amendedsolicitation2.doc

DOC document 129 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Amendment FA4600-10-R-0006-0002

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
SIGN IN SHEET Oct 15 2010.doc DOC document
Seed project Honor guard room.pdf PDF
Amendment6.doc DOC document
Attachment 3 Seed SOO Rpr AHU's O-Club B462 28 Sept 2010.doc DOC document
Question and Answers 28 Sep 2010.docx DOCX document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 09.dwf DWF file
Sheet 17.dwf DWF file
Sheet 15.dwf DWF file
Sheet 05.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 13.dwf DWF file
amendment4.doc DOC document
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Question and Answers.docx DOCX document
Final 23 05 00 Basic HVAC Materials and Methods.pdf PDF
Sheet 9-9.pdf PDF
Sheet 5-Sheet 5.pdf PDF
Sheet 12-12.pdf PDF
Section 1B AF66 Master Oct 2008.xls XLS spreadsheet
Sheet 16-16.pdf PDF
Sheet 11-11.pdf PDF
Section 1C Master Copy June 2008.pdf PDF
Final 07 53 00 Elastomeric Membrane Roofing.pdf PDF
final 23 05 93 Testing Adjusting and Balancing.pdf PDF
Sheet 10-10.pdf PDF
Performance Period.pdf PDF
final 26 05 33 Raceways.pdf PDF
final 26 05 19 Wires and Cables.pdf PDF
Sheet 2-02.pdf PDF
Final 09 91 00 Painting.pdf PDF
Sheet 3-Sheet 3.pdf PDF
final 07 92 00 Joint Sealers.pdf PDF
Final 05 50 00 Metal Fabrications.pdf PDF
Sheet 11-11.pdf PDF
final 26 05 53 Electrical Identification.pdf PDF
Final 23 38 13 Kitchen Ventilator Hood Systems.pdf PDF
final 23 07 00 HVAC Insulation.pdf PDF
final 23 00 00 General Provisions.pdf PDF
Ntitle.dwg DWG drawing
Rpr Wing XP.dwg DWG drawing
SITE PLAN.dwg DWG drawing
Site Visit Sign In Sheet.pdf PDF
Attachment 5.docx DOCX document
Attachment 2.docx DOCX document
Preconstruction Conference Attachment 4.doc DOC document
Attachment 1.docx DOCX document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION F - DELIVERIES OR PERFORMANCE

The following have been added by full text:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date specified on each individual Task Order. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $184.76 for the first day and $143.35 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (JUN 2002)

(a) The contractor shall obtain base identification and vehicle passes for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and a valid vehicle insurance certificate to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management, as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

(End of clause)

The following have been deleted:

52.211-10
Commencement, Prosecution, and Completion of Work
APR 1984
52.211-12
Liquidated Damages--Construction
SEP 2000
5352.242-9000
CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS
JUN 2005

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005

The following have been deleted:

