_3 _Seed_Project_2.pdf

PDF 3 MB Posted

Attached to
Dyess AFB MACC Federal contract opportunity
Solicitation number
FA4661-15-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Draft Attachment 3 - Seed Project 2 Technical Documents

View the file

Other files for this federal contract opportunity

Other files attached to Dyess AFB MACC, newest first.
File Type Posted
Attachment__8 _Fan_Coil_Unit_Spec_for_Sample.pdf PDF
Amendment_3.pdf PDF
FA4661-15-R-0002-0002.pdf PDF
3-Bldg_7233_-_Available_As-Built_Drawings_after_Initial_Construction.pdf PDF
4-Bldg_7223_-_Available_As-Built_Drawings.pdf PDF
1-Prototypical_3_Story_Dorm_(Bldgs_7232_ _7233)_-_Initial_Construction_-_1954.pdf PDF
2-Bldg_7232_-_Available_As-Built_Drawings_after_Initial_Construction.pdf PDF
Response_to_Questions_29_June_15.pdf PDF
_7 _Sample_Project_Bid_Schedule.docx DOCX document
FA466116R0002_Amendment_1.pdf PDF
Slides.pdf PDF
Q A_Post_18_June_15.pdf PDF
SignIn_Sheet.pdf PDF
Site_Visit_Minutes.pdf PDF
_3 _Sample_Project_Drawings.pdf PDF
Dyess_AFB_MACC_FY15_Solicitation.pdf PDF
_4 _Past_Performance_Questionaire.pdf PDF
_5 _Site_Visit_Registration.doc DOC document
_6 _Question_Submission.doc DOC document
_2 _Sample_Project_Specifications.pdf PDF
_1 _General_MACC_Specifications.pdf PDF
_4 _Past_Performance_Questionaire.pdf PDF
_6 _Question_Submission.doc DOC document
_2 _Sample_Project_Specifications.pdf PDF
_1 _General_MACC_Specifications.pdf PDF
_3 _Sample_Project_Drawings.pdf PDF
_5 _Site_Visit_Registration.doc DOC document
Dyess_AFB_MACC_FY15_Solicitation.pdf PDF
Clarification_on_Draft_Documents_6_May_15.pdf PDF
_7 _Site_Visit_Registration.doc DOC document
_2 _Seed_Project_1.pdf PDF
_5 _Seed_Project_4.pdf PDF
MACC_FY15_Draft_RFP.doc DOC document
_8 _Question_Submission.doc DOC document
_1 _General_MACC_Specifications.pdf PDF
_4 _Seed_Project_3.pdf PDF
_6 _Past_Performance_Questionaire.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

Statement of Work (SOW)

PROJECT TITLE: REPAIR HANGAR 5112 SURGE SUPPRESSOR

PROJECT NUMBER: FNWZ 14-0073

TYPE OF WORK: Repair (524 monies)

POINTS OF CONTACT:

(1) BCE Representative: Mr. Murray Bouquet, 7 CES/CENMP, (325) 696-3465

(2) Using Agency: Capt. Carlos Colon, 7 CEOE (325) 696-4007

(3) Contracting: Ms. Kimberly Welch, 7 CONS/LGCA, (325) 696-3685

1.1 PROJECT DESCRIPTION: The Design-Build Contractor (hereinafter referred to as “Contractor”) shall prepare a Design-Build Proposal for repair of Hangar 5112 Surge Suppressor. The Contractor shall be the Engineer and Constructor of record for this project. Contractor shall be responsible for the professional quality, constructability, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design shall be accomplished under the direct supervision and be reviewed and approved by engineers who are licensed professionals to practice in their respective professional field in a state or possession of the United States. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation shall alleviate the Contractor from performing any additional design as required to produce a complete set of construction documents.

1.2 ATTACHMENT LIST:

Attachment A: Original Construction Design Drawings for Hangar 5112

• 5112 Project Location.pdf

• 5112 Fire Water Riser Drawing.pdf

• 5112 Fire Water Riser Photo.pptx

• 5112 Overall Floor Plan

• 5112 Overall Fire Sprinkler Plan

Attachment B: Dyess Edited Specifications

Section 21 13 13.00 10 - Water-Foam (AFFF) Sprinkler System, Fire Protection

Attachment C: Performance Objectives

1.3 SCOPE OF WORK:

1.3.1 Coordinate all of the work herein with the Dyess Fire Department (Bldg 5013), 7CES/CEOFE Control Shop (Bldg 8008), 7CES/CEOIU Water Shop (Bldg 8007), and 7CES/CEOFP Power Production (Bldg 8007) to disable the Suppression System and Fire Alarm Panel; insure Fire Pump Water Pressure is available; and that Fire Pump House Diesel Driven Fire Pump are supervised.

1.3.2 Disconnect the control wiring to the Deluge Release Valve and other electrical devices that may interfere with removal of the Surge Suppressor and associated devices.

