The file is a Cost Breakdown Sheet (Attachment 6) for a deep cleaning project at 15 Missile Alert Facilities (MAFs) located at FE Warren Air Force Base in Wyoming. The detailed Excel spreadsheet breaks down cleaning requirements by area type, including flooring (54,825 sq ft across carpet, rubber tile, and tile), ceilings (3,885 sq ft), walls (904 sq ft), and various accessories like bathroom fixtures, mirrors, and kitchen elements. The document provides instructions for contractors to fill out unit pricing for each area, with pricing to be calculated for one MAF and then multiplied across 15 total locations.
The associated federal contract opportunity, solicitation number FA461325R0009, is issued by the Department of the Air Force Global Strike Command and requires contractors to submit proposals by 11:00 am MST on Tuesday, 16 September 2025. Key submission requirements include a signed CUI (Controlled Unclassified Information) receipt, NIST SP 800-171 assessment with a minimum score of 110, a Quality Control Plan, and a 2-page past performance document. The contract notes that funds are not currently available and are contingent on appropriation, with the deep cleaning project based on a Performance Work Statement dated 27 August 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 06.pdf | ||
| Atch 6 Cost Breakdown Sheet Rev3.xlsx | XLSX spreadsheet | |
| Conformed Copy.pdf | ||
| Atch 8 Additional Info During Extension.pdf | ||
| Amendment 05.pdf | ||
| Conformed Copy.pdf | ||
| Atch 6 Cost Breakdown Sheet Rev1.xlsx | XLSX spreadsheet | |
| Atch 6 Cost Breakdown Sheet Rev1.xlsx | XLSX spreadsheet | |
| Conformed Copy.pdf | ||
| Amendment 04.pdf | ||
| Atch 7 PreBid Questions and Answers 3 Sept 25.pdf | ||
| Amendment 03.pdf | ||
| Conformed Copy 27 Aug 2025.pdf | ||
| Amendment 02.pdf | ||
| Atch 1 PWS 27 AUG 2025 R1.pdf | ||
| Amendment 01.pdf | ||
| Conformed Copy.pdf | ||
| Atch 4 Hazmat Authorization Request.pdf | ||
| Atch 2c SPRS Registration.pdf | ||
| Atch 2 MFR CUI Receipt.pdf | ||
| Atch 3 AF 66 Submittal Register.pdf | ||
| Atch 2b NIST SP800-171 Entry Guide.pdf | ||
| Atch 2a NIST SP 800-171 Assessment.pdf | ||
| Solicitation - FA461325R0009.pdf | ||
| Atch 6 Cost Breakdown Sheet.xlsx | XLSX spreadsheet | |
| Atch 5 Combined Wage Determinations.pdf | ||
| Atch 1 PWS 06 AUG 2025.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Costs Breakdown | ||||||
| MAF Areas to be Cleaned | Description: | **Square Footage verified with drawings. | Unit Price | Total for 1 MAF | Total for 15 MAFs | |
| Flooring | Rubber Tile and Tile: See drawings and PWS Sections 2 and 4 for areas without carpet to be cleaned. 110a, 110, 106, 125, 109, 100, 102, 101, 129 , 130, 104, 103, 111, 123, 124. | 3655 sq ft | $ - 0 | $ - 0 | $ - 0 | Total Sq Footage is 54,825 distributed as follows: 21,795 sq ft for carpet/7155 sq ft for rubber tile/25,875 sq ft for tile). |
Ceiling Kitchen and Showers ceilings (male and female) 260 sq ft $ - 0 $ - 0 $ - 0 Total Square Footage is 3885.
Walls Rooms: See PWS Table 1 for walls to be cleaned, 100, 102, 101, 103, 104, 106, 108, 109, 110, 110A, 111, 112, 113, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 135, 129, 130 (no closets except 101 and 102). 60 sq ft $ - 0 $ - 0 $ - 0 Total Square Footage is 904.
Accessories: Bathroom/Kitchen Kitchen and Bathrooms: See PWS Table 1 and Sections 2 and 4. 1 Gallon $ - 0 $ - 0 $ - 0 Total is 15 Gallons.
Accessories: Bathroom Mirrors Mirrors: See PWS Table 1 and Sections 2 and 4. 4 Each $ - 0 $ - 0 $ - 0 Total 60 Each.
| Accessories: Fixtures (faucet, sink, urinal, etc.) | Fixtures: Include faucets, shower handles, stalls, partitions, doors, handles, toilets, urinals, sink handles. See PWS Table 1 and Sections 2 and 4. | 30 Each | $ - 0 | $ - 0 | $ - 0 | Total 450 Each. |
| $ - 0 | ||||||
| TOTAL EVALUATED PRICE | $ - 0 |
| Instruction for Contractor: |
| 1. Contractor fills out unit price in Cells C4-C9 for each area. |
| 2. Column D is the final price per area for 1 MAF. |
| 3. Column E is the final price per area for all 15 MAFs. |
| 4. Cell E11 is the total evaluated price proposal. |
| **Note that these are the verified/actual squrae footage to be cleaned per MAF (multiplied by 15 locations). Unit price should take into account productivity rate for the cleaning service (industry standards measured hourly). Note that CUI docs show distance to the MAFs. Depending on contractor's schedule/manpower, MAF locations may be cleaned in groups. |