Attachment 5 - Mock Seed Project Drawings - Bldg 475 - 5 OG.pdf
PDF 769 KB Posted
- Attached to
- Minot AFB Flooring MACC FY26
- Solicitation number
- FA452826R0001
About this file
This image is a floor plan for the 5 OG Chaplain (Priority 1) renovation project at what appears to be a federal facility. The document identifies two specific work areas requiring flooring modifications in the second floor of Building 475.
The first priority work item involves the hallway, marked with a blue oval on the floor plan, which requires removal of existing carpet and installation of vinyl flooring. The second priority work item involves an office space, marked with a red circle, which requires removal and replacement of carpet. The floor plan uses color-coding to differentiate various functional areas within the building, including operations groups, administrative offices, legal services, and other support functions. This document appears to serve as a visual reference guide for scope definition and location identification for the renovation contractor.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .