Atch 3 AF 66 Submittal Register.pdf
PDF 89 KB Posted
- Attached to
- AMENDMENT 06 (15 Sept 2025): Topside Deep Clean at 15 Missile Alert Fields (MAFs), FE Warren AFB, Wyoming
- Solicitation number
- FA461325R0009
About this file
This document is a Schedule of Material Submittals for a Deep Clean project for 15 MAFs (Maintenance Activity Facilities), with the project number GHLN 25-0347. The form outlines specific documentation and materials that must be submitted by the contractor upon contract award or at specified intervals, including EAL Documentation, Safety Data Sheets, Hazardous Materials information, Storage Plan, Project Schedule, and As-Built Drawings. Key submission requirements include providing camera details upon award, submitting a project schedule within 15 days after award, and delivering as-built drawings 30 days prior to project close-out. The document uses an Air Force Form 66 (OCT 89 version) and is structured to track various submission types such as certification of compliance, shop drawings, samples, manufacturer's recommendations, warranties, and other critical project documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conformed Copy.pdf | ||
| Amendment 06.pdf | ||
| Atch 6 Cost Breakdown Sheet Rev3.xlsx | XLSX spreadsheet | |
| Atch 8 Additional Info During Extension.pdf | ||
| Conformed Copy.pdf | ||
| Atch 6 Cost Breakdown Sheet Rev2.xlsx | XLSX spreadsheet | |
| Amendment 05.pdf | ||
| Atch 6 Cost Breakdown Sheet Rev1.xlsx | XLSX spreadsheet | |
| Conformed Copy.pdf | ||
| Amendment 04.pdf | ||
| Atch 6 Cost Breakdown Sheet Rev1.xlsx | XLSX spreadsheet | |
| Amendment 03.pdf | ||
| Atch 7 PreBid Questions and Answers 3 Sept 25.pdf | ||
| Conformed Copy 27 Aug 2025.pdf | ||
| Amendment 02.pdf | ||
| Atch 1 PWS 27 AUG 2025 R1.pdf | ||
| Conformed Copy.pdf | ||
| Amendment 01.pdf | ||
| Atch 2c SPRS Registration.pdf | ||
| Atch 2 MFR CUI Receipt.pdf | ||
| Atch 2b NIST SP800-171 Entry Guide.pdf | ||
| Atch 2a NIST SP 800-171 Assessment.pdf | ||
| Solicitation - FA461325R0009.pdf | ||
| Atch 6 Cost Breakdown Sheet.xlsx | XLSX spreadsheet | |
| Atch 5 Combined Wage Determinations.pdf | ||
| Atch 1 PWS 06 AUG 2025.pdf | ||
| Atch 4 Hazmat Authorization Request.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B
ER
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
E' S
R
EC
O M
M
EN
D A
TI
O
N S
M A
N U
FA
C
TU
R
ER
'S
W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R U
C
TI
O N
S
TE
ST
S
R
EP
O R
TS
R
EQ
U
IR
ED
S
U B
M
IS
SI
O
N
D
TE
TE
R
EC
EI
VE
IN
C O
N
TR
A C
TI
N
G
D A
TE
T
O C
IV
IL
EN
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D A
TE
FO
LL
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N
TR
A C
TO
R
R
ES
U
B M
IT
TA
L
FI
N
A L
A
PP
R O
VA
L
REMARKS
APPROVED DISAPPROVED
1 EAL Documentation X Upon Award Include camera (make/model, year)
2 X Upon Award
3 X Upon Award
Safety Data Sheets
X Upon Award
Cleaning products and equipment
Hazardous Materials
X
Cleaning products and equipment
Storage Plan (if required)
X
Cleaning products and equipment
Project Schedule 15 Days After
Award
As-Built Drawings X 30 Days Prior to Close Out
AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency
Deep Clean 15 MAFsGHLN 25-0347
PROJECT TITLE
Cleaning products and equipment
Cleaning products and equipment
Sheet 1