1.3.3 Drain Water in Deluge Riser.

1.3.4 Remove and cap the existing Surge Suppressor located in the Deluge Riser.

1.3.5 Disassemble the existing Deluge Valve Riser and portions of the riser above the valve to include the AFFF Proportioner, AFFF stainless steel piping, and all other components in the riser necessary to raise the Deluge Valve and to provide space for the new location of the relocated Surge Suppressor.

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

1.3.6 Provide new Tee in Riser piping below the Deluge valve; and reinstall the exiting Surge Suppressor at the required new location.

1.3.7 Reassemble the existing Deluge Valve. Alter the piping and wiring as necessary; and reassemble all other portions of the riser above the valve to include the AFFF Proportioner, AFFF stainless steel piping, and all other components in the riser.

1.3.8 Pressure test the Deluge Valve riser.

1.3.9 Recharge the reinstalled Surge Suppressor.

1.3.10 Flow test the Deluge Valve riser with AFFF to verify the system will automatically start and provide the correct 3% AFFF/Water concentration.

1.3.11 Refill the AFFF Concentrate Tank with the same amount and type of AFFF used during the test.

1.3.12 Reset the Suppression System and Fire Alarm Panels such that they properly annunciate and report any trouble and alarm conditions back to the Dyess AFB Fire Department.

1.3.13 Wash down and clean up all areas of AFFF foam and other debris created by this work.

1.3.14 Provide specified drawings and documentation.

1.4 GENERAL REQUIREMENTS:

1.4.1 Design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and standards identified herein.

1.4.2 The Contractor is responsible for field survey; and for verifying all information provided herein an on the attached original construction drawing. The Contractor is also responsible for obtaining all information necessary to properly design and provide all work. Gathering information during design shall be coordinated through the Contracting Officer or Contract Administrator. The Contractor shall be responsible for coordination of project work activities with the Contracting Officer that would interrupt or limit the on-going daily activities in the facility. Any survey required to verify existing features, etc., shall be the responsibility of the Contractor.

1.5 SPECIFICATIONS AND MANUFACTURER’S RECOMMENDATIONS:

Contractor shall design and perform all work in accordance with the attached Specifications and the manufacturer’s recommendations for each product used in the project.

1.6 EXISTING FACILITY DRAWINGS:

All available existing facility drawings will be provided by the Government as electronic images as listed herein.

All existing site, utility, facility conditions and dimensions indicated in the Government provided drawings shall be field verified by Contractor.

1.7 PROPOSAL:

1.7.1 The Contractor shall prepare a proposal including the following:

1.7.1.1 Completed attached Schedule of Items

1.7.1.2 Complete Project Team to include the following:

a) Contractor: Primary point of contact, office phone number, cell phone number, & email address

b) Engineering Firm: Lead designers & key individual names

1.7.1.3 Completed Performance Objectives.

1.7.2 The Proposal may result in the award of a contract for design and construction.

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

1.7.3 Upon award, the Contractor shall prepare technical requirements, proposed product information cut sheets, and design drawings for Government review & approval. All submitted documents shall be prepared for this RFP in MS Word or Excel formats.

1.7.4 The Government will conduct reviews of the Contractor’s Design After Award submittals at the Concept Design (50%) and Final Design (100%) phases for SOW compliance.

1.8 DIRECTION:

The Contractor shall accept directions only from the Dyess AFB Contracting Officer (CO). Requests or desires of the users or using agency made directly to the Contractor shall be immediately brought to the attention of the CO.

Any changes to the project scope or other provisions of the SOW must be authorized in writing by the CO.

1.9 DESIGN CRITERIA:

Design shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Engineering Technical Letters (ETL’s), HQ ACC Standard and all applicable regulations/codes. Applicable design criteria include, but are not limited to the following:

Updated Dyess As-Built Drawing Requirements

Edited Dyess specifications

Various Government and commercial criteria standards available in the Construction Criteria Base library (www.ccb.org)

Other applicable regulations and manuals Air Force Directorate of Departmental Publications Resources (www.e-publishing.af.mil)

1.10 CONSTRUCTION / DESIGN REVIEW DRAWINGS: Contractor shall design and provide construction drawings for Government review. The drawing set shall consist of the following sheets as a minimum:

C101 Cover Page with Area Map, Project Location, Symbols Legend, and Drawing Index A001 General Information & Details E201 Electrical Plan E202 Electrical Details, Schedules, and List of Starter Electrical Devices E203 Point to Point Wiring Drawings E204 Sequence of Operation

1.11 SCHEDULE OF DESIGN AFTER AWARD SUBMITTALS: (To Be Decided (TBD) dates indicated below shall be proposed and submitted by the contractor in his construction progress schedule. A minimum of two weeks shall be allowed for government review between design submittals.)

