Atch 6 Cost Breakdown Sheet Rev3.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
AMENDMENT 06 (15 Sept 2025): Topside Deep Clean at 15 Missile Alert Fields (MAFs), FE Warren AFB, Wyoming
Solicitation number
FA461325R0009
Issued by

About this file

The document is a Cost Breakdown Sheet (Attachment 6, Revision 3) for a deep cleaning project at 15 Missile Alert Facilities (MAFs) located at FE Warren Air Force Base in Wyoming. The Excel spreadsheet details specific cleaning requirements across multiple areas, including flooring (1,779 sq ft per MAF), ceilings (317 sq ft per MAF), walls (940 sq ft per MAF), and various accessories such as bathroom/kitchen fixtures, mirrors, and other elements.

The associated federal contract opportunity requires contractors to submit a detailed cost proposal using this breakdown sheet, with specific instructions to fill in unit prices for each cleaning area. Contractors must also submit a Quality Control Plan, 2-page Past Performance document, and comply with NIST SP 800-171 cybersecurity requirements (minimum score of 110). The solicitation emphasizes that funds are not currently available, and the contract is contingent on future appropriations. Proposal submissions are due by 11:00 am MST on Friday, 19 September 2025, with questions to be submitted to specific Air Force contacts (Megan Evans and Liezel McIntyre).

View the file

Other files

File Type Posted
Conformed Copy.pdf PDF
Amendment 06.pdf PDF
Atch 8 Additional Info During Extension.pdf PDF
Conformed Copy.pdf PDF
Atch 6 Cost Breakdown Sheet Rev2.xlsx XLSX spreadsheet
Amendment 05.pdf PDF
Atch 6 Cost Breakdown Sheet Rev1.xlsx XLSX spreadsheet
Atch 6 Cost Breakdown Sheet Rev1.xlsx XLSX spreadsheet
Conformed Copy.pdf PDF
Amendment 04.pdf PDF
Atch 7 PreBid Questions and Answers 3 Sept 25.pdf PDF
Amendment 03.pdf PDF
Amendment 02.pdf PDF
Atch 1 PWS 27 AUG 2025 R1.pdf PDF
Conformed Copy 27 Aug 2025.pdf PDF
Amendment 01.pdf PDF
Conformed Copy.pdf PDF
Atch 6 Cost Breakdown Sheet.xlsx XLSX spreadsheet
Atch 5 Combined Wage Determinations.pdf PDF
Atch 1 PWS 06 AUG 2025.pdf PDF
Atch 4 Hazmat Authorization Request.pdf PDF
Atch 2c SPRS Registration.pdf PDF
Atch 2 MFR CUI Receipt.pdf PDF
Atch 3 AF 66 Submittal Register.pdf PDF
Atch 2b NIST SP800-171 Entry Guide.pdf PDF
Atch 2a NIST SP 800-171 Assessment.pdf PDF
Solicitation - FA461325R0009.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Costs Breakdown
MAF Areas to be CleanedDescription:**Square Footage verified with drawings.Unit PriceTotal for 1 MAFTotal for 15 MAFs
FlooringRubber Tile and Tile: See drawings and PWS Sections 2 and 4 for areas without carpet to be cleaned.100, 101, 102,103, 104, 106, 109, 110a, 110, 111, 123, 124, 125, 129 , 130.1779 sq ft$ - 0$ - 0$ - 0Total Sq Footage for all 15 MAFs: 26,685 sq ft

Ceiling Kitchen (16 x 17) and Showers ceilings (9 sq ft) (male and female) 317 sq ft $ - 0 $ - 0 $ - 0 Total Square Footage for all 15 MAFs: 4755 sq ft

Walls Rooms: See PWS Table 1 for walls to be cleaned, 100, 101, 102, 103, 104, 106, 108, 109, 110, 110A, 111, 112, 113, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 135, 129, 130 (no closets except 101 and 102). 940 sq ft $ - 0 $ - 0 $ - 0 Total Square Footage for all 15 MAFs: 14,100 sq ft

Accessories: Bathroom/Kitchen Kitchen and Bathrooms: See PWS Table 1 and Sections 2 and 4. 1 Gallon $ - 0 $ - 0 $ - 0 Total is 15 Gallons.

Accessories: Bathroom Mirrors Mirrors: See PWS Table 1 and Sections 2 and 4. 4 Each $ - 0 $ - 0 $ - 0 Total 60 Each.

Accessories: Fixtures (faucet, sink, urinal, etc.)Fixtures: Include faucets, shower handles, stalls, partitions, doors, handles, toilets, urinals, sink handles. See PWS Table 1 and Sections 2 and 4.30 Each$ - 0$ - 0$ - 0Total 450 Each.
$ - 0
TOTAL EVALUATED PRICE$ - 0
Instruction for Contractor:
1. Contractor fills out unit price in Cells D4, D7, D10, D13, D16, and D19 for each area.
2. Column E is the final price per area for 1 MAF.
3. Column F is the final price per area for all 15 MAFs.
4. Cell F21 is the total evaluated price proposal.
**Note that these are the verified/actual squrae footage to be cleaned per MAF (multiplied by 15 locations). Unit price should take into account productivity rate for the cleaning service (industry standards measured hourly). Note that CUI docs show distance to the MAFs. Depending on contractor's schedule/manpower, MAF locations may be cleaned in groups.

File details come from the government source that posted it. Updated .