Final 26 05 26 Grounding.pdf

PDF 49 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

-

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
Amendment8.doc DOC document
SIGN IN SHEET Oct 15 2010.doc DOC document
Question and Answers 15 Oct 2010.docx DOCX document
Seed project Honor guard room.pdf PDF
Amendment7.doc DOC document
Attachment 3 Convert Honor Guard to VTC.doc DOC document
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Amendment5.doc DOC document
Sheet 09.dwf DWF file
Sheet 17.dwf DWF file
Sheet 15.dwf DWF file
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Sheet 12.dwf DWF file
Sheet 02.dwf DWF file
Sheet 14.dwf DWF file
sitevisitattendancesheet.pdf PDF
Final 23 05 00 Basic HVAC Materials and Methods.pdf PDF
Sheet 9-9.pdf PDF
Sheet 5-Sheet 5.pdf PDF
Sheet 12-12.pdf PDF
Section 1B AF66 Master Oct 2008.xls XLS spreadsheet
Sheet 16-16.pdf PDF
Sheet 11-11.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
amendmentsolicitation.doc DOC document
Final 26 24 16 Panelboards.pdf PDF
final 07 84 13 Firestopping.pdf PDF
Final 09 51 00 Acoustical Ceilings.pdf PDF
Sheet 14-14.pdf PDF
Sheet 1-01.pdf PDF
Sheet 18-Sheet 18.pdf PDF
final 26 28 13 Fuses.pdf PDF
Final 09 21 16 Gypsum Board Assemblies.pdf PDF
Sheet 4-Sheet 4.pdf PDF
final 26 05 29 Supporting Devices.pdf PDF
Sheet 17-17.pdf PDF
final 26 51 13 Lighting Fixtures.pdf PDF
final 23 05 93 Testing Adjusting and Balancing.pdf PDF
Sheet 10-10.pdf PDF
Solicitation.doc DOC document
Ntitle.dwg DWG drawing
Rpr Wing XP.dwg DWG drawing
Attachment 5.docx DOCX document
Attachment 2.docx DOCX document
Attachment 6.docx DOCX document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT AIR FORCE BASE

(092036) 26 05 26-1 (Repair AHU O-Club, B462)

2010 by FEI

SECTION 26 05 26

GROUNDING

PART 1 - GENERAL

1.1 SUMMARY

A. Extent of grounding work is indicated by drawings, schedules and as specified herein.

B. Types of grounding specified in this section include the following:

1. Solid grounding.

C. Requirements of this section apply to electrical grounding work specified elsewhere in these specifications.

PART 2 - PRODUCTS

2.1 GROUNDING SYSTEMS

A. Materials and Components:

1. General: Except as otherwise indicated, provide electrical grounding systems indicated; with assembly of materials, including, but not limited to, cables/wires, connectors, terminals

(solderless lugs), grounding rods/electrodes, bonding jumper braid and additional accessories needed for complete installation. Where more than one type unit meets indicated requirements, selection is Installer's option. Where materials or components are not indicated, provide products complying with NEC, UL, IEEE and established industry standards for applications indicated.

B. Conductors: Provide copper electrical grounding conductors for grounding connections matching power supply wiring materials and sized according to NEC. All conduits shall contain a minimum of one (1) separate equipment grounding conductor identified and sized according to NEC.

C. Bonding Jumper Braid: Copper braided tape, constructed of 30-gage bare copper wires and properly sized for indicated applications.

D. Flexible Jumper Strap: Flexible flat conductor, 480 strands of 30-gage bare copper wire; 3/4-inch wide, 9-1/2-inches long; 48,250cm. Protect braid with copper bolt hole ends with holes sized for 3/8-inch dia.

bolts.

E. Bonding Plates, Connectors, Terminals and Clamps: Provide electrical bonding plates, connectors, terminals, lugs and clamps as recommended by bonding plate, connector, terminal and clamp manufacturers for indicated applications.

F. Ground Rods:

1. Sectional Ground Rods: Steel with copper welded exterior, 3/4-inch diameter.

G. Electrical Grounding Connection Accessories: Provide electrical insulating tape, heat-shrinkable insulating tubing, welding materials, bonding straps, as recommended by accessories manufacturers for type services indicated.

OFFUTT AIR FORCE BASE

(092036) 26 05 26-2 (Repair AHU O-Club, B462)

2010 by FEI

H. Exothermic Welded Connections: Comply with AWS Code for procedures, appearance, and quality of welds; and methods used in correcting welding work. Provide welded connections where grounding conductors connect to underground grounding rods/electrodes.

PART 3 - EXECUTION

3.1 INSPECTION

A. Installer must examine areas and conditions under which electrical grounding connections are to be made and notify Contractor in writing of conditions detrimental to proper completion of work. Do not proceed with work until unsatisfactory conditions have been corrected in a manner acceptable to

Installer.

3.2 INSTALLATION OF ELECTRICAL GROUNDING

A. General: Install electrical grounding systems where shown, in accordance with applicable portions of

NEC, with NECA's "Standard of Installation" and in accordance with recognized industry practices to ensure that products comply with requirements and serve intended functions.

B. The equipment grounding conductor shall be connected directly to the equipment grounding screw provided on receptacles.

C. At switch outlets, where self-grounding type switches are installed in metal boxes, the equipment grounding conductor shall be connected directly to the metal box.

D. Coordinate with other electrical work as necessary to interface installation of electrical grounding system with other work.

E. Weld grounding conductors to underground grounding rods/electrodes. Welds that are puffed up or that show convex surfaces indicating improper cleaning are not acceptable.

F. Install bonding jumpers with ground clamps on water meter piping to electrically bypass water meters.

G. Install clamp-on connectors only on thoroughly cleaned metal contact surfaces, to ensure electrical conductivity and circuit integrity.

3.3 FIELD QUALITY CONTROL

A. Upon completion of installation of electrical grounding systems, test ground resistance with ground resistance tester. Where tests show resistance to ground is over 5 ohms, take appropriate action to reduce resistance to 5 ohms or less, by driving additional ground rods and/or by chemically treating soil encircling ground rod; then retest to demonstrate compliance.

END OF SECTION