This document is a solicitation clauses and provisions document that outlines the contractual requirements incorporated into a federal contract opportunity.

The document is organized into three sections. Section I includes clauses with critical fill-ins or those fundamental to contract structure, presented in full text, including FAR 52.252-1 (Solicitation Provisions Incorporated by Reference), FAR 52.211-12 (Liquidated Damages—Construction), and FAR 52.212-1 and 52.212-2 (Instructions to Offerors and Evaluation criteria for Commercial Products and Services, with Deviation 2026-O0038). Section II incorporates additional FAR clauses by reference, including provisions related to small business program representations (52.219-1), contract work hours and safety standards (52.222-4), construction wage rate requirements (52.222-6), Buy American construction materials (52.225-9), insurance requirements (52.228-5), performance and payment bonds (52.228-15), differing site conditions (52.236-2 through 52.236-3), material and workmanship standards (52.236-5), contractor superintendence (52.236-6), permits and responsibilities (52.236-7), changes to fixed-price contracts (52.243-1), and disputes procedures (52.233-1). Section III incorporates R-DFARS clauses by reference related to cybersecurity requirements, including NIST SP 800-171 DoD Assessment Requirements (252.204-7020), Cybersecurity Maturity Model Certification (252.204-7021), and Supplier Performance Risk System notices (252.204-7024). The document indicates this is a construction-related contract with commercial products or services components, subject to applicable federal regulations and security requirements.

View the file

Other files

File Type Posted
Attachment 9 - Pricing Schedule (Amendment 0006 - 19 Aug 2026).xlsx XLSX spreadsheet
Solicitation_QA_2_FA452826R0001 (Amendment 0006 - 19 Aug 2026).pdf PDF
Solicitation Amendment FA452826R00010006 SF 30.pdf PDF
Attachment 1 - Flooring MACC Statement of Work (SOW) (Amendment 0006 - 19 Aug 2026).docx DOCX document
Attachment 2 - Mock Seed Project SOW (Amendment 0006 - 19 Aug 2026).docx DOCX document
Solicitation Amendment FA452826R00010005 SF 30.pdf PDF
Solicitation_QA_FA452826R0001 (Amendment 0004 - 20 July 2026).pdf PDF
Attachment 9 - Pricing Schedule (Amendment 0004 - 20 July 2026).xlsx XLSX spreadsheet
Solicitation Amendment FA452826R00010004 SF 30.pdf PDF
Attachment 2 - Mock Seed Project SOW (Amendment 0004 - 20 July 2026).pdf PDF
Solicitation Amendment FA452826R00010003 SF 30.pdf PDF
Attachment 3 - Flooring IDIQ MACC Ordering Guide (Amendment 0002 - 10 Jun 26).pdf PDF
Solicitation Amendment FA452826R00010002 SF 30.pdf PDF
Attachment 1 - Flooring MACC Statement of Work (SOW) (Amendment 0002 - 10 Jun 26).pdf PDF
Attachment 7 - Section L - Instructions to Offerors (Amendment 0001 - 5 Jun 26).pdf PDF
Solicitation Amendment FA452826R00010001 SF 30.pdf PDF
Attachment 6 - Davis-Bacon Act WD No. ND20260031 (18 May 26).pdf PDF
Attachment 10 - Past Performance Questionnaire (PPQ) Template.docx DOCX document
Attachment 1 - Flooring MACC Statement of Work (SOW).pdf PDF
Attachment 7 - Section L - Instructions to Offerors.pdf PDF
Attachment 8 - Section M - Evaluation Factors.pdf PDF
Attachment 11 - Financial Responsibility Authorization Letter Template.docx DOCX document
Attachment 5 - Mock Seed Project Drawings - Bldg 475 - 5 OG.pdf PDF
Attachment 12 - Subcontractor Consent Letter Template.docx DOCX document
Solicitation - FA452826R0001.pdf PDF
Attachment 2 - Mock Seed Project Statement of Work (SOW) - Bldg 475.pdf PDF
Attachment 3 - Flooring IDIQ MACC Ordering Guide.pdf PDF
Attachment 4 - Mock Seed Project Drawings - Bldg 475 - 5 OSS.pdf PDF
Attachment 9 - Pricing Schedule.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Clauses and Provisions

Section I: RFO Clauses and Provisions Incorporated by Full Text

This section includes clauses with critical fill-ins or those that are fundamental to the contract's structure and are therefore included in their entirety.

