Site Walk Attendees List - Elevator.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Design/Build Repair by Replacement Elevator Bldg. 395 Air Traffic Control Tower Federal contract opportunity
- Solicitation number
- FA466422R0001
About this file
This document contains a site walk attendees list and related federal contract opportunity solicitation. The site walk attendees list documents companies that attended a pre-proposal site visit for a design/build project to remove and replace an elevator in an Air Traffic Control Tower at March Air Reserve Base in California. The related solicitation seeks proposals for this design/build project to disassemble and remove the existing elevator and control system, furnish and install a new elevator and associated components, test and commission the new system, and provide training. The solicitation was issued by the 452d Mission Support Group Civil Engineers on behalf of the Department of the Air Force Reserve Command. Proposals are due by the date specified in the solicitation. The project will be awarded on a best value basis to a responsible contractor as outlined in the solicitation.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SITE WALK ATTENDEES |
| Repair by Replacement Elevator Bldg. 395 Air Traffic Control Tower |
| 10 May 2022 - 0900 |
| Company | Representative | Checked In |
| Chugach Elevator | Joshua Lomax | X |
| Atwood Hay Inc. Construction | Glenda Hay | X |
| SH Mechanical, Inc | Seth Hacker | X |
| Imer Mejia | X | |
| Specialized Elevator Services | Garret Irelan | X |
| Zenith Construction | Bishara Ari Amer | X |
| Don Sterling | X | |
| Otis Elevator | Valerie Huerta | X |
| Victor Camarena | X | |
| M&K General Contractors Inc. | Malachi Frese | X |
| JCJ Chavez Construction | Jason Chavez | X |
| Michael Hake | X | |
| DLJ Construction Group | Daniel James | X |
| BTS (JCJ Chavez Sub) | Alfonso Cabada | X |
| Garces Steel (JCJ Chavez Sub) | Thomas Garces | X |
| Sierra Pacific Fence, Inc. | Mehrdad Arabi | X |
| Guardian Construction | David Bailey | X |
| SmartRise Elevator Service | Kirk Rooney | X |
| March ARB Representatives | ||
| 452d Operational Contracting Office | AnhTuan Dang, Contracting Officer | X |
| Amy Crain, Contract Specialist | X | |
| 452d Civil Engineering Squadron | Soon No, Chief of Design | X |
| Luis Rodriguez-Pagan, Project Engineer | X | |
| William Kelly, Contracts Mgt Chief | X | |
| Anthony Villafranca, CE Inspector | X | |
| 452d Wing Safety | MSgt. Mark Gomez | X |
| . |
File details come from the government source that posted it. Updated .