Attachment 9 - Pricing Schedule.xlsx
XLSX spreadsheet 60 KB Posted
- Attached to
- Minot AFB Flooring MACC FY26
- Solicitation number
- FA452826R0001
About this file
This is a Pricing Schedule attachment for a Multiple Award Construction Contract (MACC) indefinite-delivery, indefinite-quantity (IDIQ) solicitation for flooring services at Minot Air Force Base. The pricing schedule requires offerors to provide fully burdened unit prices (including overhead, profit, and standard installation labor) for approximately 70 line items across five pricing periods: three base years (months 1-12, 13-24, and 25-36 of FY 26), two option years (months 25-36 and 37-48), and a mock seed project for Building 475 flooring work.
The line items encompass a comprehensive range of flooring and related construction services, including removal and installation of various flooring types (carpet tile, vinyl, rubber, epoxy, floor tile), surface preparation (drywall installation and removal, skim coating, self-leveling underlayment), finishing work (paint coats, baseboard and cove base installation), and specialty services (asbestos abatement and testing, grout replacement). Pricing is requested with estimated annual quantities for government evaluation purposes to calculate a Total Evaluated Price (TEP), though these quantities do not guarantee future work. The pricing schedule explicitly requires offerors to provide unit prices for all listed items; failure to do so may render an offer non-responsive and ineligible for award. The mock seed project consists of five specific line items totaling 1,778 square feet of carpet tile installation and cove base work at an estimated 198 square yards.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Yr 1 - Months 1-12
| FY 26 FLOORING IDIQ BID SCHEDULE | ||||
| Instructions to Offerors: Provide fully burdened unit prices (including overhead, profit, and standard installation labor) for the flooring materials listed below. The "Estimated Annual Quantity" is for Government evaluation purposes only to calculate the TEP and does not constitute a guarantee of future work. The proposed unit prices will become the binding maximum ceiling rates for this specific contract year. | ||||
| Base Ordering Period (3-YEAR PERIOD) | ||||
| Description | Est. Quantity | Unit | Unit Price | Total |
| ASBESTOS ABATEMENT/REMOVAL | 3000.00 | SQFT | ||
| ADJUST WOODEN DOORS | 25.00 | EA | ||
| APPLY WALL/CEILING TEXTURE | 10000.00 | SQFT | ||
| ASBESTOS SAMPLE TESTING | 65.00 | EA | ||
| CONCRETE PATCHING | 2000.00 | SQFT | ||
| CONCRETE REPAIR | 2000.00 | SQFT | ||
| INSTALL CHAIR RAIL | 500.00 | LNFT | ||
| INSTALL CORNER GUARDS 1"X1"X36' | 10.00 | EA | ||
| INSTALL NEW 4" RUBBER COVE BASE | 1500.00 | LNFT | ||
| INSTALL 4" WOOD BASEBOARD | 500.00 | LNFT | ||
| INSTALL NEW 5/8" DRYWALL | 45000.00 | SQFT | ||
| INSTALL NEW 6" RUBBER COVE BASE | 12000.00 | LNFT | ||
| INSTALL NEW 6" WOOD BASEBOARD | 300.00 | LNFT | ||
| INSTALL NEW ADJUSTABLE METAL SLEUTER | 500.00 | LNFT | ||
| INSTALL NEW CARPET TILE | 5000.00 | SQYDS | ||
| INSTALL NEW CORNER BEAD | 1000.00 | LNFT | ||
| INSTALL NEW DOOR THRESHOLD | 1500.00 | LNFT | ||
| INSTALL NEW EPOXY FLOORING | 5000.00 | SQFT | ||
| INSTALL NEW FLOOR TILE | 6500.00 | SQFT | ||
| INSTALL NEW VINYL FLOORING | 500.00 | SQFT | ||
| INSTALL NEW RUBBER FLOORING | 1000.00 | SQFT | ||
| INSTALL NEW RUBBER RISER | 25.00 | EA | ||
| INSTALL NEW RUBBER STAIR TREADS | 25.00 | EA | ||
| INSTALL NEW RUBBER TRANSITION STRIP | 600.00 | LNFT | ||
| INSTALL NEW TILE COVE BASE | 500.00 | LNFT | ||
| INSTALL SELF LEVELING UNDERLAYMENT | 50000.00 | SQFT | ||
| PAINT - PRIMER INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - SECOND INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - FIRST INTERIOR COAT | 45000.00 | SQFT | ||
| REMOVE 5/8" DRYWALL | 45000.00 | SQFT | ||
| REMOVE AND INSTALL EXISTING CORNER GUARDS | 100.00 | EA | ||
| REMOVE EXISTING WOOD BASEBOARD | 1000.00 | LNFT | ||
| REMOVE CHAIR RAIL | 5000.00 | LNFT | ||
| REMOVE CORNER GUARDS | 500.00 | EA | ||
| REMOVE EXISTING CARPET | 6000.00 | SQYDS | ||
| REMOVE EXISTING CORNER BEAD | 1000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE | 42000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE ALL OTHERS | 100.00 | LNFT | ||
| REMOVE EXISTING DOOR THRESH HOLD | 600.00 | LNFT | ||
| REMOVE EXISTING FLOOR TILE | 6000.00 | SQFT | ||
| REMOVE EXISTING FLOORING ALL OTHERS | 500.00 | SQFT | ||
| REMOVE EXISTING RUBBER FLOORING | 250.00 | SQFT | ||
| REMOVE EXISTING STAIR TREAD RUBBER | 25.00 | EA | ||
| REMOVE EXISTING TILE COVE BASE | 400.00 | LNFT | ||
| REMOVE EXISTING VINYL FLOORING | 1000.00 | SQFT | ||
| REMOVE EXISTING WOOD BASEBOARD | 500.00 | LNFT | ||
| REMOVE TERRAZZO | 500.00 | SQFT | ||
| REMOVE VINYL WALL COVERING | 25000.00 | SQFT | ||
| REMOVE WAINSCOT | 8000.00 | SQFT | ||
| REMOVE WALLPAPER | 10000.00 | SQFT | ||
| REMOVE WOOD PANELING | 500.00 | SQFT | ||
| REPAIR 5/8" DRYWALL | 1500.00 | SQFT | ||
| REMOVE AND REPLACE GROUT IN EXISTING TILE FLOORING | 100.00 | HRLY | ||
| TRANSITION STRIPS | 36.00 | LNFT | ||
| INSTALL VINYL COVE BASE | 400.00 | LNFT | ||
| SKIM COATING | 400.00 | SQFT | ||
| Total | $0.00 | $0.00 | ||
| NOTE: Offerors must offer prices on ALL items. Failure to do so may be reason to |
consider the offer non-responsive and will not be considered for award.
Base Yr 2 - Months 13-24
| FY 26 FLOORING IDIQ BID SCHEDULE | ||||
| Instructions to Offerors: Provide fully burdened unit prices (including overhead, profit, and standard installation labor) for the flooring materials listed below. The "Estimated Annual Quantity" is for Government evaluation purposes only to calculate the TEP and does not constitute a guarantee of future work. The proposed unit prices will become the binding maximum ceiling rates for this specific contract year. | ||||
| Base Ordering Period (3-YEAR PERIOD) | ||||
| Description | Est. Quantity | Unit | Unit Price | Total |
| ASBESTOS ABATEMENT/REMOVAL | 3000.00 | SQFT | ||
| ADJUST WOODEN DOORS | 25.00 | EA | ||
| APPLY WALL/CEILING TEXTURE | 10000.00 | SQFT | ||
| ASBESTOS SAMPLE TESTING | 65.00 | EA | ||
| CONCRETE PATCHING | 2000.00 | SQFT | ||
| CONCRETE REPAIR | 2000.00 | SQFT | ||
| INSTALL CHAIR RAIL | 500.00 | LNFT | ||
| INSTALL CORNER GUARDS 1"X1"X36' | 10.00 | EA | ||
| INSTALL NEW 4" RUBBER COVE BASE | 1500.00 | LNFT | ||
| INSTALL 4" WOOD BASEBOARD | 500.00 | LNFT | ||
| INSTALL NEW 5/8" DRYWALL | 45000.00 | SQFT | ||
| INSTALL NEW 6" RUBBER COVE BASE | 12000.00 | LNFT | ||
| INSTALL NEW 6" WOOD BASEBOARD | 300.00 | LNFT | ||
| INSTALL NEW ADJUSTABLE METAL SLEUTER | 500.00 | LNFT | ||
| INSTALL NEW CARPET TILE | 5000.00 | SQYDS | ||
| INSTALL NEW CORNER BEAD | 1000.00 | LNFT | ||
| INSTALL NEW DOOR THRESHOLD | 1500.00 | LNFT | ||
| INSTALL NEW EPOXY FLOORING | 5000.00 | SQFT | ||
| INSTALL NEW FLOOR TILE | 6500.00 | SQFT | ||
| INSTALL NEW VINYL FLOORING | 500.00 | SQFT | ||
| INSTALL NEW RUBBER FLOORING | 1000.00 | SQFT | ||
| INSTALL NEW RUBBER RISER | 25.00 | EA | ||
| INSTALL NEW RUBBER STAIR TREADS | 25.00 | EA | ||
| INSTALL NEW RUBBER TRANSITION STRIP | 600.00 | LNFT | ||
| INSTALL NEW TILE COVE BASE | 500.00 | LNFT | ||
| INSTALL SELF LEVELING UNDERLAYMENT | 50000.00 | SQFT | ||
| PAINT - PRIMER INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - SECOND INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - FIRST INTERIOR COAT | 45000.00 | SQFT | ||
| REMOVE 5/8" DRYWALL | 45000.00 | SQFT | ||
| REMOVE AND INSTALL EXISTING CORNER GUARDS | 100.00 | EA | ||
| REMOVE EXISTING WOOD BASEBOARD | 1000.00 | LNFT | ||
| REMOVE CHAIR RAIL | 5000.00 | LNFT | ||
| REMOVE CORNER GUARDS | 500.00 | EA | ||
| REMOVE EXISTING CARPET | 6000.00 | SQYDS | ||
| REMOVE EXISTING CORNER BEAD | 1000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE | 42000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE ALL OTHERS | 100.00 | LNFT | ||
| REMOVE EXISTING DOOR THRESH HOLD | 600.00 | LNFT | ||
| REMOVE EXISTING FLOOR TILE | 6000.00 | SQFT | ||
| REMOVE EXISTING FLOORING ALL OTHERS | 500.00 | SQFT | ||
| REMOVE EXISTING RUBBER FLOORING | 250.00 | SQFT | ||
| REMOVE EXISTING STAIR TREAD RUBBER | 25.00 | EA | ||
| REMOVE EXISTING TILE COVE BASE | 400.00 | LNFT | ||
| REMOVE EXISTING VINYL FLOORING | 1000.00 | SQFT | ||
| REMOVE EXISTING WOOD BASEBOARD | 500.00 | LNFT | ||
| REMOVE TERRAZZO | 500.00 | SQFT | ||
| REMOVE VINYL WALL COVERING | 25000.00 | SQFT | ||
| REMOVE WAINSCOT | 8000.00 | SQFT | ||
| REMOVE WALLPAPER | 10000.00 | SQFT | ||
| REMOVE WOOD PANELING | 500.00 | SQFT | ||
| REPAIR 5/8" DRYWALL | 1500.00 | SQFT | ||
| REMOVE AND REPLACE GROUT IN EXISTING TILE FLOORING | 100.00 | HRLY | ||
| TRANSITION STRIPS | 36.00 | LNFT | ||
| INSTALL VINYL COVE BASE | 400.00 | LNFT | ||
| SKIM COATING | 400.00 | SQFT | ||
| Total | $0.00 | $0.00 | ||
| NOTE: Offerors must offer prices on ALL items. Failure to do so may be reason to |
Base Yr 3 - Months 25-36
| FY 26 FLOORING IDIQ BID SCHEDULE | ||||
| Instructions to Offerors: Provide fully burdened unit prices (including overhead, profit, and standard installation labor) for the flooring materials listed below. The "Estimated Annual Quantity" is for Government evaluation purposes only to calculate the TEP and does not constitute a guarantee of future work. The proposed unit prices will become the binding maximum ceiling rates for this specific contract year. | ||||
| Base Ordering Period (3-YEAR PERIOD) | ||||
| Description | Est. Quantity | Unit | Unit Price | Total |
| ASBESTOS ABATEMENT/REMOVAL | 3000.00 | SQFT | ||
| ADJUST WOODEN DOORS | 25.00 | EA | ||
| APPLY WALL/CEILING TEXTURE | 10000.00 | SQFT | ||
| ASBESTOS SAMPLE TESTING | 65.00 | EA | ||
| CONCRETE PATCHING | 2000.00 | SQFT | ||
| CONCRETE REPAIR | 2000.00 | SQFT | ||
| INSTALL CHAIR RAIL | 500.00 | LNFT | ||
| INSTALL CORNER GUARDS 1"X1"X36' | 10.00 | EA | ||
| INSTALL NEW 4" RUBBER COVE BASE | 1500.00 | LNFT | ||
| INSTALL 4" WOOD BASEBOARD | 500.00 | LNFT | ||
| INSTALL NEW 5/8" DRYWALL | 45000.00 | SQFT | ||
| INSTALL NEW 6" RUBBER COVE BASE | 12000.00 | LNFT | ||
| INSTALL NEW 6" WOOD BASEBOARD | 300.00 | LNFT | ||
| INSTALL NEW ADJUSTABLE METAL SLEUTER | 500.00 | LNFT | ||
| INSTALL NEW CARPET TILE | 5000.00 | SQYDS | ||
| INSTALL NEW CORNER BEAD | 1000.00 | LNFT | ||
| INSTALL NEW DOOR THRESHOLD | 1500.00 | LNFT | ||
| INSTALL NEW EPOXY FLOORING | 5000.00 | SQFT | ||
| INSTALL NEW FLOOR TILE | 6500.00 | SQFT | ||
| INSTALL NEW VINYL FLOORING | 500.00 | SQFT | ||
| INSTALL NEW RUBBER FLOORING | 1000.00 | SQFT | ||
| INSTALL NEW RUBBER RISER | 25.00 | EA | ||
| INSTALL NEW RUBBER STAIR TREADS | 25.00 | EA | ||
| INSTALL NEW RUBBER TRANSITION STRIP | 600.00 | LNFT | ||
| INSTALL NEW TILE COVE BASE | 500.00 | LNFT | ||
| INSTALL SELF LEVELING UNDERLAYMENT | 50000.00 | SQFT | ||
| PAINT - PRIMER INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - SECOND INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - FIRST INTERIOR COAT | 45000.00 | SQFT | ||
| REMOVE 5/8" DRYWALL | 45000.00 | SQFT | ||
| REMOVE AND INSTALL EXISTING CORNER GUARDS | 100.00 | EA | ||
| REMOVE EXISTING WOOD BASEBOARD | 1000.00 | LNFT | ||
| REMOVE CHAIR RAIL | 5000.00 | LNFT | ||
| REMOVE CORNER GUARDS | 500.00 | EA | ||
| REMOVE EXISTING CARPET | 6000.00 | SQYDS | ||
| REMOVE EXISTING CORNER BEAD | 1000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE | 42000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE ALL OTHERS | 100.00 | LNFT | ||
| REMOVE EXISTING DOOR THRESH HOLD | 600.00 | LNFT | ||
| REMOVE EXISTING FLOOR TILE | 6000.00 | SQFT | ||
| REMOVE EXISTING FLOORING ALL OTHERS | 500.00 | SQFT | ||
| REMOVE EXISTING RUBBER FLOORING | 250.00 | SQFT | ||
| REMOVE EXISTING STAIR TREAD RUBBER | 25.00 | EA | ||
| REMOVE EXISTING TILE COVE BASE | 400.00 | LNFT | ||
| REMOVE EXISTING VINYL FLOORING | 1000.00 | SQFT | ||
| REMOVE EXISTING WOOD BASEBOARD | 500.00 | LNFT | ||
| REMOVE TERRAZZO | 500.00 | SQFT | ||
| REMOVE VINYL WALL COVERING | 25000.00 | SQFT | ||
| REMOVE WAINSCOT | 8000.00 | SQFT | ||
| REMOVE WALLPAPER | 10000.00 | SQFT | ||
| REMOVE WOOD PANELING | 500.00 | SQFT | ||
| REPAIR 5/8" DRYWALL | 1500.00 | SQFT | ||
| REMOVE AND REPLACE GROUT IN EXISTING TILE FLOORING | 100.00 | HRLY | ||
| TRANSITION STRIPS | 36.00 | LNFT | ||
| INSTALL VINYL COVE BASE | 400.00 | LNFT | ||
| SKIM COATING | 400.00 | SQFT | ||
| Total | $0.00 | $0.00 | ||
| NOTE: Offerors must offer prices on ALL items. Failure to do so may be reason to |
Option Yr 1 - Months 25-36
| FY 26 FLOORING IDIQ BID SCHEDULE | ||||
| Instructions to Offerors: Provide fully burdened unit prices (including overhead, profit, and standard installation labor) for the flooring materials listed below. The "Estimated Annual Quantity" is for Government evaluation purposes only to calculate the TEP and does not constitute a guarantee of future work. The proposed unit prices will become the binding maximum ceiling rates for this specific contract year. | ||||
| Option Ordering Period (2-YEAR PERIOD) | ||||
| Description | Est. Quantity | Unit | Unit Price | Total |
| ASBESTOS ABATEMENT/REMOVAL | 3000.00 | SQFT | ||
| ADJUST WOODEN DOORS | 25.00 | EA | ||
| APPLY WALL/CEILING TEXTURE | 10000.00 | SQFT | ||
| ASBESTOS SAMPLE TESTING | 65.00 | EA | ||
| CONCRETE PATCHING | 2000.00 | SQFT | ||
| CONCRETE REPAIR | 2000.00 | SQFT | ||
| INSTALL CHAIR RAIL | 500.00 | LNFT | ||
| INSTALL CORNER GUARDS 1"X1"X36' | 10.00 | EA | ||
| INSTALL NEW 4" RUBBER COVE BASE | 1500.00 | LNFT | ||
| INSTALL 4" WOOD BASEBOARD | 500.00 | LNFT | ||
| INSTALL NEW 5/8" DRYWALL | 45000.00 | SQFT | ||
| INSTALL NEW 6" RUBBER COVE BASE | 12000.00 | LNFT | ||
| INSTALL NEW 6" WOOD BASEBOARD | 300.00 | LNFT | ||
| INSTALL NEW ADJUSTABLE METAL SLEUTER | 500.00 | LNFT | ||
| INSTALL NEW CARPET TILE | 5000.00 | SQYDS | ||
| INSTALL NEW CORNER BEAD | 1000.00 | LNFT | ||
| INSTALL NEW DOOR THRESHOLD | 1500.00 | LNFT | ||
| INSTALL NEW EPOXY FLOORING | 5000.00 | SQFT | ||
| INSTALL NEW FLOOR TILE | 6500.00 | SQFT | ||
| INSTALL NEW VINYL FLOORING | 500.00 | SQFT | ||
| INSTALL NEW RUBBER FLOORING | 1000.00 | SQFT | ||
| INSTALL NEW RUBBER RISER | 25.00 | EA | ||
| INSTALL NEW RUBBER STAIR TREADS | 25.00 | EA | ||
| INSTALL NEW RUBBER TRANSITION STRIP | 600.00 | LNFT | ||
| INSTALL NEW TILE COVE BASE | 500.00 | LNFT | ||
| INSTALL SELF LEVELING UNDERLAYMENT | 50000.00 | SQFT | ||
| PAINT - PRIMER INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - SECOND INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - FIRST INTERIOR COAT | 45000.00 | SQFT | ||
| REMOVE 5/8" DRYWALL | 45000.00 | SQFT | ||
| REMOVE AND INSTALL EXISTING CORNER GUARDS | 100.00 | EA | ||
| REMOVE EXISTING WOOD BASEBOARD | 1000.00 | LNFT | ||
| REMOVE CHAIR RAIL | 5000.00 | LNFT | ||
| REMOVE CORNER GUARDS | 500.00 | EA | ||
| REMOVE EXISTING CARPET | 6000.00 | SQYDS | ||
| REMOVE EXISTING CORNER BEAD | 1000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE | 42000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE ALL OTHERS | 100.00 | LNFT | ||
| REMOVE EXISTING DOOR THRESH HOLD | 600.00 | LNFT | ||
| REMOVE EXISTING FLOOR TILE | 6000.00 | SQFT | ||
| REMOVE EXISTING FLOORING ALL OTHERS | 500.00 | SQFT | ||
| REMOVE EXISTING RUBBER FLOORING | 250.00 | SQFT | ||
| REMOVE EXISTING STAIR TREAD RUBBER | 25.00 | EA | ||
| REMOVE EXISTING TILE COVE BASE | 400.00 | LNFT | ||
| REMOVE EXISTING VINYL FLOORING | 1000.00 | SQFT | ||
| REMOVE EXISTING WOOD BASEBOARD | 500.00 | LNFT | ||
| REMOVE TERRAZZO | 500.00 | SQFT | ||
| REMOVE VINYL WALL COVERING | 25000.00 | SQFT | ||
| REMOVE WAINSCOT | 8000.00 | SQFT | ||
| REMOVE WALLPAPER | 10000.00 | SQFT | ||
| REMOVE WOOD PANELING | 500.00 | SQFT | ||
| REPAIR 5/8" DRYWALL | 1500.00 | SQFT | ||
| REMOVE AND REPLACE GROUT IN EXISTING TILE FLOORING | 100.00 | HRLY | ||
| TRANSITION STRIPS | 36.00 | LNFT | ||
| INSTALL VINYL COVE BASE | 400.00 | LNFT | ||
| SKIM COATING | 400.00 | SQFT | ||
| Total | $0.00 | $0.00 | ||
| NOTE: Offerors must offer prices on ALL items. Failure to do so may be reason to |
Option Yr 2 - Months 37-48
| FY 26 FLOORING IDIQ BID SCHEDULE | ||||
| Instructions to Offerors: Provide fully burdened unit prices (including overhead, profit, and standard installation labor) for the flooring materials listed below. The "Estimated Annual Quantity" is for Government evaluation purposes only to calculate the TEP and does not constitute a guarantee of future work. The proposed unit prices will become the binding maximum ceiling rates for this specific contract year. | ||||
| Option Ordering Period (2-YEAR PERIOD) | ||||
| Description | Est. Quantity | Unit | Unit Price | Total |
| ASBESTOS ABATEMENT/REMOVAL | 3000.00 | SQFT | ||
| ADJUST WOODEN DOORS | 25.00 | EA | ||
| APPLY WALL/CEILING TEXTURE | 10000.00 | SQFT | ||
| ASBESTOS SAMPLE TESTING | 65.00 | EA | ||
| CONCRETE PATCHING | 2000.00 | SQFT | ||
| CONCRETE REPAIR | 2000.00 | SQFT | ||
| INSTALL CHAIR RAIL | 500.00 | LNFT | ||
| INSTALL CORNER GUARDS 1"X1"X36' | 10.00 | EA | ||
| INSTALL NEW 4" RUBBER COVE BASE | 1500.00 | LNFT | ||
| INSTALL 4" WOOD BASEBOARD | 500.00 | LNFT | ||
| INSTALL NEW 5/8" DRYWALL | 45000.00 | SQFT | ||
| INSTALL NEW 6" RUBBER COVE BASE | 12000.00 | LNFT | ||
| INSTALL NEW 6" WOOD BASEBOARD | 300.00 | LNFT | ||
| INSTALL NEW ADJUSTABLE METAL SLEUTER | 500.00 | LNFT | ||
| INSTALL NEW CARPET TILE | 5000.00 | SQYDS | ||
| INSTALL NEW CORNER BEAD | 1000.00 | LNFT | ||
| INSTALL NEW DOOR THRESHOLD | 1500.00 | LNFT | ||
| INSTALL NEW EPOXY FLOORING | 5000.00 | SQFT | ||
| INSTALL NEW FLOOR TILE | 6500.00 | SQFT | ||
| INSTALL NEW VINYL FLOORING | 500.00 | SQFT | ||
| INSTALL NEW RUBBER FLOORING | 1000.00 | SQFT | ||
| INSTALL NEW RUBBER RISER | 25.00 | EA | ||
| INSTALL NEW RUBBER STAIR TREADS | 25.00 | EA | ||
| INSTALL NEW RUBBER TRANSITION STRIP | 600.00 | LNFT | ||
| INSTALL NEW TILE COVE BASE | 500.00 | LNFT | ||
| INSTALL SELF LEVELING UNDERLAYMENT | 50000.00 | SQFT | ||
| PAINT - PRIMER INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - SECOND INTERIOR COAT | 45000.00 | SQFT | ||
| PAINT - FIRST INTERIOR COAT | 45000.00 | SQFT | ||
| REMOVE 5/8" DRYWALL | 45000.00 | SQFT | ||
| REMOVE AND INSTALL EXISTING CORNER GUARDS | 100.00 | EA | ||
| REMOVE EXISTING WOOD BASEBOARD | 1000.00 | LNFT | ||
| REMOVE CHAIR RAIL | 5000.00 | LNFT | ||
| REMOVE CORNER GUARDS | 500.00 | EA | ||
| REMOVE EXISTING CARPET | 6000.00 | SQYDS | ||
| REMOVE EXISTING CORNER BEAD | 1000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE | 42000.00 | LNFT | ||
| REMOVE EXISTING COVE BASE ALL OTHERS | 100.00 | LNFT | ||
| REMOVE EXISTING DOOR THRESH HOLD | 600.00 | LNFT | ||
| REMOVE EXISTING FLOOR TILE | 6000.00 | SQFT | ||
| REMOVE EXISTING FLOORING ALL OTHERS | 500.00 | SQFT | ||
| REMOVE EXISTING RUBBER FLOORING | 250.00 | SQFT | ||
| REMOVE EXISTING STAIR TREAD RUBBER | 25.00 | EA | ||
| REMOVE EXISTING TILE COVE BASE | 400.00 | LNFT | ||
| REMOVE EXISTING VINYL FLOORING | 1000.00 | SQFT | ||
| REMOVE EXISTING WOOD BASEBOARD | 500.00 | LNFT | ||
| REMOVE TERRAZZO | 500.00 | SQFT | ||
| REMOVE VINYL WALL COVERING | 25000.00 | SQFT | ||
| REMOVE WAINSCOT | 8000.00 | SQFT | ||
| REMOVE WALLPAPER | 10000.00 | SQFT | ||
| REMOVE WOOD PANELING | 500.00 | SQFT | ||
| REPAIR 5/8" DRYWALL | 1500.00 | SQFT | ||
| REMOVE AND REPLACE GROUT IN EXISTING TILE FLOORING | 100.00 | HRLY | ||
| TRANSITION STRIPS | 36.00 | LNFT | ||
| INSTALL VINYL COVE BASE | 400.00 | LNFT | ||
| SKIM COATING | 400.00 | SQFT | ||
| Total | $0.00 | $0.00 | ||
| NOTE: Offerors must offer prices on ALL items. Failure to do so may be reason to |
Mock Seed Project
| FY 26 FLOORING IDIQ BID SCHEDULE |
| Instructions for Offerors: Provide a firm-fixed-price breakdown to execute the attached Mock Seed Project Statement of Work (Bldg 475 Flooring). Prices must be fully burdened. |
| Description | Quantity | Unit | Unit Price | Total |
| REMOVE EXISTING COVE | 413.00 | LNFT | ||
| REMOVE EXISTING CARPET TILE | 1778.00 | SQFT | ||
| PREPARE SUBFLOOR (SKIM COAT) | 1778.00 | SQFT | ||
| INSTALL NEW CARPET TILE | 198.00 | SQYDS | ||
| INSTALL NEW COVE BASE | 413.00 | LNFT | ||
| Total | $0.00 | $0.00 | ||
| NOTE: Offerors must offer prices on ALL items. Failure to do so may be reason to |
Summary - Total Evaluated Price
| FY 26 FLOORING IDIQ BID SCHEDULE | ||
| Instructions for Offerors: This tab auto-calculates your Total Evaluated Price (TEP). Verify that the numbers pulled from the previous tabs are correct. The TEP is for evaluation purposes only and does not represent a guaranteed contract value. The Government will use the final TEP calculated on this tab to conduct its price evaluation in accordance with Section M of the solicitation. | ||
| Summary Tab - Total Evaluated Price (TEP) | ||
| Pricing Component | Source Location | Total Price |
| Base Year 1 Total | [Pull from Tab 1] | $0.00 |
| Base Year 2 Total | [Pull from Tab 2] | $0.00 |
| Base Year 3 Total | [Pull from Tab 3] | $0.00 |
| Option Year 1 Total | [Pull from Tab 4] | $0.00 |
| Option Year 2 Total | [Pull from Tab 5] | $0.00 |
| Seed Project Total | [Pull from Tab 6] | $0.00 |
| Grand Total | Total Evaluated Price (TEP) | $0.00 |