Level of Design Required Date No. of Copies

50% Design Submittal TBD DWG’s: 6-Half Size; 6-Strike through Specifications and product cut sheets, Design Calculations, 1 CD (See **Note below)

50% Design Onboard Review (Min. 7 days after submittal)

100% Final Design Complete TBD DWG’s: 6-Half Size, 2-set of spec’s, product cut sheets, & Design Calculations

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

(3 hole punched in white binder with clear covers, provide all project information on covers & spine), 2-Specifications spiral bound 1 CD (See **Note below)

100% Final Design Government Review Government review shall occur & may take 14 days prior to final design acceptance.

**Note: All Dyess submittals shall include all CAD drawings, specifications or product information cut sheets in pdf format and submitted on CD. All pdf’s shall be from original electronic documents, no scans allowed due to file size. All prints & electronic files shall be on Dyess title block issued on CD.

1.12 AS-BUILT DRAWINGS: Provide 22”x34” electronic prints on mylar of the as-built conditions. This shall include as a minimum the drawing sheets indicated in Section 1.10 above. Provide Autocad & PDF versions of the drawings on CD. Provide PDF’s of all submittals, product information, MSDS, etc. on CD. All electronic files including cost estimates, photographs, Revit models, renderings, etc. shall be uncompressed and provided on a CD, all pdf’s shall be from original electronic documents, no scans allowed due to file size and quality.

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

Attachment “A”: Original Construction Design Drawings for Hangar 5112

• 5112 Project Location.pdf

• 5112 Fire Water Riser Drawing.pdf

• 5112 Fire Water Riser Photo.pptx

• 5112 Overall Floor Plan

• 5112 Overall Fire Sprinkler Plan

Quinndl Callout move expansion tank connection below deluge valve and above OS&Y Valve

Quinndl Line

Quinndl Line

Quinndl Line

Quinndl Line

Quinndl Callout Ok as is.

Quinndl Callout Ok as is.

Quinndl Callout Ok as is.

Quinndl Callout Ok as is.

Bldg 5112 Water Riser

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

Attachment “B”: Dyess AFB Edited Specifications

• Section 21 13 13.00 10 - Water-Foam (AFFF) Sprinkler System, Fire Protection

Repair Hangar 5112 Surge Suppressor DYESS AFB Project No. 14-0073

AFFF Section 21 13 13.00 - Page 1

SECTION 21 13 13.00 10

WATER-FOAM (AFFF) SPRINKLER SYSTEM, FIRE PROTECTION

PART 1 - GENERAL

1.1 APPLICABLE PUBLICATIONS: The latest edition of the publications listed below form a part of this specification. The publications are referred to in the text by basic designation only.

1.1.1 American National Standards Institute, Inc. (ANSI) Standards:

B16.1 Cast Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250 and 800

B16.9 Factory-Made Wrought Steel Buttwelding Fittings

B16.21 Nonmetallic Flat Gaskets for Pipe Flanges

B18.2.1 Square and Hex Bolts and Screws Inch Series

B18.2.2 Square and Hex Nuts (R 1983)

B36.19M Stainless Steel Pipe

1.1.2 American Society for Testing and Materials (ASTM) Publications:

A 47 Ferritic Malleable Iron Castings

A 120 Pipe, Steel, Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless, for Ordinary Uses

A 536 Ductile Iron Casting

A 575 Steel Bars, Carbon, Merchant Quality M-Grades

A 576 Steel Bars, Carbon, Hot-Wrought, Special Quality

1.1.3 American Water Works Association (AWWA) Standards:

C110-82 Ductile-Iron and Gray-Iron Fittings, 3 In. through 48 In., for Water and Other Liquids

C200-86 Steel Water Pipe 6 In. and Larger

C207-86 Steel Pipe Flanges for Water-Works Services - Sizes 4 In. through 144 In.

1.1.4 American Welding Society (AWS) Publication:

A5.8-81 Specification for Brazing Filler Metal

1.1.5 Military Specifications:

MIL F-24385D Fire Extinguishing Agent, Aqueous Film Forming Foam, Mar. 1989 (AFFF) Liquid Concentrate, for fresh and sea water

MIL T-27730A Tape, Antiseize, Polytetrafluoroethylene, with

AFFF Section 21 13 13.00 - Page 2

Dispenser (Apr 64)

1.1.6 National Fire Protection Association (NFPA) Standards:

No. 13 (1988) Sprinkler Systems, Installation No. 16 (1988) Foam-Water Sprinkler and Spray Systems No. 409 (1988) Aircraft Hangers

1.1.7 Manufacturers Standardization Society of the Valve and Fittings Industry, Inc. (MSS) Standards:

SP-69 Pipe Hangers and Supports -Selection and Application (1983)

SP-70 Cast Iron Gate Valves, Flanged and Threaded Ends (1984)

SP-80 Bronze Gate, Globe, Angle and Check Valves (1979)

1.2 GENERAL REQUIREMENTS:

1.2.1 Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products.

1.2.2 Asbestos Prohibition: Asbestos and asbestos-containing products shall not be used.

1.2.3 Nameplates: Pumps and motors shall have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment.

1.2.4 Verification of Dimensions: The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancy before performing the work.

