This federal contract opportunity solicitation seeks design/build repair by replacement of an elevator in Building 395 at March Air Reserve Base, California. The 452 Mission Support Group Civil Engineers requires a contractor to remove and replace the existing elevator, control system, electrical system, and all associated components in the Air Traffic Control Tower building. The project includes modifications to existing electrical systems and control system, furnishing and assembling a new elevator, and testing and commissioning the new elevator and associated components. The contractor must also provide training to base staff. The solicitation was issued by the Department of the Air Force Reserve Command.
Other files for this federal contract opportunity
Other files attached to Design/Build Repair by Replacement Elevator Bldg. 395 Air Traffic Control Tower, newest first.
File
Type
Posted
Attachment 22. March ARB Questions (RFIs)-Answers 6-23-2022.pdf
PDF
Jun 23, 2022
Solicitation Amendment FA466422R00010003 SF 30 CO Signed.pdf
PDF
Jun 23, 2022
RFI NOTICE .docx
DOCX document
Jun 16, 2022
Solicitation Amendment FA466422R00010002 SF 30.pdf
PDF
Jun 13, 2022
Attachment 24 - Layout Area_RFI 67.pdf
PDF
Jun 13, 2022
Attachment 22. March ARB Questions (RFIs)-Answers 6-13-2022.pdf
PDF
Jun 13, 2022
Attachment 2. Revised SOW dated 20 May 2022.pdf
PDF
May 27, 2022
Attachment 22. March ARB Questions (RFIs)-Answers.pdf
PDF
May 27, 2022
Solicitation Amendment FA466422R00010001 SF 30 (1).pdf
PDF
May 27, 2022
Attachment 16. Schedule Material Submittals, Amendment 1_.xlsx
XLSX spreadsheet
May 27, 2022
Attachment 23. Appendix to March ARB Questions (RFIs) and Answers.pdf
PDF
May 27, 2022
Solicitation Amendment FA466422R00010001 SF 30 (1).pdf
PDF
May 27, 2022
Site Visit Notes Bldg. 395-Elevator Repair.docx
DOCX document
May 15, 2022
Site Walk Attendees List - Elevator.xlsx
XLSX spreadsheet
May 13, 2022
Site Visit Notes Bldg. 395-Elevator Repair.docx
DOCX document
May 13, 2022
Solicitation - FA466422R0001.pdf
PDF
May 10, 2022
Attachment 6. Section 01 10 01 General Conditions.pdf
PDF
May 10, 2022
Attachment 7. Section 01 11 00 Summary of Work.pdf
PDF
May 10, 2022
Attachment 14. Section 14 21 23 Electric Traction PassElevators.pdf
PDF
May 10, 2022
Attachment 1. General Wage Decision 4-29-2022.pdf
PDF
May 10, 2022
Attachment 2. SOW PDPG 21-1000_Repair by Replacement Elevator_ Bldg.395 (002).pdf
PDF
May 10, 2022
Attachment 4. Video_1.mov
MOV file
May 10, 2022
Attachment 8. Section 01 30 00 Administrative Requirements.pdf
PDF
May 10, 2022
Attachment 11. Section 01 78 00 Closeout Submittals.pdf
PDF
May 10, 2022
Attachment 12. Section 01 57 19 - MARB EPSG - May-2020.pdf
PDF
May 10, 2022
Attachment 16. Elevator Repair Submittal Register.xlsx
XLSX spreadsheet
May 10, 2022
Attachment 5. Video_2.mov
MOV file
May 10, 2022
Attachment 10. Section 01 35 26 Gov Safety Requirements.pdf
PDF
May 10, 2022
Attachment 15. Construction_Cost_Estimate_Breakdown.xlsx
XLSX spreadsheet
May 10, 2022
Attachment 18. KTR Security Requirements.2022_V1_3.pdf
PDF
May 10, 2022
Attachment 19. MARB Base Pass Request_2022_ v2.1 CUI_3.pdf
PDF
May 10, 2022
Attachment 3. Note for Photos, Maps & Drawings.docx
DOCX document
May 10, 2022
Attachment 9. Section 01 33 00 Submittal Procedures.pdf
PDF
May 10, 2022
Attachment 13. EPP Template.docx
DOCX document
May 10, 2022
Attachment 17. MARB FEP June 2016.pdf
PDF
May 10, 2022
Attachment 20. List - Secondary forms of ID.pdf
PDF
May 10, 2022
Attachment 21. OF 17 Offer Label.pdf
PDF
May 10, 2022
Show all 37
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated May 27, 2022 .