Technician..................$ 58.86 3%+24.15

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.

ELEC0617-002 06/01/2023

SAN MATEO COUNTY

Rates Fringes

ELECTRICIAN......................$ 78.00 45.88

ELEV0008-001 01/01/2024

ELEVATOR MECHANIC................$ 80.76 37.885+a+b

FOOTNOTE:

a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0003-009 06/29/2020

EL DORADO, MONTEREY, NAPA, PLACER, SACRAMENTO, SAN BENITO,

SANTA CRUZ, SONOMA, SUTTER, YOLO AND YUBA COUNTIES

""AREA 1"" WAGE RATES ARE LISTED BELOW

""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1

RATES.

SEE AREA DESCRIPTIONS BELOW

Rates Fringes

OPERATOR: Power Equipment

(AREA 1:)

GROUP 1.....................$ 51.42 31.15

GROUP 2.....................$ 49.89 31.15

GROUP 3.....................$ 48.41 31.15

GROUP 4.....................$ 47.03 31.15

GROUP 5.....................$ 45.76 31.15

GROUP 6.....................$ 44.44 31.15

GROUP 7.....................$ 43.30 31.15

GROUP 8.....................$ 42.16 31.15

GROUP 8-A...................$ 39.95 31.15

OPERATOR: Power Equipment (Cranes and Attachments -

AREA 1:)

GROUP 1

Cranes.....................$ 52.30 31.15 Oiler......................$ 43.79 31.15 Truck crane oiler..........$ 46.08 31.15

GROUP 2

Cranes.....................$ 50.54 31.15 Oiler......................$ 42.83 31.15 Truck crane oiler..........$ 45.07 31.15

GROUP 3

Cranes.....................$ 48.80 31.15 Hydraulic..................$ 44.44 31.15 Oiler......................$ 42.55 31.15 Truck crane oiler..........$ 44.83 31.15

GROUP 4

Cranes.....................$ 45.76 31.15

FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Operator of helicopter (when used in erection work);

Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7

cu. yds.

GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds.

up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu.

yd. up to and including 7 cu. yds. m.r.c.

GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd;

Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4

cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over;

Wheel excavator (up to and including 750 cu. yds. per hour)

GROUP 4: Asphalt plant engineer/box person; Chicago boom;

Combination backhoe and loader up to and including 3/4 cu. yd.;

Concrete batch plant (wet or dry); Dozer and/or push cat; Pull-type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine;

Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar);

Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;

Tractor-drawn scraper; Tractor, compressor drill combination;

Welder; Woods-Mixer (and other similar Pugmill equipment)

GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site;

Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist;

Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist;

Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;

Trenching machine, maximum digging capacity over 5 ft. depth;

Vermeer T-600B rock cutter or similar

GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted;

Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer;

Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine

GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar;

Combination slurry mixer and/or cleaner; Drilling equipment, 20

ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer);

Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader

GROUP 8: Bit sharpener; Boiler tender; Box operator;

Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender;

Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar);

Mixermobile; Oiler; Pump operator; Refrigeration plant;

Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater;

Switchperson; Tar pot firetender; Tugger hoist, single drum;

Vacuum cooling plant; Welding machine (powered other than by electricity)

GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper

ALL CRANES AND ATTACHMENTS

GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons

GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane

GROUP 3: Clamshell and dragline up to and including 1 cu. yd.;

Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;

GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over

15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;

AREA DESCRIPTIONS:

POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND

UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]

AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN

BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,

AND YUBA COUNTIES

THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS

NOTED BELOW:

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

MONTEREY COUNTY

Area 1: Remainder Area 2: Southwestern part

PLACER COUNTY:

Area 1: All but the Central portion Area 2: Remainder

PLUMAS COUNTY:

Area 1: Western portion Area 2: Remainder

SHASTA COUNTY:

Area 1: All but the Northeastern corner Area 2: Remainder

SIERRA COUNTY:

Area 1: Western part Area 2: Remainder

SISKIYOU COUNTY:

Area 1: Central part Area 2: Remainder

SONOMA COUNTY:

Area 1: All but the Northwestern corner Area 2: Reaminder

TEHAMA COUNTY:

Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder

TRINITY COUNTY:

Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder

TULARE COUNTY;

Area 1: Remainder Area 2: Eastern part

ENGI0003-010 06/26/2017

ALAMEDA, CONTRA COSTA, MARIN, SAN FRANCISCO, SAN MATEO, SANTA

CLARA AND SOLANO COUNTIES

""AREA 1"" WAGE RATES ARE LISTED BELOW

""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1

RATES.