52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUL 2010
52.209-8
Updates of Information Regarding Responsibility Matters
APR 2010
52.215-11
Price Reduction for Defective Cost or Pricing Data--Modifications
OCT 1997
52.215-13
Subcontractor Cost or Pricing Data--Modifications
OCT 1997
52.215-14
Integrity of Unit Prices
OCT 1997
52.215-17
Waiver of Facilities Capital Cost of Money
OCT 1997
52.215-21
Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data--Modifications
OCT 1997
52.215-23
Limitations on Pass-Through Charges
OCT 2009
52.219-4
Notice of Price Evaluation Preference for HUBZone Small Business Concerns
JUL 2005
52.219-8 (DEV)
Utilization of Small Business Concerns (DEVIATION)
MAY 2004
52.219-9 (Dev)
Small Business Subcontracting Plan (Deviation)
APR 2008
52.219-25 (DEV)
Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting (DEVIATION)
APR 2008
52.223-16 Alt I
IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 200&0 Alternate I
DEC 2007
52.226-1
Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.232-9
Limitation On Withholding Of Payments
APR 1984
52.232-18
Availability Of Funds
APR 1984
52.232-23 Alt I
Assignment of Claims (Jan 1986) - Alternate I
APR 1984
52.232-25
Prompt Payment
OCT 2008
52.244-5
Competition In Subcontracting
DEC 1996
52.248-1
Value Engineering
FEB 2000
52.249-1
Termination For Convenience Of The Government (Fixed Price) (Short Form)
APR 1984
252.204-7006
Billing Instructions
OCT 2005
252.215-7000
Pricing Adjustments
DEC 1991
252.219-7003 (Dev) Alt I
Small Business Subcontracting Plan (DoD Contracts) (Deviation) Alternate I
APR 2007
252.225-7002
Qualifying Country Sources As Subcontractors
APR 2003
252.225-7004
Report of Intended Performance Outside the United States and Canada--Submission after Award
MAY 2007
252.225-7006
Quarterly Reporting of Actual Contract Performance Outside the United States
MAY 2007
252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005
252.232-7001
Disposition Of Payment
DEC 1991
252.233-7001
Choice of Law (Overseas)
JUN 1997
252.239-7001
Information Assurance Contractor Training and Certification
JAN 2008
252.242-7004
Material Management And Accounting System
JUL 2009
252.244-7000
Subcontracts for Commercial Items and Commercial Components (DoD Contracts)
AUG 2009
252.247-7023
Transportation of Supplies by Sea
MAY 2002
5352.223-9001
HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS
JUN 1997

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

The following have been deleted:

52.204-5
Women-Owned Business (Other Than Small Business)
MAY 1999
52.209-2
Prohibition on Contracting with Inverted Domestic Corporations--Representation
JUL 2009
52.215-22
Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.219-1 Alt I
Small Business Program Representations (May 2004) Alternate I
APR 2002
52.219-22
Small Disadvantaged Business Status
OCT 1999
52.222-25
Affirmative Action Compliance
APR 1984
52.225-18
Place of Manufacture
SEP 2006
52.230-1
Cost Accounting Standards Notices And Certification
OCT 2008
252.204-7007 Alt A
Annual Representations and Certifications Alternate A
MAY 2010
252.225-7003
Report of Intended Performance Outside the United States and Canada--Submission with Offer
DEC 2006

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

ADDITIONAL INFORMATION

L-1
CEILING OF CONSTRUCTION CONTRACT:

The ceiling amount of the contract is: $45,000,000.

L-2
Preparation of Proposals:

General Instructions: This section of the RFP provides general guidance for preparing proposals as well as specific instructions on the format of the proposal. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. The Offeror's proposal must include all data and information requested in the RFP.

Only the required minimum amount of information is requested to provide for proper evaluation. Efforts should be made to keep offers as brief as possible, concentrating on substantive information essential for proper evaluation. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating its validity. Elaborate format and color representations are not desirable.

Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

Who May Submit: Proposals may be submitted by Small Business Administration Certified 8(a) firms. TEAMING ARRANGEMENTS WILL NOT BE CONSIDERED. ONLY LEGALLY BINDING JOINT VENTURES, AS APPROVED BY THE SMALL BUSINESS ADMINISTRATION, WILL BE CONSIDERED.

Any legally organized offeror may submit a proposal, provided that the offeror, or offeror’s subcontractor, has on its permanent staff professional architects and engineers registered in the appropriate technical disciplines and provided that the requirements specified in the solicitation are met. All designs must be accomplished under the direct supervision of appropriately licensed professionals.

JOINT VENTURE AGREEMENTS – Joint Ventures are allowable on competitive 8(a) set-asides, however, the joint venture agreement must be received by SBA prior to proposal due date and approved before award of any resulting contract. If you are contemplating a joint venture on this project, you must advise your assigned SBA Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when your BOS has adequate time for a thorough review before the proposal due date. NO CORRECTIONS AND/OR CHANGES ARE ALLOWED AFTER TIME OF SUBMISSION OF PROPOSAL OR BIDS.

Preparation Instructions: Proposals shall be prepared in three volumes: Volume I – Technical Proposal, Volume II – Past Performance Information, and Volume III – Price Proposal. Specific guidance regarding content of these volumes is discussed below.