1.2.5 Welding: Welding shall be in accordance with NFPA 13 and SECTION - 15M, Welding Stainless Steel Pipe. Only shop welding with appropriate welding fittings shall be used.

1.3 SUBMITTALS:

1.3.1 Shop Drawings: Shop drawings shall be submitted in accordance with SECTION 00700 - GENERAL and shall consist of illustrations, schedules, performance charts, instructions, brochures, diagrams and complete shop drawings of the sprinkler system from concentrate pump, storage tank, proportioner, controls, and any other information required to illustrate the system has been coordinated and will function as a unit.

Shop drawings shall conform to the requirements established for working plans as prescribed in NFPA 13.

Except as otherwise specified or shown, the sprinkler system shall be designed in accordance with NFPA 13 and NFPA 16. The Contractor's submittal must be signed by a registered Fire Protection Engineer or a registered Professional Engineer with a fire protection background and who has had at least two years experience in fire protection design. Qualifications shall be submitted to and approved by the Contracting Officer.

1.3.2 Test Procedures: The Contractor shall furnish to the Contracting Officer detailed test procedures for the fire protection system 14 days prior to performing system tests. The test procedures must be signed by a registered fire protection engineer or a registered Professional Engineer who has had at least 2 years experience in fire protection design. Qualifications shall be submitted to and approved by the Contracting Officer.

1.3.3 Performance Test Reports: Upon completion and testing of the installed system, test reports shall be submitted in booklet form showing all field tests performed to adjust each component and all field tests

AFFF Section 21 13 13.00 - Page 3 performed to prove compliance with the specified performance criteria.

1.3.4 Performance Test Reports: Upon completion and testing of the installed system, test reports shall be submitted in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria. Each test report shall indicate the final position of controls.

1.3.5 Qualifications of Welders: Submit certificates of each welder's qualifications prior to site welding;

certifications shall not be more than one year old.

1.3.6 Qualifications of Installer: Prior to installation, submit data for approval showing that the Contractor has successfully installed associated equipment of the same type and design as specified herein, or that he has a firm contractual agreement with a subcontractor having such required experience. The data shall include the names and locations of at least two installations where the Contractor, or the subcontractor referred to above, has installed such systems. Indicate the type and design of each system and certify that each system has performed satisfactorily in the manner intended for a period of not less than 18 months.

1.4 DELIVERY AND STORAGE: All equipment placed in storage shall be stored with protection from the weather, humidity and temperature variations, dirt and dust or other contaminants.

PART 2 - PRODUCTS AND EXECUTION

2.1 MATERIALS: Materials and equipment shall conform to the respective publications and other requirements specified herein.

2.1.1 Bolts and Nuts:

2.1.1.1 Square head Bolts and Heavy Hexagon Nuts: ANSI B18.2.1 and B18.2.2 and ASTM A 307, A 575, or A 576.

2.1.1.2 Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service, ASTM A193/193M.

2.1.2 Brazing Filler Metal: AWS A5.8, Classification BCuP-3 or BCuP-4.

2.1.3 Caulking Lead: Fed. Spec. QQ-C-40, Type I.

2.1.4 Foam Concentrate Liquid: MIL. F-24385, 3% Aqueous Film

Forming Foam Concentrate.

2.1.5 Flange Dimensions: ANSI B16.1 or AWWA C207.

2.1.6 Gaskets:

Gaskets shall be nonasbestos compressed material in accordance with ANSI B16.21, 1/16-inch thickness, full face or self-centering flat ring type. The gaskets shall contain aramid fibers bonded with styrene butadiene rubber (SBR) or nitrile butadiene rubber (NBR). NBR binder shall be certified by letter from manufacturer to be suitable for use with concentrated AFFF.

2.1.7 Lubricant: Gasket lubricant shall be as recommended by the pipe manufacturer.

2.1.8 Pipe:

2.1.8.1 Water and Water-Foam Solution Line: Steel Pipe, ASTM A 120, Schedule 40, and AWWA C200.

AFFF Section 21 13 13.00 - Page 4

2.1.8.2 Foam (AFFF) Concentrate Line and Pump Pressure Sensing Lines: Schedule 40 stainless steel, corrosion resistant pipe.

2.1.9 Pipe Fittings:

2.1.9.1 Water and Water-Foam Solution Line: Fittings shall be steel, cast iron, ductile iron, or malleable iron for specified steel pipe.

2.1.9.2 Cast iron fittings shall conform to AWWA C110 or ANSI B16.1.

2.1.9.3 Malleable-iron fittings shall conform to ANSI B16.3.

2.1.9.4 Foam Concentrate Line: Fittings shall either be welded stainless steel or cut-grooved mechanical joints. Screw fittings are permitted only on schedule 40 brass pipe or flared stainless steel sensing lines.

Socket Welded 2,000-pound per square inch (psi) water, forged corrosion-resistant steel, socket weld, conforming to ASTM A182, Grade F 316 and ANSI B16.11

Buttwelded Schedule 40, long radius, buttweld, corrosion-resistant steel, conforming to ASTM A403, WP 316, ANSI B16.9, and

ANSI B36.19

Bolting Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service, ASTM A193/193M.