SEE AREA DESCRIPTIONS BELOW

Rates Fringes

OPERATOR: Power Equipment

(AREA 1:)

GROUP 1.....................$ 43.25 30.39

GROUP 2.....................$ 41.80 30.39

GROUP 3.....................$ 40.40 30.39

GROUP 4.....................$ 39.07 30.39

GROUP 5.....................$ 37.86 30.39

GROUP 6.....................$ 36.59 30.39

GROUP 7.....................$ 35.50 30.39

GROUP 8.....................$ 34.00 30.39

GROUP 8-A...................$ 32.30 30.39

OPERATOR: Power Equipment (Cranes and Attachments -

AREA 1:)

GROUP 1

Cranes.....................$ 44.85 28.03 Oiler......................$ 35.59 28.03 Truck crane oiler..........$ 38.05 28.03

GROUP 2

Cranes.....................$ 42.41 28.03 Oiler......................$ 35.34 28.03 Truck crane oiler..........$ 37.83 28.03

GROUP 3

Cranes.....................$ 40.77 28.03 Hydraulic..................$ 37.20 28.03 Oiler......................$ 35.11 28.03 Truck crane oiler..........$ 37.58 28.03

GROUP 4

Cranes.....................$ 37.86 28.03

FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Operator of helicopter (when used in erection work);

Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7

cu. yds.

GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds.

up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu.

yd. up to and including 7 cu. yds. m.r.c.

GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd;

Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4

cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over;

Wheel excavator (up to and including 750 cu. yds. per hour)

GROUP 4: Asphalt plant engineer/box person; Chicago boom;

Combination backhoe and loader up to and including 3/4 cu. yd.;

Concrete batch plant (wet or dry); Dozer and/or push cat; Pull-type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine;

Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar);

Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;

Tractor-drawn scraper; Tractor, compressor drill combination;

Welder; Woods-Mixer (and other similar Pugmill equipment)

GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site;

Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist;

Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist;

Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller;

Trenching machine, maximum digging capacity over 5 ft. depth;

Vermeer T-600B rock cutter or similar

GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom-type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted;

Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer;

Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine

GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar;

Combination slurry mixer and/or cleaner; Drilling equipment, 20

ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer);

Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader

GROUP 8: Bit sharpener; Boiler tender; Box operator;

Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender;

Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar);

Mixermobile; Oiler; Pump operator; Refrigeration plant;

Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater;

Switchperson; Tar pot firetender; Tugger hoist, single drum;

Vacuum cooling plant; Welding machine (powered other than by electricity)

GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper

ALL CRANES AND ATTACHMENTS

GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons

GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane

GROUP 3: Clamshell and dragline up to and including 1 cu. yd.;

Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;

GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons;

Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;

AREA DESCRIPTIONS:

POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND

UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]

AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN

BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO,

AND YUBA COUNTIES

THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS

NOTED BELOW:

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

MONTEREY COUNTY

Area 1: Remainder Area 2: Southwestern part

PLACER COUNTY:

Area 1: All but the Central portion Area 2: Remainder

ENGI0003-011 06/29/2020

SEE AREA DESCRIPTIONS BELOW

Rates Fringes

OPERATOR: Power Equipment

(LANDSCAPE WORK ONLY)

GROUP 1

AREA 1.....................$ 39.95 30.28

AREA 2.....................$ 41.95 30.28

GROUP 2

AREA 1.....................$ 36.35 30.28

AREA 2.....................$ 38.35 30.28

GROUP 3

AREA 1.....................$ 31.74 30.28

AREA 2.....................$ 33.74 30.28

GROUP DESCRIPTIONS:

GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.

GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.

GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP.

AREA DESCRIPTIONS:

AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SACRAMENTO, SAN

BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO,

YOLO, AND YUBA COUNTIES

THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS

NOTED BELOW:

ELDORADO COUNTY:

Area 1: North Central part Area 2: Remainder

MONTEREY COUNTY

Area 1: Remainder Area 2: Southwestern part

PLACER COUNTY:

Area 1: All but the Central portion Area 2: Remainder

IRON0377-001 01/01/2024

ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES

Rates Fringes

Ironworkers:

Fence Erector...............$ 42.53 26.26 Ornamental, Reinforcing and Structural..............$ 52.08 34.90

PREMIUM PAY:

$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB

$4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center

$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock

IRON0377-003 01/01/2024

SAN FRANCISCO CITY and COUNTY

Rates Fringes

Ironworkers:

Fence Erector...............$ 42.53 26.26 Ornamental, Reinforcing and Structural..............$ 52.58 34.90

PREMIUM PAY:

$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB

$4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center

$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock

IRON0433-005 01/01/2024

REMAINING COUNTIES

Rates Fringes

IRONWORKER

Fence Erector...............$ 42.53 26.26 Ornamental, Reinforcing and Structural..............$ 47.45 34.90

PREMIUM PAY:

$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB

$4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center

$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock

LABO0067-007 06/26/2023

AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO,SAN

MATEO, SANTA CLARA

AREA 2: EL DORADO, MONTEREY, PLACE, SACRAMENTO, SAN BENITO,

SANTA CRUZ, SOLANO, SONOMA, SUTTER, YOLO, AND YUBA COUNTIES:

LABORER (ASBESTOS/MOLD/LEAD

LABORER)

AREA 1......................$ 36.50 28.34

AREA 2......................$ 35.50 28.34

SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped;

encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.

