This is an Official Solicitation Q&A Document for Solicitation FA452826R0001, the Minot AFB Flooring MACC FY26 contract. The document addresses three key clarifications regarding the solicitation requirements.

The first clarification confirms that Amendment 0006 incorporates a revised Statement of Work that corrects all broken cross-references that resulted from the restructuring of the SOW in Amendment 0004 from the original paragraph numbering (4.2.1 and 4.2.3–4.2.6) to a new section structure (Sections 1.0–5.0). The second clarification specifies that the Mock Seed Project's baseboard requirements are limited to a single line item of 413 linear feet of new 4-inch rubber cove base installation, with no additional vinyl, rubber, or wood baseboard work required. The third clarification addresses compliance with domestic manufacturing requirements by removing a specific product reference (1058 Fable LVP for Building 475 hallway) that was manufactured outside the United States and replacing it with generic product specifications to align with federal procurement guidelines.

View the file

Other files

File Type Posted
Solicitation Amendment FA452826R00010006 SF 30.pdf PDF
Attachment 1 - Flooring MACC Statement of Work (SOW) (Amendment 0006 - 19 Aug 2026).docx DOCX document
Attachment 9 - Pricing Schedule (Amendment 0006 - 19 Aug 2026).xlsx XLSX spreadsheet
Attachment 2 - Mock Seed Project SOW (Amendment 0006 - 19 Aug 2026).docx DOCX document
Solicitation Amendment FA452826R00010005 SF 30.pdf PDF
Attachment 2 - Mock Seed Project SOW (Amendment 0004 - 20 July 2026).pdf PDF
Attachment 9 - Pricing Schedule (Amendment 0004 - 20 July 2026).xlsx XLSX spreadsheet
Solicitation Amendment FA452826R00010004 SF 30.pdf PDF
Solicitation_QA_FA452826R0001 (Amendment 0004 - 20 July 2026).pdf PDF
Solicitation Amendment FA452826R00010003 SF 30.pdf PDF
Solicitation Amendment FA452826R00010002 SF 30.pdf PDF
Attachment 1 - Flooring MACC Statement of Work (SOW) (Amendment 0002 - 10 Jun 26).pdf PDF
Attachment 3 - Flooring IDIQ MACC Ordering Guide (Amendment 0002 - 10 Jun 26).pdf PDF
Solicitation Amendment FA452826R00010001 SF 30.pdf PDF
Attachment 7 - Section L - Instructions to Offerors (Amendment 0001 - 5 Jun 26).pdf PDF
Attachment 11 - Financial Responsibility Authorization Letter Template.docx DOCX document
Attachment 2 - Mock Seed Project Statement of Work (SOW) - Bldg 475.pdf PDF
Attachment 8 - Section M - Evaluation Factors.pdf PDF
Attachment 1 - Flooring MACC Statement of Work (SOW).pdf PDF
Attachment 3 - Flooring IDIQ MACC Ordering Guide.pdf PDF
Solicitation - FA452826R0001.pdf PDF
Attachment 7 - Section L - Instructions to Offerors.pdf PDF
Attachment 4 - Mock Seed Project Drawings - Bldg 475 - 5 OSS.pdf PDF
Attachment 9 - Pricing Schedule.xlsx XLSX spreadsheet
Attachment 10 - Past Performance Questionnaire (PPQ) Template.docx DOCX document
Attachment 6 - Davis-Bacon Act WD No. ND20260031 (18 May 26).pdf PDF
Attachment 5 - Mock Seed Project Drawings - Bldg 475 - 5 OG.pdf PDF
Attachment 12 - Subcontractor Consent Letter Template.docx DOCX document
Attachment 13 - Provisions and Clauses.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICIAL SOLICITATION Q&A DOCUMENT #2

Solicitation No: FA452826R0001 - Minot AFB Flooring MACC FY26

Q1: Your responses to Q22 and Q23 said the paragraph references would be corrected (to 4.2.1 and 4.2.3–4.2.6) and an updated SOW issued. The revised SOW under Amendment 0004 uses a new structure (Sections 1.0–5.0) and no longer contains those paragraph numbers. Please confirm the revised SOW fully replaces those references and that no broken cross-references remain.

Government response: Amendment 0006 incorporates a revised SOW that that fixes broken cross-references.

Q2: Please confirm the Mock Seed Project has no vinyl, rubber, or wood baseboard requirements beyond the single "INSTALL NEW COVE BASE" line item (413 LNFT) shown on the pricing tab.

Government Response: Clarified mock seed project SOW and Pricing Schedule to identify type of cove base required (New 4” Rubber Cove Base)

Q3: The revised SOW specifies "1058 Fable" LVP for the Bldg 475 hallway. This product is not manufactured in the United States.

Government Response: Removed reference to product manufactured outside of the United States and replaced with generic product specifications.