Grooved Coupling Couplings shall have a 175-psi minimum working pressure with a housing fabricated in two or more parts, of stainless steel. Coupling gasket shall be molded synthetic rubber, conforming to ASTM D2000, Grade R615BZ. Gasket material shall be certified by the concentrated AFFF manufacturer for use in the service intended. Coupling bolts shall be oval-neck, track-head type, with hexagonal heavy nuts conforming to ASTM A183.

All pipe fittings used with couplings shall be fabricated of stainless steel.

Fittings shall be fabricated of stainless steel with wall thickness to match pipe, conforming to ASTM A234 and

ANSI B16.9.

Recommended source of grooved pipe couplings and fittings include Victaulic Style 77, Grade H.

2.1.10 Pipe Hangers: Hangers shall be in accordance with NFPA 13, and in accordance with UL requirements for use in sprinkler systems. When used, MSS SP-69 type 19 and type 23 C-clamps shall be torqued per MSS SP-69 and have both locknuts and retaining devices furnished by the manufacturer. The C-clamp body shall not be constructed from bent plates. A suitably anchored thrust support shall be provided for each change in horizontal direction of pipes and shall be designed to prevent any horizontal movement upon system actuation.

2.1.11 Valves for Water and Water-Foam Solution Line:

2.1.11.1 Gate Valves: Under 2-inch size valves shall be in accordance with MSS SP-80; 2-inch to 3-inch size, valves shall conform to the requirements of MSS SP-80 or MSS SP-70; above 3-inch size, valves shall meet the requirements of MSS SP-70.

2.1.11.2 Check Valves: Under 3-inch size valves shall meet the requirements of MSS SP-80. Valves 3

AFFF Section 21 13 13.00 - Page 5 inches and larger shall be iron body, bronze-mounted. All valves shall be listed in UL Fire Protection Equipment Directory or FM Approval Guide and shall be straightway type, suitable for vertical or horizontal installation with end connections as required to mate with piping in which the valve must be installed.

2.1.12 Valves for Foam Concentrate Line:

2.1.12.1 Manual Valves: Corrosion resistant, cast stainless steel valves. Valve body and bonnet shall be constructed of Type 316 stainless steel conforming to ASTM A276. Valve shall be 150 psi rated, Hammond "SS" series or approved equal unless otherwise indicated.

2.1.12.2 Two-position Hydraulically Operated Shutoff Valves: Corrosion resistant, stainless steel construction, weld ends, 150 psig, ball valve complete with hydraulic actuator as indicated. Valve shall be no less than line size and shall have pressure drop no greater than 2 ft. of water.

2.2 PIPE AND FITTINGS:

2.2.1 Pipe: Pipe used shall not be subject to a working pressure in excess of 25 percent of the hydrostatic pressure test required by ASTM A 120.

2.2.2 Joints: Joints shall conform to NFPA 13. Shop welded joints will be permitted. Flanged joints shall be provided where indicated or required by NFPA 13. Only welded or flanges joints shall be used on the foam concentrate line.

2.1.2.1 Threaded joints shall be cut with an approved thread-cutting oil and shall conform to Fed. Std. H28.

Joints shall be made tight with a stiff mixture of litharge and glycerin or other approved thread-joint com-pound or tape. Not more than three threads shall show after the joint is made up.

2.1.2.2 Flanged joints shall be faced true, provided with gaskets and made square and tight.

2.1.2.3 Mechanical grooved pipe joints for water or foam-water supply shall conform to AWWA C606. Joints shall be made using a UL listed or FM approved combination of fittings, gaskets, and grooves. Cut pipe grooves shall be dimensionally compatible with the fittings. Systems shall utilize only those mechanical grooved couplings which are UL listed or FM approved for dry pipe service.

a. Mechanical pipe couplings shall be of the bolted type and shall consist of a housing fabricated in two or more parts, a synthetic rubber gasket, and nuts and bolts to secure unit together.

b. Housings shall be of malleable iron conforming to ASTM A 47, Grade 32510 or ductile iron conforming to

ASTM A 536, Grade 65-45-12. Coupling nuts and bolts shall be of steel and conform to ASTM A 183.

2.2.3 Fittings: Fittings for aboveground piping shall be of a type specifically approved for use in sprinkler systems. Bushings shall be used only where standard fittings of the required size are not available. The use of bushings is further restricted to requirements of NFPA 13.

2.2.4 Reducers: Reductions in pipe sizes shall be made with one-piece reducing fittings. Bushings will not be acceptable.

2.2.5 Pipe Supports and Hangers: The recommended methods and requirements for supporting of hanging pipe as set forth in NFPA 13 shall be mandatory.

2.2.6 Drains: The sprinkler system shall be provided with complete drainage facilities as indicated and in accordance with NFPA No. 13.

