_7 _Sample_Project_Bid_Schedule.docx

DOCX document 26 KB Posted

Attached to
Dyess AFB MACC Federal contract opportunity
Solicitation number
FA4661-15-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 7 - Sample Project Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Dyess AFB MACC, newest first.
File Type Posted
Amendment_3.pdf PDF
Attachment__8 _Fan_Coil_Unit_Spec_for_Sample.pdf PDF
FA4661-15-R-0002-0002.pdf PDF
1-Prototypical_3_Story_Dorm_(Bldgs_7232_ _7233)_-_Initial_Construction_-_1954.pdf PDF
3-Bldg_7233_-_Available_As-Built_Drawings_after_Initial_Construction.pdf PDF
4-Bldg_7223_-_Available_As-Built_Drawings.pdf PDF
2-Bldg_7232_-_Available_As-Built_Drawings_after_Initial_Construction.pdf PDF
Response_to_Questions_29_June_15.pdf PDF
Slides.pdf PDF
Q A_Post_18_June_15.pdf PDF
FA466116R0002_Amendment_1.pdf PDF
SignIn_Sheet.pdf PDF
Site_Visit_Minutes.pdf PDF
_4 _Past_Performance_Questionaire.pdf PDF
_3 _Sample_Project_Drawings.pdf PDF
Dyess_AFB_MACC_FY15_Solicitation.pdf PDF
_5 _Site_Visit_Registration.doc DOC document
_6 _Question_Submission.doc DOC document
_2 _Sample_Project_Specifications.pdf PDF
_1 _General_MACC_Specifications.pdf PDF
_6 _Question_Submission.doc DOC document
_2 _Sample_Project_Specifications.pdf PDF
_4 _Past_Performance_Questionaire.pdf PDF
_1 _General_MACC_Specifications.pdf PDF
_3 _Sample_Project_Drawings.pdf PDF
_5 _Site_Visit_Registration.doc DOC document
Dyess_AFB_MACC_FY15_Solicitation.pdf PDF
Clarification_on_Draft_Documents_6_May_15.pdf PDF
MACC_FY15_Draft_RFP.doc DOC document
_7 _Site_Visit_Registration.doc DOC document
_2 _Seed_Project_1.pdf PDF
_5 _Seed_Project_4.pdf PDF
_8 _Question_Submission.doc DOC document
_1 _General_MACC_Specifications.pdf PDF
_4 _Seed_Project_3.pdf PDF
_6 _Past_Performance_Questionaire.docx DOCX document
_3 _Seed_Project_2.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule of Items: Design Repair for HVAC System, Buildings 7232 & 7233 16 June 2015

0001 Base Bid - Item 1 –Building 7232 This Item includes all survey, layout, plant, labor, supplies, equipment, materials supervision and incidentals required to complete all work in compliance with the specifications, drawings, and terms and conditions of the Contract for FNWZ 99-0013, Design Repair for HVAC System, except those items of work specifically included in Bid Item 2 & 3.

1 LS: $___________________________

0002 Base Bid - Item 2 –Building 7233 This Item includes all survey, layout, plant, labor, supplies, equipment, materials supervision and incidentals required to complete all work in compliance with the specifications, drawings, and terms and conditions of the Contract for FNWZ 99-0013, Design Repair for HVAC System, except those items of work specifically included in Bid Item 1 & 3.

1 LS: $___________________________

0003 Base Bid - Item 3 –Building 7223 (Central Plant) This Item includes all survey, layout, plant, labor, supplies, equipment, materials supervision and incidentals required to complete all work in compliance with the specifications, drawings, and terms and conditions of the Contract for FNWZ 99-0013, Design Repair for HVAC System, except those items of work specifically included in Bid Item 1 & 2.

1 LS: $___________________________

Total Construction Cost, Including all Items above: $___________________________

CONTRACT PERFORMANCE TIME:

1. Total of 385 calendar days to complete the work.

2. Performance time includes 20 working days of anticipated weather. No additional time weather related delays will be granted until these 20 anticipated weather days have been exceeded and approved by the Contracting Officer.

3. Performance time includes mobilization, submittal approval, delivery of materials, actual construction work, perform system testing, training base personnel, and provide as-built drawings, close out documents, and submitted DD Form 1354 at final inspection.

4. Liquidated damages will be assessed IAW FAR 52.211-12 in the amount of $427.81 for the first day and $301.90 for each subsequent day until all work is completed.