This document provides details for a federal contract solicitation to design and build a replacement elevator at March Air Reserve Base in California. The 452nd Mission Support Group Civil Engineers is seeking to contract for a design-build project to remove the existing elevator in the Air Traffic Control Tower building and replace it with a new elevator. The project requires disassembling and removing the old elevator system and components and installing a new elevator, along with testing, commissioning, and training base staff on the new system. The solicitation number is FA466422R0001 and is being conducted by the Department of the Air Force Reserve Command. Contractors will need to provide design, construction, equipment, installation, testing, and training services to complete the elevator replacement as outlined in the statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to Design/Build Repair by Replacement Elevator Bldg. 395 Air Traffic Control Tower, newest first.
File Type Posted
Attachment 22. March ARB Questions (RFIs)-Answers 6-23-2022.pdf PDF
Solicitation Amendment FA466422R00010003 SF 30 CO Signed.pdf PDF
RFI NOTICE .docx DOCX document
Attachment 22. March ARB Questions (RFIs)-Answers 6-13-2022.pdf PDF
Solicitation Amendment FA466422R00010002 SF 30.pdf PDF
Attachment 24 - Layout Area_RFI 67.pdf PDF
Attachment 2. Revised SOW dated 20 May 2022.pdf PDF
Attachment 22. March ARB Questions (RFIs)-Answers.pdf PDF
Solicitation Amendment FA466422R00010001 SF 30 (1).pdf PDF
Attachment 16. Schedule Material Submittals, Amendment 1_.xlsx XLSX spreadsheet
Attachment 23. Appendix to March ARB Questions (RFIs) and Answers.pdf PDF
Solicitation Amendment FA466422R00010001 SF 30 (1).pdf PDF
FA466422R0001 Elevator Repair Amendment 1.zip ZIP file
Site Visit Notes Bldg. 395-Elevator Repair.docx DOCX document
Site Walk Attendees List - Elevator.xlsx XLSX spreadsheet
Site Visit Notes Bldg. 395-Elevator Repair.docx DOCX document
Solicitation - FA466422R0001.pdf PDF
Attachment 6. Section 01 10 01 General Conditions.pdf PDF
Attachment 7. Section 01 11 00 Summary of Work.pdf PDF
Attachment 14. Section 14 21 23 Electric Traction PassElevators.pdf PDF
Attachment 1. General Wage Decision 4-29-2022.pdf PDF
Attachment 2. SOW PDPG 21-1000_Repair by Replacement Elevator_ Bldg.395 (002).pdf PDF
Attachment 4. Video_1.mov MOV file
Attachment 8. Section 01 30 00 Administrative Requirements.pdf PDF
Attachment 11. Section 01 78 00 Closeout Submittals.pdf PDF
Attachment 12. Section 01 57 19 - MARB EPSG - May-2020.pdf PDF
Attachment 16. Elevator Repair Submittal Register.xlsx XLSX spreadsheet
Attachment 3. Note for Photos, Maps & Drawings.docx DOCX document
Attachment 9. Section 01 33 00 Submittal Procedures.pdf PDF
Attachment 13. EPP Template.docx DOCX document
Attachment 17. MARB FEP June 2016.pdf PDF
Attachment 20. List - Secondary forms of ID.pdf PDF
Attachment 21. OF 17 Offer Label.pdf PDF
Attachment 5. Video_2.mov MOV file
Attachment 10. Section 01 35 26 Gov Safety Requirements.pdf PDF
Attachment 18. KTR Security Requirements.2022_V1_3.pdf PDF
Attachment 19. MARB Base Pass Request_2022_ v2.1 CUI_3.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Attachment 15 to FA466422R0001
Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERAttachment 15 to FA466422R0001
LOCATIONPROJECT NO.Fill Here
MARCH AIR RESERVE BASE, CA
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTSERROR:#DIV/0!50.00
DIVISION 02EXISTING CONDITIONSERROR:#DIV/0!50.00
DIVISION 03CONCRETE WORKERROR:#DIV/0!63.25FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