AFFF Section 21 13 13.00 - Page 6

2.3 DELUGE AND SOLENOID VALVES: Existing deluge valves and solenoid valves shall be reinstalled in accordance with the manufacturer’s recommendations to provide a complete operable automatic deluge system, suitable for manual and automatic operation.

2.4 MANUAL TRIPPING DEVICES: Devices for testing the valve and actuating system shall be reinstalled in accordance with the manufacturer’s recommendations to provide a complete operable automatic deluge system, suitable for manual and automatic operation.

2.5 PUMPS: The existing AFFF positive displacement type jockey and main pumps and the respective pump controllers shall be tested for automatic operation to provide a complete operable automatic deluge system, suitable for manual and automatic operation.

2.6 STORAGE TANKS: Existing AFFF Concentrate Tanks store Aqueous Film Forming Foam (AFFF) Concentrate with specific gravity of 1.024 s.g. and liquid pH range of 8.0. Contractor shall replenish all AFFF Concentrate used during the system tests.

2.7 WATER-FORM PROPORTIONERS: The existing proportioner assembly shall be reinstalled and tested to provide a complete operable automatic deluge system, suitable for manual and automatic operation.

2.8 SURGE SUPPRESSOR: The Contractor shall obtain the existing surge suppressor (to be relocated) data from the original fire protection subcontractor. The data shall be used to charge the surge suppressor to meet the calculated performance requirements based on the piping system shown on the original construction drawings. The surge suppressor supplier shall furnish a service person trained to provide installation checkout assistance and to supervise operation and testing necessary to place the surge control system into service.

Contractor shall provide the nitrogen and all necessary equipment to include charging gauge, adaptor, and hose assembly to charge the suppressor tank bladder.

PART 3 EXECUTION

3.1 INSTALLATION: Unless otherwise indicated or specified, all materials and equipment shall be installed in accordance with the manufacturer's recommendations and in accordance with NFPA 13 and NFPA 16.

Cutting structural members for passage of pipes or for pipe hanger fastenings will not be permitted. The system shall be installed by an experienced firm regularly engaged in the installation of fire protection sprinkler systems in accordance with NFPA standards. The Contracting Officer may reject any proposed installer who cannot show evidence of such qualifications. Contracting Officer's approval will not relieve the Contractor from his responsibilities to perform all work in accordance with specifications and contract terms.

3.2 INSPECTION BY FIRE PROTECTION SPECIALIST: The Fire Protection Specialist shall perform a thorough inspection of the fire equipment installation, including visual observation of the equipment while being tested, to assure that the installation conforms to the contract requirements. There shall be no excessive vibration, leaks, unusual noises, overheating, or other potential problems. Inspection shall include piping and equipment clearance, access, supports, and guards. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered. The Fire Protection Specialist shall witness the preliminary and final acceptance tests and, after completion of the inspections and a successful final acceptance test, shall sign test results and certify in writing that the installation the fire pump installation is in accordance with the contract requirements.

3.3 INSTALLATION REQUIREMENTS: Carefully remove materials so as not to damage material which is to remain. Replace existing work damaged by the Contractor's operations with new work of the same construction. Equipment, materials, workmanship, fabrication, assembly, erection, installation, examination, inspection and testing shall be in accordance NFPA 20, except as modified herein.

3.4 PIPE AND FITTINGS: Piping shall be inspected, tested and approved before burying, covering, or

AFFF Section 21 13 13.00 - Page 7 concealing. Fittings shall be provided for changes in direction of piping and for all connections. Changes in piping sizes shall be made using tapered reducing pipe fittings. Bushings shall not be used.

3.4.1 Cleaning of Piping

Interior and ends of piping shall be clean and free of any water or foreign material. Piping shall be kept clean during installation by means of plugs or other approved methods. When work is not in progress, open ends of the piping shall be securely closed so that no water or foreign matter will enter the pipes or fittings. Piping shall be inspected before placing in position.

3.4.2 Threaded Connections

Jointing compound for pipe threads shall be polytetrafluoroethylene (PTFE) pipe thread tape conforming to ASTM D 3308and shall be applied to male threads only. Exposed ferrous pipe threads shall be provided with one coat of zinc molybdate primer applied to a minimum of dry film thickness of 1 mil.

3.4.3 Pipe Hangers and Supports

Additional hangers and supports shall be provided for concentrated loads in aboveground piping, such as for valves and risers.

3.4.3.1 Vertical Piping

Piping shall be supported at each floor, at not more than 3 meters ( 10 foot) intervals.

3.4.3.2 Horizontal Piping

Horizontal piping supports shall be spaced as follows:

MAXIMUM SPACING (METERS)

Nominal 25 and 32 40 50 65 80 90 100 125 150+ Pipe Under Size (mm) Copper 1.8 2 2.4 Tube

Steel 2 2.4 2.7 3 3.3 3.6 3.9 4.2 4.8 5.0 Pipe

(MAXIMUM SPACING (FEET)

Nominal 1 and 1.25 1.5 2 2.5 3 3.5 4 5 6+ Pipe Under Size (inches)

Copper 6 7 8 Tube

Steel 7 8 9 10 11 12 13 14 16 17 Pipe

AFFF Section 21 13 13.00 - Page 8

3.4.4 Underground Piping (N/A)

3.4.5 Grooved Mechanical Joint

Grooves shall be prepared according to the coupling manufacturer's instructions. Grooved fittings, couplings, and grooving tools shall be products of the same manufacturer. Pipe and groove dimensions shall comply with the tolerances specified by the coupling manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances. Grooved joints shall not be used in concealed locations, such as behind solid walls or ceilings, unless an access panel is shown on the drawings for servicing or adjusting the joint.

3.5 ELECTRICAL WORK: Electric motor and controls shall be in accordance with NFPA 20, NFPA 72 and NFPA 70, unless more stringent requirements are specified herein or are indicated on the drawings. Provide wiring in rigid metal conduit or intermediate metal conduit, except electrical metallic tubing conduit may be provided in dry locations not enclosed in concrete or where not subject to mechanical damage.

3.6 FLUSHING: The fire pump suction and discharge piping shall be flushed at 150 percent of rated capacity of each pump. Where the pump installation consists of more than one pump, the flushing shall be the total quantity of water flowing when all pumps are discharging at 150 percent of their rated capacities. The new pumps may be used to attain the required flushing volume. No underground piping shall be flushed by using the fire pumps. Flushing operations shall continue until water is clear, but not less than 10 minutes. The Contractor shall submit a signed and dated flushing certificate before requesting field testing.

3.7 FIELD TESTS: The Contractor shall submit, at least 2 weeks before starting field tests, system diagrams that show the layout of equipment, piping, and storage units, and typed condensed sequence of operation, wiring and control diagrams, and operation manuals explaining preventative maintenance procedures, methods of checking the system for normal, safe operation, and procedures for safely starting and stopping the system shall be framed under glass or laminated plastic. After approval, these items shall be posted where directed.

3.7.1 Hydrostatic Test

Piping shall be hydrostatically tested at 225 psig for a period of 2-hours, or at least 50 psi in excess of the maximum pressure, when the maximum pressure in the system is in excess of 175 psi in accordance with

NFPA 20.

3.7.2 Preliminary Tests

The Fire Protection Specialist shall take all readings and measurements. The Manufacturer's Representative, a representative of the fire pump controller manufacturer, and a representative of the diesel engine manufacturer (when supplied) shall witness the complete operational testing of the fire pump and drivers. The fire pump controller manufacturer's representative and the diesel engine manufacturer's representative shall each be an experienced technician employed by the respective manufacturers and capable of demonstrating operation of all features of respective components including trouble alarms and operating features. Fire pumps, drivers and equipment shall be thoroughly inspected and tested to insure that the system is correct, complete, and ready for operation. Tests shall ensure that pumps are operating at rated capacity, pressure and speed. Tests shall include manual starting and running to ensure proper operation and to detect leakage or other abnormal conditions, flow testing, automatic start testing, testing of automatic settings, sequence of operation check, test of required accessories; test of pump alarms devices and supervisory signals, test of pump cooling, operational test of relief valves, and test of automatic power transfer, if provided. Pumps shall run without abnormal

AFFF Section 21 13 13.00 - Page 9 noise, vibration or heating. If any component or system was found to be defective, inoperative, or not in compliance with the contract requirements during the tests and inspection, the corrections shall be made and the entire preliminary test shall be repeated.

3.7.3 N/A

3.7.4 Final Acceptance Test

The Fire Protection Specialist shall take all readings and measurements. The Manufacturer's Representative, the fire pump controller manufacturer's representative, and the diesel engine manufacturer's representative (when supplied) shall also witness for the final tests. The Contractor shall be responsible for repairing any damage caused by hose streams or other aspects of the test. The final acceptance test shall include the following:

3.7.4.1 Flow Tests

Flow tests using the test header, hoses and play pipe nozzles shall be conducted. Flow tests shall be performed at churn (no flow), 75, 100, 125 and 150 percent capacity for each pump and at full capacity of the pump installation. Flow readings shall be taken from each nozzle by means of a calibrated pitot tube with gauge or other approved measuring equipment. Rpm, suction pressure and discharge pressure reading shall be taken as part of each flow test. Voltage and ampere readings shall taken on each phase as part of each flow test for electric-motor driven pumps.

3.7.4.2 Starting Tests

Pumps shall be tested for automatic starting and sequential starting. Setting of the pressure switches shall be tested when pumps are operated by pressure drop. Tests may be performed by operating the test connection on the pressure sensing lines. As a minimum, each pump shall be started automatically 10 times and manually 10 times, in accordance with NFPA 20. Tests of engine-driven pumps shall be divided equally between both set of batteries. The fire pumps shall be operated for a period of a least 10 minutes for each of the starts.

Pressure settings that include automatic starting and stopping of the fire pump(s) shall be indicated on an etched plastic placard, attached to the corresponding pump controller.

