Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc

DOC document 48 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
Amendment8.doc DOC document
Question and Answers 15 Oct 2010.docx DOCX document
Amendment7.doc DOC document
Attachment 3 Convert Honor Guard to VTC.doc DOC document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Sheet 12.dwf DWF file
Sheet 02.dwf DWF file
Sheet 14.dwf DWF file
Sheet 05.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 13.dwf DWF file
amendment4.doc DOC document
Question and Answers.docx DOCX document
sitevisitattendancesheet.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
amendmentsolicitation.doc DOC document
Final 26 24 16 Panelboards.pdf PDF
final 07 84 13 Firestopping.pdf PDF
Final 09 51 00 Acoustical Ceilings.pdf PDF
Sheet 14-14.pdf PDF
Sheet 1-01.pdf PDF
Sheet 18-Sheet 18.pdf PDF
final 26 28 13 Fuses.pdf PDF
Final 09 21 16 Gypsum Board Assemblies.pdf PDF
Sheet 4-Sheet 4.pdf PDF
final 26 05 29 Supporting Devices.pdf PDF
Sheet 17-17.pdf PDF
final 26 51 13 Lighting Fixtures.pdf PDF
final 23 05 93 Testing Adjusting and Balancing.pdf PDF
Sheet 10-10.pdf PDF
Performance Period.pdf PDF
final 26 05 33 Raceways.pdf PDF
final 26 05 19 Wires and Cables.pdf PDF
Sheet 2-02.pdf PDF
Final 09 91 00 Painting.pdf PDF
Sheet 3-Sheet 3.pdf PDF
final 07 92 00 Joint Sealers.pdf PDF
Final 05 50 00 Metal Fabrications.pdf PDF
Sheet 11-11.pdf PDF
final 26 05 53 Electrical Identification.pdf PDF
Final 23 38 13 Kitchen Ventilator Hood Systems.pdf PDF
Solicitation.doc DOC document
Site Visit Sign In Sheet.pdf PDF
Attachment 6.docx DOCX document
Preconstruction Conference Attachment 4.doc DOC document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives

Date: 23 Sep 2010 Project #: Seed 10-0018

Project Title: Rpr AHU’s O-Club B462 Provide a proposal to repair AHU’s in the O-Club B462.

Please provide items listed below in Phase I and Phase II for technical review.

Phase I:

a. Detailed Statement of Work

b. List of UPB Line items (minus costs & quantities) and list of Non pre-priced items.

c. AutoCad drawings based on changes listed below.

Phase II:

a. Detailed Cost Estimate

b. Period of Performance

Objectives:

1. Drawings and specifications serve as SOO for this project with following changes listed below by sheet. Please update drawings accordingly.

2. Sheet 1 – Update Drawing index as required

3. Sheet 2 – No changes

4. Sheet 3 – Corridor between grid S7 and P11 not included in project, Kitchen area between L5 and H9 not included

5. Sheet 4 – Not Used (Omit from design)

6. Sheet 5 – Corridor between grid S7 and P11 not included in project, Kitchen area between L5 and H9 not included

7. Sheet 6 – Not Used (Omit from design)

8. Sheet 7 – No changes

9. Sheet 8 – Ductwork shown to be demoed starting in corridor between S7 and P11 is to remain

10. Sheet 9 – New ductwork and supporting services not required between grid L5 and J10 due to ductwork not being removed as shown on Sheet 8. Note 20 at F8 to be removed. Mechanical Key Note “6” to be removed.

11. Sheet 10 – Not Used (Omit from design)

12. Sheet 11, 12, and 13 – No changes

13. Sheet 14 – Detail 2 (AHU-8 and MU-1 not to be demoed), Detail 3 (MAU-1 not to be installed) Update details accordingly

14. Sheet 15 – No changes

15. Sheet 16 – MAU-1 not in design, remove from Air Handling Unit Schedule

16. Sheet 17 – Kitchen Air System Control Diagram Detail not used

17. Sheet 18 – AHU-8 not demoed at grid S8, and EF-1 and EF-2 not demoed from roof plan

18. Sheet 19 – Keynote “1” at S8, “11” at L7, and “9” at J7 removed from design. Installation of MAU-1, EF-1, and EF-2 not included in design on roof plan.

19. Sheet 20 – MAU-1, EF-1, and EF-2 removed from Panel HK General Requirements:

Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the SABER Project Manager and the Contracting Officer. The project is to be designed in accordance with the Base Design Guidelines. Work shall be completed in a neat, substantial and competent manner.

· Item 1: All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, NFPA 72 and any other applicable code requirement.

· Item 2: Maintain work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members.

· Item 3: In the event of a conflict between the drawings and the Statement of Work (SOW), the SOW will take precedence.

Kelly J. Korenoski, Civ, USAF

SABER Office 55th Civil Engineer Squadron

File details come from the government source that posted it. Updated .