_5 _Seed_Project_4.pdf

PDF 37 KB Posted

Attached to
Dyess AFB MACC Federal contract opportunity
Solicitation number
FA4661-15-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Draft Attachment 5 - Seed Project 4 Technical Documents

View the file

Other files for this federal contract opportunity

Other files attached to Dyess AFB MACC, newest first.
File Type Posted
Amendment_3.pdf PDF
Attachment__8 _Fan_Coil_Unit_Spec_for_Sample.pdf PDF
FA4661-15-R-0002-0002.pdf PDF
1-Prototypical_3_Story_Dorm_(Bldgs_7232_ _7233)_-_Initial_Construction_-_1954.pdf PDF
3-Bldg_7233_-_Available_As-Built_Drawings_after_Initial_Construction.pdf PDF
4-Bldg_7223_-_Available_As-Built_Drawings.pdf PDF
2-Bldg_7232_-_Available_As-Built_Drawings_after_Initial_Construction.pdf PDF
Response_to_Questions_29_June_15.pdf PDF
_7 _Sample_Project_Bid_Schedule.docx DOCX document
Slides.pdf PDF
Q A_Post_18_June_15.pdf PDF
FA466116R0002_Amendment_1.pdf PDF
Site_Visit_Minutes.pdf PDF
SignIn_Sheet.pdf PDF
_4 _Past_Performance_Questionaire.pdf PDF
_3 _Sample_Project_Drawings.pdf PDF
Dyess_AFB_MACC_FY15_Solicitation.pdf PDF
_1 _General_MACC_Specifications.pdf PDF
_5 _Site_Visit_Registration.doc DOC document
_6 _Question_Submission.doc DOC document
_2 _Sample_Project_Specifications.pdf PDF
_6 _Question_Submission.doc DOC document
_2 _Sample_Project_Specifications.pdf PDF
_4 _Past_Performance_Questionaire.pdf PDF
_3 _Sample_Project_Drawings.pdf PDF
_5 _Site_Visit_Registration.doc DOC document
Dyess_AFB_MACC_FY15_Solicitation.pdf PDF
_1 _General_MACC_Specifications.pdf PDF
Clarification_on_Draft_Documents_6_May_15.pdf PDF
MACC_FY15_Draft_RFP.doc DOC document
_7 _Site_Visit_Registration.doc DOC document
_2 _Seed_Project_1.pdf PDF
_6 _Past_Performance_Questionaire.docx DOCX document
_3 _Seed_Project_2.pdf PDF
_8 _Question_Submission.doc DOC document
_1 _General_MACC_Specifications.pdf PDF
_4 _Seed_Project_3.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Repair Bldg 8015 Work Bay 20 March 2015 FNWZ 14-0075

Statement of Work (SOW)

PROJECT TITLE: REPAIR BUILDING 8015 WORK BAY

PROJECT NUMBER: FNWZ 14-0075

TYPE OF WORK: Repair (524 monies)

POINTS OF CONTACT:

(1) BCE Representative: Mr. Conda Richards, 7 CES/CENMP, (325) 696-4210

(2) Using Agency: Mr. Lawrence Thompson, 7 LRS/LGRV, (325) 696-1056

(3) Contracting: Ms. Kimberly Welch, 7 CONS/LGCA, (325) 696-3685

1.1 PROJECT DESCRIPTION: The Design-Build Contractor (hereinafter referred to as “Contractor”) shall prepare a Design-Build Proposal for repair of two entrances at Building 9203. The Contractor shall be the Architect, Engineer, and Constructor of record for this project. Contractor shall be responsible for the professional quality, constructability, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design shall be accomplished under the direct supervision and be reviewed and approved by architects and engineers who are licensed professionals to practice in their respective professional field in a state or possession of the United States. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation shall alleviate the Contractor from performing any additional design as required to produce a complete set of construction documents.

1.2 ATTACHMENT LIST:

Attachment A: As-built Floor Plan for Bldg 9203

• 2014 Renovations Bldg 8015.dwg & pdf

Attachment B: Performance Objectives

1.3 SCOPE OF WORK:

1.3.1 Sawcut & remove portion of existing CMU wall for new 3’-6” x 7’-0” hollow metal door & frame. Door shall be primed & painted Grade III, extra heavy-duty, Model 2 (seamless), 16 ga. Frame shall be primed & painted 16 ga & anchored to masonry. Provide full wall width masonry frame to cover jambs/head. Provide masonry lintel & grout jambs as required for support. Provide office function Best 45H series, 15 lever, S trim, 626 finish. Provide floor stop. Float any floor irregularities at new opening with high strength epoxy.

1.3.2 Provide suspended LED lighting fixtures to provide an average 100 fc at 36” a.f.f. Fixtures shall be shielded to protect from impact damage. Fixtures shall be at 10’-0” minimum height a.f.f. and braced to prevent movement when overhead door is open. Provide three way switches at the exterior personnel and new opening. Reusing existing lighting circuits is acceptable, but all work shall meet Code.

1.3.3 Provide surface mounted dedicated 20 amp duplex circuits at eight (8) locations in the Work Bay mounted at 54” a.f.f. Tie into existing electrical panels where possible or add sub-panel as necessary. Field verification is required.

1.3.4 Paint new hollow metal door, frame, repaired/new CMU, & lintel to match existing. Conduit and outlet boxes/covers may remain galvanized.

1.3.5 Wash down and clean up all areas of demolition & new construction and other debris created by this work.

1.3.6 Provide specified drawings and documentation.

20 March 2015 FNWZ 14-0075

1.4 GENERAL REQUIREMENTS:

1.4.1 Design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and standards identified herein.

1.4.2 The Contractor is responsible for field survey; and for verifying all information provided herein an on the attached original construction drawing. The Contractor is also responsible for obtaining all information necessary to properly design and provide all work. Gathering information during design shall be coordinated through the Contracting Officer or Contract Administrator. The Contractor shall be responsible for coordination of project work activities with the Contracting Officer that would interrupt or limit the on-going daily activities in the facility. Any survey required to verify existing features, etc., shall be the responsibility of the Contractor.

1.5 SPECIFICATIONS AND MANUFACTURER’S RECOMMENDATIONS:

Contractor shall design and perform all work in accordance with the MACC Specifications and the manufacturer’s recommendations for each product used in the project.

1.6 EXISTING FACILITY DRAWINGS:

All available existing facility drawings will be provided by the Government as electronic images as listed herein.

All existing site, utility, facility conditions and dimensions indicated in the Government provided drawings shall be field verified by Contractor.

1.7 DIRECTION:

The Contractor shall accept directions only from the Dyess AFB Contracting Officer (CO). Requests or desires of the users or using agency made directly to the Contractor shall be immediately brought to the attention of the CO.

Any changes to the project scope or other provisions of the SOW must be authorized in writing by the CO.

1.8 DESIGN CRITERIA:

Design shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Engineering Technical Letters (ETL’s), HQ ACC Standard and all applicable regulations/codes. Applicable design criteria include, but are not limited to the following:

Edited Dyess specifications

Various Government and commercial criteria standards available in the Construction Criteria Base library (www.ccb.org)

Other applicable regulations and manuals Air Force Directorate of Departmental Publications Resources (www.e-publishing.af.mil)

1.9 CONSTRUCTION / DESIGN REVIEW DRAWINGS: Contractor shall design and provide construction drawings for Government review. The drawing set shall consist of the following sheets as a minimum:

C101 Cover Page with Area Map, Project Location, Symbols Legend, and Drawing Index A101 Demolition & New Construction Plans A202 Details E202 Electrical Details & Notes

20 March 2015 FNWZ 14-0075

1.10 SCHEDULE OF DESIGN AFTER AWARD SUBMITTALS: (To Be Decided (TBD) dates indicated below shall be proposed and submitted by the contractor in his construction progress schedule. A minimum of two weeks shall be allowed for government review between design submittals.)

Level of Design Required Date No. of Copies

50% Design Submittal TBD DWG’s: 4-Half Size; 4-Specifications and product cut sheets, 1 CD (See **Note below) 50% Design Onboard Review (Min. 7 days after submittal)

100% Final Design Complete TBD DWG’s: 4-Half Size, 2-set of spec’s & product cut sheets (3 hole punched in white binder with clear covers, provide all project information on covers & spine), 2-Specifications & product cut sheets spiral bound 1 CD (See **Note below)

100% Final Design Government Review Government review shall occur & may take 14 days prior to final design acceptance.

**Note: All Dyess submittals shall include all CAD drawings, specifications or product information cut sheets in pdf format and submitted on CD. All pdf’s shall be from original electronic documents, no scans allowed due to file size. All prints & electronic files shall be on Dyess title block issued on CD.

1.13 AS-BUILT DRAWINGS: Provide 22”x34” electronic prints on mylar of the as-built conditions. This shall include as a minimum the drawing sheets indicated in Section 1.9 above. Provide Autocad & PDF versions of the drawings on CD. Provide PDF’s of all submittals, product information, MSDS, etc. on CD. All electronic files including cost estimates, photographs, Revit models, renderings, etc. shall be uncompressed and provided on a CD, all pdf’s shall be from original electronic documents, no scans allowed due to file size and quality.

20 March 2015 FNWZ 14-0075

Attachment “A”: Original Construction Design Drawings for Building 9203

• 2014 Renovations Bldg 8015.dwg – CAD file of existing floor plan

• 2014 Renovations Bldg 8015.pdf – Plan & notes indicating locations of proposed demolition & new construction.

1392454892C Typewritten Text Partial Floor Plan 1/8" = 1'-0"

1392454892C Callout Provide new surface mounted dedicated 20 amp duplex at 54" aff, (typ 8)

1392454892C Callout Existing electrical panels. Field verify capacity & space.

1392454892C Line

1392454892C Callout Existing masonry control joint.

1392454892C Callout New hollow metal door & frame in existing CMU wall.

1392454892C Line

1392454892C Typewritten Text N

1392454892C Typewritten Text Former Paint Booth

20 March 2015 FNWZ 14-0075

Attachment “B”: Performance Objectives

ATTACHMENT C – PERFORMANCE OBJECTIVES

1. PERFORMANCE OBJECTIVES: The contractor’s proposal shall address each of the following Performance Objectives in a narrative describing in detail his understanding of the Statement of Work; and listing any exceptions to the SOW included in his Schedule of Items:

Performance Objective Current Brand

Criteria

1. Install new hollow metal door & frame in existing CMU wall.

Not Available

ANSI / BHMA / IBC

2. Provide new LED lighting in Work Bay

N/A NEC

3. Install power outlets in Work Bay N/A

NEC

4. Provide drawings & documentation. N/A MACC Specifications Appendix 1 & Appendix 2