• 52.252-1 Solicitation Provisions Incorporated by Reference

As prescribed in 52.107(a), insert the following provision:

SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

(End of provision)

• 52.211-12, Liquidated Damages—Construction

As prescribed in 11.403(b), insert the following clause in solicitations and contracts:

LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of a rate to be determined for each individual Task Order for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

(End of clause)

• 52.212-1, Instructions to Offerors—Commercial Products and Commercial Services (Deviation 2026-O0038)

As prescribed in 12.205(a)(1), insert a clause substantially as follows:

INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB

2026)

(Note: Provided as Attachment 7 - Section L – Instructions to Offerors)

• 52.212-2, Evaluation—Commercial Products and Commercial Services (Deviation 2026-O0038)

As prescribed in 12.205(a)(2), insert a provision substantially as follows:

EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2026)

(Note: Provided as Attachment 8 - Section M – Evaluation Factors)

Section II: RFO Clauses and Provisions Incorporated by Reference

The following clauses are incorporated by reference. The full text may be accessed electronically at https://www.acquisition.gov/.

FAR

Clause

Title Effective Date

Alternate / Deviation

Variation Effective Date

52.209-7 Information Regarding Responsibility Matters

Oct 2018

52.215-

Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data.

Feb 2026 Alternate IV

52.216-

Single or Multiple Awards Feb 2026

52.219-1 Small Business Program Representations Mar 2023

52.222-4 Contract Work Hours and Safety Standards - Overtime Compensation

May 2018

52.222-6 Construction Wage Rate Requirements Aug 2018

52.225-9 Buy American—Construction Materials Nov 2023

52.228-5 Insurance—Work on a Government Installation

Jan 1997

52.228-

Performance and Payment Bonds— Construction

Feb 2026 https://www.google.com/url?q=https%3A%2F%2Fwww.acquisition.gov%2F

52.233-1 Disputes Feb 2026

52.236-2 Differing Site Conditions Apr 1984

52.236-3 Site Investigation and Conditions Affecting the Work

Apr 1984

52.236-5 Material and Workmanship Apr 1984

52.236-6 Superintendence by the Contractor Apr 1984

52.236-7 Permits and Responsibilities Nov 1991

52.236-8 Other Contracts Apr 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

Apr 1984

52.236-

Operations and Storage Areas Apr 1984

Use and Possession Prior to Completion Apr 1984

Cleaning Up Apr 1984

Schedules for Construction Contracts Nov 1997

Specifications and Drawings for Construction

Feb 1997

52.243-1 Changes-Fixed-Price Feb 2026

52.243-4 Changes Feb 2026

Section III: R-DFARS Clauses and Provisions Incorporated by Reference

The following clauses are incorporated by reference. The full text may be accessed electronically at https://www.acquisition.gov/dfars.

R-DFARS

Clause

Title Effective Date

Alternate / Deviation

Variation Effective Date

252.204-

Notice of NIST SP 800-171 DoD Assessment Requirements

Nov 2023

252.204-

NIST SP 800-171 DoD Assessment Requirements

Jan 2023

Cybersecurity Maturity Model Certification (CMMC) Requirements

Dec 2022

Notice on the Use of the Supplier Performance Risk System.

Mar 2023 https://www.google.com/url?q=https%3A%2F%2Fwww.acquisition.gov%2Fdfars