final 23 05 93 Testing Adjusting and Balancing.pdf

PDF 66 KB Posted

Attached to
Saber Pre-solicitation notice Federal contract opportunity
Solicitation number
FA4600-10-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

-

View the file

Other files for this federal contract opportunity

Other files attached to Saber Pre-solicitation notice, newest first.
File Type Posted
Amendment8.doc DOC document
Question and Answers 15 Oct 2010.docx DOCX document
Amendment7.doc DOC document
Attachment 3 Convert Honor Guard to VTC.doc DOC document
Amendment5.doc DOC document
Question and Answers 24 Sep 2010.docx DOCX document
Sheet 04.dwf DWF file
Sheet 19.dwf DWF file
Sheet 12.dwf DWF file
Sheet 02.dwf DWF file
Sheet 14.dwf DWF file
Sheet 05.dwf DWF file
Sheet 08.dwf DWF file
Sheet 16.dwf DWF file
Sheet 10.dwf DWF file
Sheet 13.dwf DWF file
amendment4.doc DOC document
Attachment 3 Rpr AHU's O-Club B462 Sept 2010.doc DOC document
Question and Answers.docx DOCX document
sitevisitattendancesheet.pdf PDF
final 23 73 13 edit Air Handlers1.pdf PDF
amendmentsolicitation.doc DOC document
Final 26 24 16 Panelboards.pdf PDF
final 07 84 13 Firestopping.pdf PDF
Final 09 51 00 Acoustical Ceilings.pdf PDF
Sheet 14-14.pdf PDF
Sheet 1-01.pdf PDF
Sheet 18-Sheet 18.pdf PDF
final 26 28 13 Fuses.pdf PDF
Final 09 21 16 Gypsum Board Assemblies.pdf PDF
Sheet 4-Sheet 4.pdf PDF
final 26 05 29 Supporting Devices.pdf PDF
Sheet 17-17.pdf PDF
final 26 51 13 Lighting Fixtures.pdf PDF
Sheet 10-10.pdf PDF
Performance Period.pdf PDF
final 26 05 33 Raceways.pdf PDF
final 26 05 19 Wires and Cables.pdf PDF
Sheet 2-02.pdf PDF
Final 09 91 00 Painting.pdf PDF
Sheet 3-Sheet 3.pdf PDF
final 07 92 00 Joint Sealers.pdf PDF
Final 05 50 00 Metal Fabrications.pdf PDF
Sheet 11-11.pdf PDF
final 26 05 53 Electrical Identification.pdf PDF
Final 23 38 13 Kitchen Ventilator Hood Systems.pdf PDF
Solicitation.doc DOC document
Site Visit Sign In Sheet.pdf PDF
Attachment 6.docx DOCX document
Preconstruction Conference Attachment 4.doc DOC document
Show all 50

Saber Pre-solicitation notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFUTT AIR FORCE BASE

(092036) 23 05 93-1 (Repair AHU O-Club, B462)

2010 by FEI

SECTION 23 05 93

TESTING, ADJUSTING AND BALANCING

PART 1 - GENERAL

1.1 WORK INCLUDED

A. Extent of testing, adjusting and balancing work required by this section is indicated on drawings and schedules, and by requirements of this section; and is defined to include, but is not necessarily limited to, air distribution systems, hydronic distribution systems, and associated equipment and apparatus of mechanical work. The work consists of setting speed and volume (flow) adjusting facilities provided for systems, recording data, conducting tests, preparing and submitting reports, and recommending modifications to work as required by Contract Documents.

B. Component types of testing, adjusting and balancing specified in this section includes the following as applied to mechanical equipment:

1. Air Distribution Systems:

a. Fans.

b. Diffuser, registers and grilles.

c. Air handling units.

2. Hydronic Systems:

a. Coils.

b. Piping systems.

1.2 QUALITY ASSURANCE

A. Tester's Qualifications: Firm certified by National Environmental Balancing Bureau (NEBB) in those testing and balancing disciplines similar to those required for this Project and may also be the original

Installer of system to be tested.

B. Codes and Standards:

1. NEBB Compliance: Comply with NEBB's "Procedural Standards for Testing, Adjusting, and

Balancing of Environmental Systems" as applicable to mechanical air hydronic distribution systems and associated equipment and apparatus.

2. Industry Standards: Comply with ASHRAE recommendations pertaining to measurements, instruments, and testing, adjusting and balancing, except as otherwise indicated.

1.3 SUBMITTALS

A. Submit certified test reports signed by Test and Balance Supervisor who performed TAB work. In addition, have report certified by Professional Engineer who is familiar with TAB work and also with

Project, and who is registered in jurisdiction where testing is being conducted.

B. Include identification and types of instruments used, and their most recent calibration date with submission of final test report.

(092036) 23 05 93-2 (Repair AHU O-Club, B462)

C. Submit biographical data on Engineer who is to directly supervise testing, adjusting and balancing work.

D. Maintenance Data: Include in maintenance manuals, copies of certified test reports, identification of instruments and data on Engineer.

