March_ARB_-_Tab_G_QAs.pdf

PDF 36 KB Posted

Attached to
Base Operations and Support Services (BOS) at March ARB, CA Federal contract opportunity
Solicitation number
FA4664-18-R-0001
Issued by
Department of the Air Force Reserve Command

About this file

March ARB-Tab G QAs

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations and Support Services (BOS) at March ARB, CA, newest first.
File Type Posted
Attach_08_Pricing_Labor_Categories_(dm)_as_of_30_Apr.xlsx XLSX spreadsheet
FA4664-18-R-0001-0002.docx DOCX document
FA4664-18-R-0001-0001.docx DOCX document
Attach_08_Pricing_Labor_Categories_(dm)_as_of_27_Apr.xlsx XLSX spreadsheet
March_PWS_Tab_F_Revision_1,_19_Apr_2018.docx DOCX document
Attach_08_Pricing_Labor_Categories_(dm)_as_of_24_Apr.xlsx XLSX spreadsheet
March_PWS_Tab_D_Revision_1,_19_Apr_2018.docx DOCX document
March_PWS_Tab_B_Revision_1,_19_Apr_2018.docx DOCX document
March_PWS_Tab_C_Revision_1,_19_Apr_2018.docx DOCX document
March_PWS_TAB_A_Revision_1,_19_Apr_2018.docx DOCX document
March_PWS_Tab_H_Revision_1,_19_Apr_2018.docx DOCX document
March_PWS_Tab_G_Revision_1,_19_Apr_2018.docx DOCX document
Attach_08_Pricing_Labor_Categories_(dm)_corrected_19_Apr_18.xlsx XLSX spreadsheet
G-6_March_Natural_Gas.pdf PDF
March_ARB_-_Tab_F_QAs.pdf PDF
March_ARB_-_Other_QAs.pdf PDF
G-3A_Storm_Drain_1_of_2.pdf PDF
March_ARB_-_Tab_B_QAs.pdf PDF
March_ARB_-_Tab_H_QAs.pdf PDF
E-10_March_Airfield_Lighting.pdf PDF
March_ARB_-_Tab_A_QAs.pdf PDF
March_ARB_-_Tab_C_QAs.pdf PDF
March_ARB_-_Tab_D_QAs.pdf PDF
C-1_Installation_Layout_Imagery.pdf PDF
AF-PMTLs_Final_Version_2016.xlsx XLSX spreadsheet
G-8_March_Liquid_Fuels.pdf PDF
G-3B_Storm_Drain_2_of_2.pdf PDF
March_BOS_Pre-Proposal_Conference_and_Site_Visit_28_Feb_18_FINAL.pptx PPTX presentation
Attachment_1f_March_PWS_Tab_F_8_Mar_2018.docx DOCX document
Attachment_3_SCA_WD_2015-5629,_Rev_5,_25_Jul_17.txt TXT text file
Site_Visit_Sign-in.pdf PDF
Attachment_9_Property_Incidental_to_Place_of_Performance_1_Dec_2017.xlsx XLSX spreadsheet
Attachment_1g_MARCH_PWS_Tab_G_8_Mar_2018.docx DOCX document
Attachment_1d_March_PWS_Tab_D_8_Mar_2018.docx DOCX document
Attachment_1a_March_PWS_TAB_A_8_Mar_2018.docx DOCX document
Attachment_2_DDForm254_-_March_BOS_Contract.pdf PDF
Attachment_1c_March_PWS_Tab_C_8_Mar_2018.docx DOCX document
Attachment_4_DBA_WD_CA180036,_MOD_3,_9_Feb_18.txt TXT text file
Attachment_7_Statement_of_Equivalent_Rates.xls XLS spreadsheet
Attachment_5,_CBA_WD_2017-10007,_Rev_1,_with_cover.pdf PDF
FA4664-18-R-0001_23_Mar_18.pdf PDF
Attachment_1h_March_PWS_Tab_H_8_Mar_2018.docx DOCX document
Attachment_8_Pricing_Labor_Categories_(dm).xlsx XLSX spreadsheet
March_PWS_Tab_C_1_Dec_2017.docx DOCX document
March_PWS_Tab_D_1_Dec_2017.docx DOCX document
MARCH_PWS_Tab_G_1_Dec_2017.docx DOCX document
March_PWS_Tab_H_1_Dec_2017.docx DOCX document
March_PWS_Tab_B_1_Dec_2017.docx DOCX document
March_PWS_TAB_A_1_Dec_2017.docx DOCX document
March_PWS_Tab_F_1_Dec_2017.docx DOCX document
Show all 50

Base Operations and Support Services (BOS) at March ARB, CA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB G

1. Reference PWS Paragraph G2.1.2. The end of this paragraph reads “(See G-TE-12) (Modification P00049)”. Neither of these two items exist in the PWS however they do look like they reference something in the current contract. Please clarify.

Answer: Modification P00049 will be removed from PWS.

2. Reference PWS Paragraph G3. The core hours show 24 hours a day, 7 days a week. With Airfield Management closed on Thanksgiving Day, Christmas Day and New Years Day, is fuels in fact to remain open?

Answer: Fuels operation is 24 hours a day, 7 days a week. If transient aircraft are scheduled to arrive on holidays, then fuels will be required to be provide mission support.

3. Reference PWS Paragraph G-TE-2, Line 1. Please provide the pipeline flow rate and Hydrant Transfer rate.

Answer: Bulk Storage receipt separator is a 1,200 GPM filter separator. Pipeline transfer flow rate between bulk storage and hydrant systems includes two (2) 600 GPM transfer pumps.

Hydrant issue rate capacity includes eleven (11) 600 GPM issue pumps across the two hydrant systems.

4. Reference PWS Paragraph G-TE-2, Line 1. Is the section of the receipt pipeline within the installation above or below ground?

Answer: Receipt pipeline is below ground.

5. Reference PWS Paragraph G-TE-2, Lines 6 and 16. Are the 1174 annual issues to Transient Aircraft (line 16) included in the 2496 annual issues shown in line 6?

Answer: Yes line 16 (transient aircraft) issues are included in line 6 (issues). Transient aircraft from G-TE-2 is an annual average versus the monthly average from line 6.

6. Please provide workload breakout from G-TE-2 for After normal hours 1600-2400 and 2400-0800. Offerors other than the incumbent do not have an idea what the workload to be supported is for those hours. How many aircraft servicings are there etc.? Is there a minimum staffing number for after normal hours support for Tab G?

Answer: Fuels hour of operation are 24/7. There is no “after normal hours”. It is up to the contractor to staff according to workload and regulations.

File details come from the government source that posted it.