(1) Construction: Each volume shall not require extensive searching throughout the document(s) to locate and evaluate any items or area. Sub-categories of information in each of the volumes should be highlighted for ease of evaluating the information contained therein. All written information and data shall be in an 8 ½” x 11” format. 11” x 17” sheets will be allowed for charts and tables. Only written proposals will be accepted. Oral, electronic, and/or facsimile proposals will not be accepted.

(2) Cover Sheet: A cover sheet identifying the offeror and the project shall be provided. NOTE: THIS IS THE ONLY PLACE THAT SHALL HAVE ANY IDENTIFYING FACTOR OF THE OFFEROR’S COMPANY AND/OR LOGO. NO OTHER PAGE SHALL CONTAIN THIS INFORMATION.

(3) Binding: All volumes shall be submitted in three pronged folders. Each binder shall contain: Table of Contents, List of Tables or Figures (if required), and List of Appendices.

(4) Text: Text shall be single spaced and printed black on white paper (black and white requirement does not apply to graphics, photos, etc.). Font size shall not be less than 12 point. Each page shall be identified with the appropriate page number centered at the bottom of the page.

Firms submitting proposals shall limit submission to data essential for evaluation of proposals so that a minimum of time and monies are expended in preparing information required by the RFP. Data submitted must reflect the designer’s interpretation of criteria contained in the RFP. Unnecessarily elaborate or voluminous brochures or other presentations, beyond those sufficient to present a complete and effective response, are not desired. Elaborate artwork, expensive paper and bindings, and expensive/extensive visual and other presentation aids are unnecessary.

Technical proposals will be evaluated for conformance with the minimum RFP criteria. While the intent is to keep the pre-award design effort to a minimum, proposals must provide adequate detail for effective evaluation. It must also form sufficient basis for a fair and reasonable price proposal.

Restrictions: Incomplete proposals – failure to submit all the data indicated in this section will be cause for determining a proposal incomplete and, therefore, not considered for further technical evaluation or for subsequent award.

Proposal Submission

Mailing Requirement for Special Marking of Proposal Data: Envelopes or other cover for material submitted in response to this RFP shall be opaque, and must be so presented that they may easily be identified. At a minimum, the outside cover must show:

Destination of Proposal

Name and location of project as described in the RFP documents

Solicitation number

Name and address of Offeror

Volume Number

Mail or deliver the proposal to the address listed in the solicitation.

The proposal submitted shall include an original and copies as indicated in the table below. Each proposal shall be marked to clearly identify the original and the copies. The copies shall be numbered (i.e. 1 of 6, 2 of 6, etc.).

VOL
TITLE
PAPER COPIES
CD COPIES
I
TECHNICAL AND MANAGEMENT
3
1

II

PAST PERFORMANCE
3
1

III

PRICE PROPOSAL
3
1
L-3
preparation of technical PROPOSAL (volume i):

Section 1 - Introduction and Summary.

The Government will not evaluate this introductory section which is limited to three pages. This section is not included in the page limit for the Technical Proposal Volume. It should contain, in no more than three pages, a concise summary of your proposed approach to the SABER effort.

Section 2.

Project Execution and Technical Capability. This section will address the offeror's technical staff and ability to complete projects under the contract. The Government will evaluate two demonstration (“seed”) projects both for technical capabilities and cost..

A. Seed Project #1: Rpr AHU O-Club Building 462 (see attachment 3), this project WILL NOT be awarded as a contract. It will be for evaluation of technical capabilities only.

B. Seed Project #2: Contract pre-performance conference (see attachment 4), has been identified for award under the SABER program for a demonstration of technical capability at the time of contract award.

The specific project description will be provided to each offeror to propose a design concept, design analysis with calculations, list of assumptions, list of priced items from the price guide, and an overall proposal of project execution. The Statement of Objectives (SOO) and drawings are all included with each project in Attachments 3 and 4. This proposal shall be evaluated in terms of completeness and reasonableness based on the Means Pricing Guide/Coefficients/Quantities. This proposal shall be evaluated during the source selection process. The Government may consider the following elements under this area in evaluating the proposals for the demonstration project:

TECHNICAL EVALUATION FACTORS:

Project Execution and Technical Capability

1) Key Technical Support Staff

The standard is met when the proposal:

a. Indicates the support staff dedicated for this contract on-site and/or at the home office.

1. Minimum functions must include clerical, inspection (quality control), drafting, technical design/planning staff personnel.

b. Indicates availability of design capability (A/E support) if design is to be performed by other than in-house resources.

1. List of A/E firms must indicate capability to perform civil, mechanical, and electrical work to the degree required under this contract.

2. List of registered Professional Engineers must show capability and availability of these persons/firms consistent with the type of work required under this contract.

2) Level of Overall Effort in the Execution of the Demonstration Project

The standard is met when the proposal:

a. Shows that the appropriate engineer (discipline and skill level) was consulted on the project (paving engineer for paving projects, electrical technician on electrical work, etc.);

b. Provides drawing details showing all aspects of the work to be executed with a description of materials to be used and all proper dimensions shown;

c. Provides calculations to support the proposal for the project (asphalt depth on paving projects; structural capabilities and lighting levels as required; etc.);

d. Shows the request for existing drawings and/or a site visit has been made; and

e. Proposal includes all necessary disciplines (pavements and markings for resurfacing projects; structural engineering, sheet metal, protective coating, electrical, floor covering, etc., for other projects, as appropriate).

3) Cost Effectiveness of Decisions/Assumptions

The standard is met when the proposal:

a. Provides comparisons on cost of various materials/alternatives;

b. Provides maintainability considerations in the comparisons (floor carpeting vs. tile, glass vs. Plexiglas, concrete vs. asphalt, paint vs. tape, etc.); and

c. Provides initial cost and life cycle cost considerations.

4) Completeness of Priced Listings

The standard is met when the proposal:

a. Provides at least 95 percent of all price listed items contained in the Government estimate;

b. Provides reasons for significant or unusual differences due to Government oversight or a better offeror's proposal;

c. Provides the listing in the format provided in the sample project; and

d. Provides a listing that is clearly followed and flows in a logical order; the listing should group similar types of work, such as grouping all pavement work together.

L-4
Preparation of Past Performance (Volume iI):

When addressing past performance evaluation criteria set forth in Section M of the solicitation, the Offeror shall provide, at a minimum, a list of their past performance data from Federal, State and Local Government and private industry contracts from the past three (3) years from the posting date; not to exceed the 10 most relevant projects from the RFP date. All the items identified below shall be addressed in the listing. Elaborate listings and extensive comments are not required or requested. This volume shall be limited to the length of Attachment #6, Past Performance Questionnaire, plus a maximum of two pages for any additional comments.

(1) Contract number, type;

(2) Whether the offeror performed as the prime or a subcontractor;

(3) Name of contracting office and verified name, address, phone/fax number of point(s) of contact

(4) Project Title and/or brief description of construction project.

(5) Initial price and final or current price, Contract start date, scheduled completion date, and current or final completion date.

(6) Percent complete as of the date of submission of the proposal; and

(7) Brief comments, if desired.

Should Offerors wish to provide information on problems encountered on the identified contracts and their corrective actions in accordance with FAR 15.305(2), they shall submit such information at the same time references are submitted.

On the above list, the Offeror shall identify recent and relevant past performance consisting of multi-discipline construction projects of varying complexity, each exceeding $50,000.00, performed within the past three (3) years. No more than the 10 most relevant of these projects within the past three (3) years will be considered. Uncompleted projects with work-in-progress may be included. Relevant projects shall be defined as contract performance consisting of multi-discipline construction projects, each exceeding $50,000, including a broad range of maintenance, repair, alteration or new construction of real property showing the capability to perform and manage a wide scope of construction trades including, but not limited to, carpentry, road repair, roofing, excavation, interior and exterior electrical, steam fitting, plumbing, sheet metal, painting, demolition, concrete masonry, and welding. Recency refers to projects that have taken place within the last three (3) years. In selecting the references, Offerors should consider the recency and relevancy of the past performance information to the work required under this solicitation.

The Offeror shall then email Attachment #4, Past Performance Questionnaire, to those agencies/firms responsible for the solicitation and administration of those identified projects. Prior to forwarding the questionnaire to each reference, the Offeror shall complete Section A, Contractor Information, on the questionnaire. Your references shall complete the questionnaire and email it to 1Lt Jacob Kriegbaum at jacob.kriegbaum@offutt.af.mil. Offerors are responsible to ensure that their reference sources receive, complete, and return the questionnaires on time. The evaluation may take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontract work where your firm performed major or critical aspects of the requirement when such information is relevant to the instant acquisition. However, the proposal should clearly define who accomplished the work if performed by other than the prospective contractor (e.g., a key personnel) and define the role (e.g., prime contractor, subcontractor, subtier subcontractor, etc.) performed by the Offeror. The government shall consider the information provided from the Offeror and may well consider any other source when evaluating the Offeror’s past performance.

In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror will not be evaluated favorably or unfavorably on past performance.

L-5
Preparation of Price Proposal (Volume IiI):

The evaluation of price will be based primarily on each offeror's proposed coefficient(s). Financial data will be requested to support the proposed coefficient(s) and to assess the offeror's understanding and ability to meet financial requirements such as bonding and plan for covering initial cash flow deficits. The Government does not envision the need for a formal DCAA audit or field pricing assistance, as a significant amount of the total price to the Government will be a commonly-directed amount through the application of the price book. Price will be evaluated by the Contract Team in terms of completeness and reasonableness. The evaluation in this area will be geared towards determining the offeror's overall understanding of the program and adequate coverage of operating expenses and bonding.

The price proposal must set forth all pricing information necessary to provide a meaningful basis for the Government's analysis and evaluation of price as set forth in Section M of this solicitation. The Offeror is requested to provide prices/costs in accordance with the Price Schedule, Section B. The Government IS NOT requesting certified cost or pricing information. While price will not be rated and color-coded, price will be evaluated in terms of completeness and reasonableness. Volume III shall contain the following:

1.

Section A. Complete in its entirety the "Offeror" portion of the Standard Form 1442

(Page 2 of this solicitation, blocks 14, 15, 17, 19, 20A, 20B, 20C, and 30). An official having the authority to bind your company contractually must sign and date the SF 1442. One copy of the SF 1442 must bear an original, authorized signature.

2.

Section B. Offerors shall insert the prices/costs for all Contract Line Item Numbers (CLINS). The Government reserves the right to request additional pricing information after receipt and evaluation of proposals.

3.

Section K. Complete ALL required certifications and representations (Note: be sure to sign and date where required.)

4.

Amendments. Any amendments to the solicitation shall be acknowledged in Block 19 of the SF1442 or by returning a signed copy of the amendment(s) SF 30 with the proposal.

NOTE: The prices submitted for the seed projects will be evaluated under the technical proposal in terms of the completeness of priced listings.

If a Joint Venture is contemplated, provide complete information on each firm.

L-6
Sequence of Events During Proposal Evaluation:

Review of Proposals: Upon receipt of proposals in response to the RFP, all volumes will be reviewed for completeness and compliance with the solicitation requirements. The Technical Proposal Volume will be evaluated and determined to be acceptable or unacceptable. The Past Performance Volume will receive a detailed evaluation employing the criteria as identified in Section M. The Price Volume will be evaluated to establish completeness and reasonableness in accordance with FAR 15.404-1(b).

Communications/Exchanges: If required, communications will be conducted with Offerors after receipt of proposals IAW FAR 15.306.

Competitive Range Determination: IAW FAR 52.215-1(f)(4) the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as defined in FAR 15.306(a)). Therefore, the Offeror's initial proposal should contain their best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Evaluation Notices (ENs) are inquiries which may be issued to Offerors to better understand their proposals, or to notify Offerors about deficient aspects of their proposals. ENs issued prior to competitive range determination are for the purpose of enhancing Government understanding of proposals without revisions to those proposals. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Discussions: The objective of discussions is “to maximize the Government’s ability to obtain best value, based on the requirement and the evaluation factors set forth in the solicitation”(See FAR 15.306(d)(2)). If discussions are necessary due to perceived weaknesses or other issues that must be addressed before award, they will be conducted with only those Offerors determined to be within the competitive range. Discussions may be conducted either orally or in writing. ENs will be issued for those areas of a proposal which are considered deficient, where weaknesses exist which are significant enough to affect the selection decision, and/or where data presented by the Offeror is unclear. Offerors shall respond to all ENs during the discussion process IAW guidance provided by the Contracting Officer.

Final Proposed Revision (FPR): If held, once discussions have been concluded all Offerors will be provided an opportunity to submit a FPR. It is the Government’s intent to have a full understanding of the Offeror’s proposal, including any revisions and answers submitted by Offerors, prior to requesting FPRs. In the event any adjustment to price becomes necessary in a FPR to reflect changes resulting from discussions, a complete, traceable audit trail shall be provided to show how the changes took place. Evaluation of FPRs will be conducted, and the final decision of award will be made by the Contracting Officer. THE GOVERNMENT DOES, HOWEVER, RESERVE THE RIGHT TO MAKE AWARD WITHOUT DISCUSSIONS; THEREFORE, THE OFFEROR SHOULD PROPOSE THE BEST OFFER INITIALLY.

L-7
Debriefing of Offerors:

Debriefings are conducted with the goal of identifying to unsuccessful Offerors where changes can be made to improve future source selection participation. Successful or unsuccessful Offerors may request debriefings by providing a written request to the Contracting Officer. Debriefings shall be conducted in accordance with FAR 15.505 for pre-award debriefings, and FAR 15.506 for post-award debriefings of Offerors.

L-8
Disposition of Unsuccessful Proposals:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government shall destroy extra copies of such unsuccessful proposals. No destruction certificate will be provided.

YOUR OFFER MAY BE DETERMINED UNACCEPTABLE IF YOUR PROPOSAL IS INCOMPLETE.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

13 Sept 10 at 09:00 AM CDT

(c) Participants will meet at--

Bellevue Welcome Center

1600 Hwy 370

Bellevue, NE 68005

(End of provision)

5352.215-9001 NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE (MAY 1996)

(a) A Pre-Proposal Conference/Site Visit will be held at 09:00 AM CDT, on Monday 13 Sep 2010. The initial meeting will occur at the Bellevue Visitor Center for those who require base passes. The contract manager, 1Lt Jacob Kriegbaum, can be contacted at 402-232-1456. Individual and vehicle passes will be issued to contractors that need them and we will then proceed to the SAC gate. After a short meeting in the conference room, we will proceed to the work site of the seed projects. The objective is to provide all offerors an opportunity to ascertain the nature and location of the work, and to become acquainted with the solicitation requirements. A complete record of the conference shall be made by detailed notes.

(b) Your attendance at the Pre-Proposal Conference is highly encouraged. Offerors who wish to attend are requested to complete the Pre-Proposal Conference Reservation Form and return it to 1Lt Jacob Kriegbaum no later than 2:00 PM CDT 10 Sep 2010. You may submit the form via fax to (402) 294-7280. Alternatively you scan and email the form to Lt Kriegbaum at jacob.kriegbaum@offutt.af.mil.

(c) Questions pertaining to the solicitation which offerors wish the Government to address during the pre-proposal conference shall be submitted in writing to the 55th Contracting Squadron, by 2:00 PM CDT 9 Sep 2010. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

(d) A record of the conference shall be made and furnished to all prospective bidders/offerors. The record should include minutes of the meeting, including questions (on a non-attribution basis) and answers.

(e) Accommodations while in Bellevue, NE shall be the sole responsibility of the offeror.

The following have been deleted:

52.214-34
Submission Of Offers In The English Language
APR 1991
52.214-35
Submission Of Offers In U.S. Currency
APR 1991
52.215-20
Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data
OCT 1997
52.222-24
Preaward On-Site Equal Opportunity Compliance Evaluation
FEB 1999
52.232-13
Notice Of Progress Payments
APR 1984
52.232-28
Invitation to Propose Performance-Based Payments
MAR 2000
52.236-27
Site Visit (Construction)
FEB 1995

(End of Summary of Changes)