Attachment 3 Convert Honor Guard to VTC.doc

DOC document 49 KB Posted

Attached to
Saber Pre-solicitation notice
Solicitation number
FA4600-10-R-0006
Issued by

About this file

Attachment 3

View the file

Other files

File Type Posted
Amendment8.doc DOC document
Question and Answers 15 Oct 2010.docx DOCX document
SIGN IN SHEET Oct 15 2010.doc DOC document
Amendment7.doc DOC document
Seed project Honor guard room.pdf PDF
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 06.dwf DWF file
Sheet 03.dwf DWF file
Sheet 01.dwf DWF file
Sheet 05.dwf DWF file
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 07.dwf DWF file
amendment4.doc DOC document
Sheet 13.dwf DWF file
Sheet 11.dwf DWF file
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Sheet 12.dwf DWF file
Sheet 02.dwf DWF file
Sheet 14.dwf DWF file
Sheet 20.dwf DWF file
Sheet 18.dwf DWF file
Sheet 17.dwf DWF file
Sheet 09.dwf DWF file
Sheet 15.dwf DWF file
Question and Answers.docx DOCX document
AmendedSolicitation3.doc DOC document
Attachment_1.docx DOCX document
sitevisitattendancesheet.pdf PDF
amendedsolicitation2.doc DOC document
Final 26 05 26 Grounding.pdf PDF
final 23 00 00 General Provisions.pdf PDF
Sheet 19-Sheet 19.pdf PDF
final 23 01 30 HVAC Air-Distribution Cleaning System.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 23 07 00 HVAC Insulation.pdf PDF
final 23 09 00 Electrical Control Systems Facilities Mana.pdf PDF
Section 1A Master Copy June 2008.pdf PDF
final 22 05 00 Basic Plumbing Materials and Methods.pdf PDF
Sheet 20-Sheet 20.pdf PDF
final 26 27 26 Wiring Devices.pdf PDF
final 26 05 00 General Electrical.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives

Date: 2 Oct 2010 Project #: Seed Project

Project Title: Convert Honor Guard to VTC Provide a proposal to convert existing Honor Guard area into VTC for officer and admin staff.

Please provide items listed below for technical review.

· Statement of Work

· Estimate

· Drawings

Objectives:

1. Design VTC in area shown on drawing. VTC to be built to STC 50 standards.

2. VTC to only have access from admin/office area.

3. Construction of VTC to be from true deck to true ceiling. All penetrations to meet VTC standards.

4. Provide VTC lighting above conference area with dimmable can lighting around perimeter of room.

5. Provide all requirements to support (2) 60” flat screen TV’s on wall. Provide area for VTC controller within VTC.

6. All existing mechanical equipment to be demolished. Install new roof mounted mechanical equipment to serve office area, VTC, and Comm closet. Ensure ductwork into VTC meets security standards.

7. Provide Comm room large enough for (3) racks. (1) rack to be separated from other (2) racks by (1) meter. Provide sufficient power and cooling. Locate room logically.

8. Within office area provide Executive office, admin area, kitchenette, waiting area, and any other spaces deemed necessary.

9. Executive office to have desk for commander, wall space for flat screeen TV, and area for small side table for discussions.

10. Kitchenette to have upper and lower cabinets, area for full size refrigerator, and sufficient power. No sink or running water requirement.

11. Comm by others.

12. Provide fire sprinklers as required.

13. Furniture to be provided by others and contract has not been released. Layout all spaces using best design practices.

14. Assume no asbestos or lead present.

15. No CAD files exist on existing space and will need to be created.

General Requirements:

Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the SABER Project Manager and the Contracting Officer. The project is to be designed in accordance with the Base Design Guidelines. Work shall be completed in a neat, substantial and competent manner.

· Item 1: All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, NFPA 72 and any other applicable code requirement.

· Item 2: Maintain work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.

· Item 3: In the event of a conflict between the drawings and the Statement of Work (SOW), the SOW will take precedence.

Kelly J. Korenoski, Civ, USAF

SABER Office 55th Civil Engineer Squadron

File details come from the government source that posted it. Updated .