3.7.4.3 Alarms

All pump alarms, both local and remote, shall be tested. Supervisory alarms for diesel drivers shall be electrically tested for low oil pressure, high engine jacket coolant temperature, shutdown from overspeed, battery failure and battery charger failure.

3.7.4.4 Miscellaneous

Valve tamper switches shall be tested. Pressure recorder operation relief valve settings, valve operations, operation and accuracy of meters and gauges, and other accessory devices shall be verified.

3.7.4.5 Correction of Deficiencies

If equipment was found to be defective or non-compliant with contract requirements, the Contractor shall performed corrective actions and repeat the tests. Tests shall be conducted and repeated if necessary until the system has been demonstrated to comply with all contract requirements.

3.7.4.6 Test Documentation

The Manufacturer's Representative shall supply a copy of the manufacturer's certified curve for each fire pump

AFFF Section 21 13 13.00 - Page 10 at the time of the test. The Fire Protection Specialist shall record all test results and plot curve of each pump performance during the test. Complete pump acceptance test data of each fire pump shall be recorded. The pump acceptance test data shall be on forms that give the detail pump information such as that which is indicated in Figure A-11-2.6.3(f) of NFPA 20. All test data records shall be submitted in a three ring binder.

3.7.4.7 Test Equipment

The Contractor shall provide all equipment and instruments necessary to conduct a complete final test, including 65 mm( 2.5 inch) diameter hoses, playpipe nozzles, pitot tube gauges, portable digital tachometer, voltage and ampere meters, and calibrated oil-filled water pressure gauges. The Contractor shall provide all necessary supports to safely secure hoses and nozzles during the test. The Government will furnish water for the tests.

3.7.5 As-Built Drawings

The Contractor shall submit As-Built Drawings, no later than 14 days after completion of the Final Tests. The Fire Pump Installation Drawings shall be updated to reflect as-built conditions after all related work is completed and shall be on reproducible full-size mylar film; and ACAD and Pdf files on CDRom.

3.8 DISINFECTION: After all system components are installed including pumps, piping, and other associated work, and all hydrostatic tests are successfully completed, thoroughly flush the pumps and all piping to be disinfected with potable water until there is no visible sign of dirt or other residue and hydrostatic test are successfully completed, each portion of the piping specified in this Section system to be disinfected shall be thoroughly flushed with potable water until all entrained dirt and other foreign materials have been removed before introducing chlorinating material.

3.8.1 Chlorination

The chlorinating material shall be hypochlorites or liquid chlorine. The chlorinating material shall be fed into the sprinkler piping at a constant rate of 50 parts per million (ppm). A properly adjusted hypochlorite solution injected into the system with a hypochlorinator, or liquid chlorine injected into the system through a solution-fed chlorinator and booster pump shall be used. Chlorination application shall continue until the entire system if filled. The water shall remain in the system for a minimum of 24 hours. Each valve in the system shall be opened and closed several times to ensure its proper disinfection. Following the 24-hour period, no less than 25 ppm chlorine residual shall remain in the system.

3.8.2 Flushing

The system shall then be flushed with clean water until the residual chlorine is reduced to less than one part per million. Samples of water in disinfected containers for bacterial examination will be taken from several system locations which are approved by the Contracting Officer.

3.9 FIELD TRAINING: The Fire Protection Specialist and the Manufacturer's Representative shall conduct a training course for operating and maintenance personnel as designated by the Contracting Officer. Training shall be provided for a period of 4 hours of normal working time and shall start after the fire pump installation is functionally complete and after the Final Acceptance Test. The field instruction shall cover all of the items contained in the approved Operating and Maintenance Instructions.

***END OF SECTION***

Statement of Work (SOW) Repair Hangar 5112 Surge Suppressor 20 March 2015 FNWZ 14-0073

Attachment “C”: Performance Objectives

ATTACHMENT C – PERFORMANCE OBJECTIVES

1. PERFORMANCE OBJECTIVES: The contractor’s proposal shall address each of the following Performance Objectives in a narrative describing in detail his understanding of the Statement of Work; and listing any exceptions to the SOW included in his Schedule of Items:

Performance Objective Current Brand

Criteria

1. Disconnect the control wiring to the Deluge Release Valve.

Not Available

NEC / NFPA

2. Drain Water in Deluge Riser. N/A

3. Remove and cap the existing Surge Suppressor located in the Deluge Riser.

N/A

IPC / NFPA

4. Disassemble Deluge Valve Riser. N/A IPC / NFPA

5. Install new Tee & reinstall Surge Suppressor.

N/A IPC / NFPA

6. Reassemble the existing Deluge Valve N/A NEC / IPC / NFPA

7. Pressure test & recharge assembly. N/A IPC / NFPA

8. Flow test Deluge Valve riser. N/A IPC / NFPA

9. Refill AFFF Concentrate Tank N/A

10. Reset all Panels. N/A

11. Wash down & clean up. N/A

12. Provide Training N/A