1.4 JOB CONDITIONS

A. Do not proceed with testing, adjusting, and balancing work until work has been completed and is operable. Ensure that there is not latent residual work still to be completed.

B. Do not proceed until work scheduled for testing, adjusting, and balancing is clean and free from debris, dirt and discarded building materials.

PART 2 - PRODUCTS

2.1 ACCEPTABLE VENDORS

A. Vendors: Subject to compliance with requirements, provide testing, adjusting and balancing work by one (1) of the following:

1. Air & Fluid Management, Wilbur, NE.

2. Balcon, Omaha, NE.

3. Systems Management and Balancing, Inc., Omaha, NE.

4. Waldinger, Omaha, NE.

2.2 PATCHING MATERIALS

A. Except as otherwise indicated, use same products as used by original Installer for patching holes in insulation, ductwork and housings which have been cut or drilled for test purposes, including access for test instruments, attaching jigs and similar purposes.

1. At Tester's option, plastic plugs with retainers may be used to patch drilled holes in ductwork and housings.

2.3 TEST INSTRUMENTS

A. Utilize test instruments and equipment for TAB work required, of type, precision, and capacity as recommended in the following TAB Standards:

1. NEBB's Procedural Standards for Testing, Adjusting, and Balancing of Environmental

Systems.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine installed work and conditions under which testing is to be done to ensure that work has been completed, cleaned and is operable. Do not proceed with TAB work until unsatisfactory conditions have been corrected in a manner acceptable to Tester.

(092036) 23 05 93-3 (Repair AHU O-Club, B462)

3.2 AIR SYSTEM TESTING, ADJUSTING AND BALANCING

A. Test, adjust and balance environmental systems and components, as indicated, in accordance with procedures outlined in applicable standards, with the following minimum requirements.

B. Make the following test, adjustments and recordings:

1. Test and adjust supply and return fans. Adjust rotation and RPM to design requirements.

2. Test and record terminal voltages after above adjustments.

3. Test and record fan motor full load amperes after above adjustments.

4. Make Pitot Tube Traverse at main supply and return ducts. Obtain design CFM at fans.

5. Test and adjust system static pressures; suction and discharge.

6. Test and adjust each diffuser, grille, and register to within 10% of design requirements. Adjust to minimize drafts in all areas. Readings and tests shall include required FPM velocity and test resultant FPM velocity, required CFM and test resultant CFM after adjustments.

7. Adjust automatically operated dampers to operate as specified, indicated, and/or noted. The testing agency shall check controls for proper calibrations and list the controls requiring adjustments by Control Installers.

8. Change dampers or add dampers as required for correct balance, as recommended by the Air

Balancing Agency, at no additional cost to the Owner.

3.3 WATER SYSTEM TESTING, ADJUSTING AND BALANCING

A. Test, adjust and balance environmental systems and components, as indicated, in accordance with procedures outlined in applicable standards, with the following minimum requirements.

B. Preliminary checks, settings and adjustments shall be as follows:

1. Check pump rotation.

2. Check expansion tanks to determine that they are not air bound and the system is completely full of water.

3. Check air vents at high points of water systems and determine that all are installed and operating freely.

C. Phase I - Water systems testing and balancing procedures shall be as follows:

1. Set hot water pumps to the proper gallon per minute delivery.

2. Proceed to balance each radiation zone and hot water coil.

3. Mark settings on valves and record data upon the completion of flow readings and adjustments at coils.

(092036) 23 05 93-4 (Repair AHU O-Club, B462)

D. Phase II - Water systems testing and balancing procedures shall be as follows:

1. Recheck settings at the pumps and re-adjust, if required, after adjustments are made to each radiation zone and coil.

2. Check and record the following items at each cooling and heating element:

a. Inlet water temperatures.

b. Leaving water temperatures.

c. Pressure drop of each coil.

d. GPM at each pump, coil, and radiation zone.

e. Pump operating suction and discharge pressure and final total dynamic head.

f. List mechanical specifications of pumps.

g. Rated and actual running amperage of pump motor.

h. Check control valves for operation from full open to full closed.

3.4 SEASONAL CONSIDERATIONS

A. Test, adjust and balance system during summer season for air conditioning systems and during winter season for heating systems, including at least period of operation at outside conditions within 5 o F wet bulb temperature of maximum summer design condition, and within 10 o F dry bulb temperature of minimum winter design condition. When seasonal operation does not permit measuring final temperatures, then take final temperature readings when seasonal operation does permit.

3.5 CLOSEOUT PROCEDURES

A. Prepare report of test results, including instrumentation calibration reports, in format recommended by applicable standards.

B. Patch holes in insulation, ductwork and housings, which have been cut or drilled for test purposes, in a manner recommended by original Installer.

C. Mark equipment settings, including damper control positions, valve indicators, fan speed control levers and similar controls and devices, to show final settings at completion of TAB work. Provide markings with paint or other suitable permanent identification materials.

D. Prepare a report of recommendations for correcting unsatisfactory mechanical performances when system cannot be successfully balanced; including, where necessary, modifications which exceed requirements of Contract Documents for mechanical work.

E. Retest, adjust and balance systems subsequent to significant system modifications and resubmit test results.