LABO0185-001 06/26/2023

EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES

Rates Fringes

Laborers: (CONSTRUCTION CRAFT

LABORERS)

Construction Specialist.....$ 36.20 27.30

GROUP 1.....................$ 35.50 27.30

GROUP 1-a...................$ 35.72 27.30 GROUP 1-c...................$ 35.55 27.30 GROUP 1-e...................$ 36.05 27.30 GROUP 1-f...................$ 30.37 23.20

GROUP 2.....................$ 35.35 27.30

GROUP 3.....................$ 35.25 27.30

GROUP 4.....................$ 28.94 27.30

Laborers: (GUNITE)

GROUP 1.....................$ 36.46 27.30

GROUP 2.....................$ 35.96 27.30

GROUP 3.....................$ 35.37 27.30

GROUP 4.....................$ 35.25 27.30

Laborers: (WRECKING)

GROUP 1.....................$ 35.50 27.30

GROUP 2.....................$ 35.35 27.30

Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE

LABORERS)

Establishment Warranty Period......................$ 28.94 27.30 New Construction............$ 35.25 27.30

FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts (not applicable to workers entitled to receive the wage rate set forth in Group 1-a):

$0.25 per hour additional.

LABORER CLASSIFICATIONS

CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;

Chainsaw; Laser beam in connection with laborers' work;

Cast-in- place manhole form setter; Pressure pipelayer;

Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill;

Hydraulic drill

GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;

Compactors of all types; Concrete and magnesite mixer, 1/2

yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;

Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches;

Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder;

Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter;

Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun;

Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;

Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;

Vibrascreed, bull float in connection with laborers' work;

Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker

GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller;

Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder;

All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder

GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes, shall receive $5.00 per day above Group 1 wage rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding

GROUP 1-d: Maintenance and repair track and road beds (underground structures). All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete

GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work);

Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew;

High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches

GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher;

Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)

GROUP 4: All clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material. B:

at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".

GUNITE LABORER CLASSIFICATION

GROUP 1: Structural nozzleman

GROUP 2: Nozzleman, Gunman, Potman, Groundman

GROUP 3: Reboundman

GROUP 4: Gunite laborer

WRECKING WORK LABORER CLASSIFICATIONS

GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)

GROUP 2: Semi-skilled wrecker (salvaging of other building materials)

LABO0185-003 07/01/2023

EL DORADO, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES

Rates Fringes

LABORER

Mason Tender-Brick..........$ 36.29 25.55

LABO0185-007 07/01/2023

EL DORADO, MARIN, NAPA, PLACER, SACRAMENTO, SOLANO, SONOMA,

SUTTER, YOLO AND YUBA COUNTIES

Rates Fringes

Plasterer tender.................$ 39.77 28.54

Work on a swing stage scaffold: $1.00 per hour additional.

LABO0261-001 06/26/2023

MARIN, SAN FRANCISCO, AND SAN MATEO COUNTIES

Rates Fringes

Laborers: (CONSTRUCTION CRAFT

LABORERS)

Construction Specialist.....$ 37.20 27.30

GROUP 1.....................$ 36.50 27.30

GROUP 1-a...................$ 36.72 27.30 GROUP 1-c...................$ 36.55 27.30 GROUP 1-e...................$ 37.05 27.30 GROUP 1-f...................$ 31.37 23.20

GROUP 2.....................$ 36.35 27.30

GROUP 3.....................$ 36.25 27.30

GROUP 4.....................$ 29.94 27.30

See groups 1-b and 1-d under laborer classifications.

Laborers: (GUNITE)

GROUP 1.....................$ 37.46 27.30

GROUP 2.....................$ 36.96 27.30

GROUP 3.....................$ 36.37 27.30

GROUP 4.....................$ 36.25 27.30

Laborers: (WRECKING)

GROUP 1.....................$ 36.50 27.30

GROUP 2.....................$ 36.35 27.30

Landscape Laborer (GARDENERS, HORTICULTURAL & LANDSCAPE

LABORERS)

Establishment Warranty Period......................$ 29.94 27.30…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .