Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc

DOC document 49 KB Posted

Attached to
Saber Pre-solicitation notice
Solicitation number
FA4600-10-R-0006
Issued by

About this file

Attachment 3

View the file

Other files

File Type Posted
Amendment8.doc DOC document
Question and Answers 15 Oct 2010.docx DOCX document
SIGN IN SHEET Oct 15 2010.doc DOC document
Amendment7.doc DOC document
Attachment 3 Convert Honor Guard to VTC.doc DOC document
Seed project Honor guard room.pdf PDF
Amendment6.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 06.dwf DWF file
Sheet 03.dwf DWF file
Sheet 01.dwf DWF file
Sheet 05.dwf DWF file
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 07.dwf DWF file
amendment4.doc DOC document
Sheet 13.dwf DWF file
Sheet 11.dwf DWF file
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Sheet 12.dwf DWF file
Sheet 02.dwf DWF file
Sheet 14.dwf DWF file
Sheet 20.dwf DWF file
Sheet 18.dwf DWF file
Sheet 17.dwf DWF file
Sheet 09.dwf DWF file
Sheet 15.dwf DWF file
Question and Answers.docx DOCX document
AmendedSolicitation3.doc DOC document
Attachment_1.docx DOCX document
sitevisitattendancesheet.pdf PDF
amendedsolicitation2.doc DOC document
Final 26 05 26 Grounding.pdf PDF
final 23 00 00 General Provisions.pdf PDF
Sheet 19-Sheet 19.pdf PDF
final 23 01 30 HVAC Air-Distribution Cleaning System.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 23 07 00 HVAC Insulation.pdf PDF
final 23 09 00 Electrical Control Systems Facilities Mana.pdf PDF
Section 1A Master Copy June 2008.pdf PDF
final 22 05 00 Basic Plumbing Materials and Methods.pdf PDF
Sheet 20-Sheet 20.pdf PDF
final 26 27 26 Wiring Devices.pdf PDF
final 26 05 00 General Electrical.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
Show 40 more

Latest 50 of 108 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives

Date: 28 Sep 2010 Project #: Seed 10-0018

Project Title: Rpr AHU’s O-Club B462 Provide a proposal to repair AHU’s in the O-Club B462.

Please provide items listed below in Phase I and Phase II for technical review.

Phase I:

a. Detailed Statement of Work

b. List of UPB Line items (minus costs & quantities) and list of Non pre-priced items.

c. AutoCad drawings based on changes listed below.

Phase II:

a. Detailed Cost Estimate

b. Period of Performance

Objectives:

1. Drawings and specifications serve as SOO for this project with following changes listed below by sheet. Please update drawings accordingly.

2. Sheet 1 – Update Drawing index as required

3. Sheet 2 – No changes

4. Sheet 3 – Corridor between grid S7 and P11 not included in project, Kitchen area between L5 and H9 not included, Employee lounge area and Service area not included.

5. Sheet 4 – Work above grid line “G” removed from project.

6. Sheet 5 – Corridor between grid S7 and P11 not included in project, Kitchen area between L5 and H9 not included, Employee lounge area and Service area not included.

7. Sheet 6 – Detail A & B not used. Work above grid line “G” removed from project.

8. Sheet 7 – No changes

9. Sheet 8 – Ductwork shown to be demoed starting in corridor between S7 and P11 is to remain

10. Sheet 9 – New ductwork and supporting services not required between grid L5 and J10 due to ductwork not being removed as shown on Sheet 8. Note 20 at F8 to be removed. Mechanical Key Note “6” to be removed.

11. Sheet 10 – Work below grid line “F” on New Work to remain in project along with two details “B”.

12. Sheet 11, 12, and 13 – No changes

13. Sheet 14 – Detail 2 (AHU-8 and MU-1 not to be demoed), Detail 3 (MAU-1 not to be installed) Update details accordingly

14. Sheet 15 – No changes

15. Sheet 16 – MAU-1 not in design, remove from Air Handling Unit Schedule

16. Sheet 17 – Kitchen Air System Control Diagram Detail not used

17. Sheet 18 – AHU-8 not demoed at grid S8, and EF-1 and EF-2 not demoed from roof plan

18. Sheet 19 – Keynote “1” at S8, “11” at L7, and “9” at J7 removed from design. Installation of MAU-1, EF-1, and EF-2 not included in design on roof plan.

19. Sheet 20 – MAU-1, EF-1, and EF-2 removed from Panel HK General Requirements:

Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the SABER Project Manager and the Contracting Officer. The project is to be designed in accordance with the Base Design Guidelines. Work shall be completed in a neat, substantial and competent manner.

· Item 1: All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, NFPA 72 and any other applicable code requirement.

· Item 2: Maintain work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.

· Item 3: In the event of a conflict between the drawings and the Statement of Work (SOW), the SOW will take precedence. Please provide any solutions due to any conflicts within the SOO and drawings in submittal package.

Kelly J. Korenoski, Civ, USAF

SABER Office 55th Civil Engineer Squadron