DIVISION 04MASONRYERROR:#DIV/0!- 0
DIVISION 05METALSERROR:#DIV/0!- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITESERROR:#DIV/0!- 0GC Overhead
DIVISION 07THERMAL AND MOISTURE PROTECTIONERROR:#DIV/0!- 0GC Profit
DIVISION 08OPENINGSERROR:#DIV/0!- 0Sub Overhead
DIVISION 09FINISHESERROR:#DIV/0!- 0Sub Profit
DIVISION 10SPECIALTIESERROR:#DIV/0!- 0Sales Tax
DIVISION 11EQUIPMENTERROR:#DIV/0!- 0Risk/Bonding
DIVISION 12FURNISHINGSERROR:#DIV/0!- 0
DIVISION 13SPECIAL CONSTRUCTIONERROR:#DIV/0!- 0This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 15RESERVEDERROR:#DIV/0!- 0
DIVISION 16RESERVEDERROR:#DIV/0!- 0
DIVISION 20RESERVEDERROR:#DIV/0!- 0
DIVISION 21FIRE SUPRESSIONERROR:#DIV/0!- 0
DIVISION 22PLUMBINGERROR:#DIV/0!- 0
DIVISION 23HEATING, VENTILATING AND A/CERROR:#DIV/0!- 0
DIVISION 24RESERVEDERROR:#DIV/0!- 0
DIVISION 25INTEGRATED AUTOMATIONERROR:#DIV/0!- 0
DIVISION 26ELECTRICALERROR:#DIV/0!- 0
DIVISION 27COMMUNICATIONSERROR:#DIV/0!- 0
DIVISION 28ELECTRONIC SAFETY AND SECURITYERROR:#DIV/0!- 0
DIVISION 29RESERVEDERROR:#DIV/0!- 0
DIVISION 30RESERVEDERROR:#DIV/0!- 0
DIVISION 31EARTHWORKERROR:#DIV/0!- 0
DIVISION 32EXTERIOR IMPROVEMENTSERROR:#DIV/0!- 0
DIVISION 33UTILITIESERROR:#DIV/0!- 0
DIVISION 34TRANSPORTATIONERROR:#DIV/0!- 0
DIVISION 35WATERWAYS AND MARINE CONSTRUCTIONERROR:#DIV/0!- 0
DIVISION 36RESERVEDERROR:#DIV/0!- 0
DIVISION 37RESERVEDERROR:#DIV/0!- 0
DIVISION 38RESERVEDERROR:#DIV/0!- 0
DIVISION 39RESERVEDERROR:#DIV/0!- 0
DIVISION 40PROCESS INTEGRATIONERROR:#DIV/0!- 0
DIVISION 41MATERIAL PROCESING AND HANDLING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 42PROCESS HEATING, COOLING AND DRYING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 43PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENTERROR:#DIV/0!- 0
DIVISION 44POLLUTION CONTROL EQUIPMENTERROR:#DIV/0!- 0
DIVISION 45INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENTERROR:#DIV/0!- 0
DIVISION 46RESERVEDERROR:#DIV/0!- 0
DIVISION 47RESERVEDERROR:#DIV/0!- 0
DIVISION 48ELECTRICAL POWER GENERATIONERROR:#DIV/0!- 0
DIVISION 49RESERVEDERROR:#DIV/0!- 0

HARD COST TOTAL ERROR:#DIV/0!

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)0%- 0
SUBTOTAL- 0
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)0%- 0
SUBTOTAL- 0
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)0%- 0
CONTRACT TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input31.0010.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ 50.00

&"Verdana,Bold"Construction Cost Estimate

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ 50.00

&"Verdana,Bold"Construction Cost Estimate

Div3

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead10.00%5.00
Sub-Contractor's Profit15.00%8.25
FL State Sales Tax0.00%- 0
TOTAL$ 63.25

&"Verdana,Bold"Construction Cost Estimate

Div4

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div5

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div6

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div8

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div10

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div11

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div12

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div13

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div14

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div15

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div16

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div20

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div21

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Sheet2

Div22

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div23

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div24

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
MARCH AIR RESERVE BASE, CACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div25

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div26

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div27

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div28

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div29

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div30

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div31

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div33

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div34

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div35

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
RESERVED$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div36

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div37

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div38

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div39

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div40

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS INTEGRATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div41

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MATERIAL PROCESING AND HANDLING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div42

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
PDPG 21-1000 REPAIR BY REPLACEMENT ELEVATOR, BLDG. 395, AIR TRAFFIC CONTROL TOWERCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS HEATING, COOLING AND DRYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0