This document outlines the material submittal requirements for a design-build project to replace an elevator in an Air Traffic Control Tower at March Air Reserve Base in California. The contractor must submit 22 items such as an environmental protection plan, elevator components data, wiring diagrams, reaction load calculations, warranty documentation, and a commissioning report. Submittals are due to the contracting office and Civil Engineering for review according to the schedule, with the first items due by June 15, 2022. The 452nd Mission Support Group Civil Engineers at March Air Reserve Base is the contracting agency. The project entails removing the existing elevator, control system, and electrical components and installing a new elevator that will be tested, commissioned, and trained on according to the statement of work.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| PDPG 21-1000 | Project Title: | ||
| Repair by Replacement Elevator, Bldg. 395 | Solicitation / Contract Number: |
Attachment 16 to FA466422R0001 (Amendment 0001, May 27, 2022)
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||
| Number of Copies Required | Remarks | ||||||
| Item or Description of Item, Contract Reference, Type of Submittal | EPP | Shop Drawings | |||||
| Product Data | |||||||
| . | Design Data | Certificates | Operation and Maintenance Data | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter the due date from the Contractor (MM/DD/YY) fergusog: Enter the date received from the Contractor. (MM/DD/YY) fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
| 1 | Environmental Protection Plan | 1 | Electronic Copy | ||||||
| 2 | Elevator Components | 1 | Electronic Copy | ||||||
| 3 | Elevator Machine | 1 | Electronic Copy | ||||||
| 4 | Elevator Controller | 1 | Electronic Copy | ||||||
| 5 | Wiring Diagrams | 1 | Electronic Copy | ||||||
| 6 | Elevator and Accessories | 1 | Electronic Copy | ||||||
| 7 | Elevator Components | 1 | Electronic Copy | ||||||
| 8 | Data Sheets | 1 | Electronic Copy | ||||||
| 9 | Elevator Microprocessor Controller | 1 | Electronic Copy | ||||||
| 10 | Emergency Power System | 1 | Electronic Copy | ||||||
| 11 | Heat Loads | 1 | Electronic Copy | ||||||
| 12 | Reaction Loads | 1 | Electronic Copy | ||||||
| 13 | Elevator Parts and Components Price Lists | 1 | Electronic Copy | ||||||
| 14 | Warranty, Endorsement Letter | 1 | Electronic Copy | ||||||
| 15 | Welders Qualifications | 1 | Electronic Copy | ||||||
| 16 | Elevator Controller Certification | 1 | Electronic Copy | ||||||
| 17 | Acceptance Test and Written Certification from QEI | 1 | Electronic Copy | ||||||
| 18 | Elevator Data Package | 1 | Electronic Copy | ||||||
| 19 | Maintenance Control Program | 1 | Electronic Copy | ||||||
| 20 | Software and Documentation | 1 | Electronic Copy | ||||||
| 21 | Commissioning Report | 1 | Electronic Copy | ||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N
File details come from the government source that posted it. Updated .