Attachment 2 - Mock Seed Project SOW (Amendment 0006 - 19 Aug 2026).docx
DOCX document 31 KB Posted
- Attached to
- Minot AFB Flooring MACC FY26
- Solicitation number
- FA452826R0001
About this file
This is a Statement of Work (SOW) for a Mock Seed Project under the Minot Air Force Base Flooring Multiple Award Construction Contract (MACC) solicitation FA452826R0001.
The Mock Seed Project SOW outlines the scope of work and performance requirements that contractors must demonstrate capability to perform under the broader MACC contract for flooring installation, repair, and replacement services at Minot Air Force Base, North Dakota. This document serves as a demonstration project to validate contractor qualifications and execution capabilities before being awarded tasks under the indefinite-delivery, indefinite-quantity (IDIQ) contract structure. The Government intends to award approximately three to five Firm-Fixed-Price IDIQ contracts as a result of this solicitation, which is a 100% Small Business Set-Aside under NAICS code 238330. The solicitation incorporates multiple amendments through Amendment 0006 (issued August 19, 2026), with the final proposal submission deadline of August 24, 2026, at 4:30 p.m. CDT. Offerors must acknowledge receipt of all amendments (0001 through 0006) with their proposal submissions. Proposals must be submitted electronically to 5CONS.PKAC.FlooringMACC@us.af.mil, and the contract will be awarded on a Firm-Fixed-Price basis with pricing submitted per the Pricing Schedule (Attachment 9).
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 DESCRIPTION OF SERVICES
1.1. Scope. The contractor shall provide all plant, labor, materials, equipment, and supervision required to replace the flooring in the designated areas listed in Section 3.0 of this SOW. The objective is to remove existing flooring, safely address identified hazardous materials, prepare all surfaces, and install new flooring to provide a turn-key project ready for full use.
1.2. General Requirements. All work shall be performed in strict accordance with this task order SOW, the governing Base Flooring MACC IDIQ Statement of Work, and all referenced Unified Facilities Guide Specifications (UFGS).
2.0 SPECIFIC TASKS
2.1. Site Verification. The contractor shall be responsible for verifying all measurements and project conditions. Any provided plans are approximate. The contractor shall notify the Contracting Officer (CO) of any conditions found that prevent the satisfactory installation of flooring materials.
2.2. Flooring Removal. The contractor shall remove existing flooring, adhesives, and accessories in the work areas identified in Section 3.0.
2.3. Hazardous Material Handling.
2.3.1. Asbestos Sample was taken (NO ASBESTOS DETECTED)
2.3.2. Submittals. The contractor shall submit all required documentation for as If this is not structurally feasible, the contractor shall install a new shoe molding that exactly matches the color of the existing wooden baseboards. Asbestos remediation as outlined in the IDIQ SOW, including but not limited to the NDDEQ Notification form, Abatement Plan, licenses, and disposal reports.
2.4. Surface Preparation. The contractor shall perform all surface preparation IAW the flooring manufacturer’s instructions and the IDIQ SOW. This includes repairing minor holes and cracks with a compatible patching compound (limited to one gallon per ten square yards unless otherwise approved by the CO). The contractor is responsible for testing the moisture content and alkalinity of the substrate.
2.5. Flooring Installation. The contractor shall install new flooring and accessories in the designated rooms and hallways.
2.5.1. The new flooring shall be commercial-grade Luxury Vinyl Plank (LVP) in the hallway and commercial-grade carpet tile in the offices, meeting the material specifications outlined in Section 3.0 of this SOW.
2.5.2. The contractor shall install the new flooring by sliding it under the existing wooden baseboards (if wooden baseboards are present, see table below). All other flooring install will be new 4" rubber cove base.
2.6. Debris Disposal. The contractor shall dispose of all scrap materials, construction debris, and packaging at an approved off-base location at no cost to the Government.
3.0 LOCATION AND MATERIAL SPECIFICATIONS
3.1. Locations & Materials. The contractor shall ensure only the specified materials meeting the performance requirements below are used in each respective room. The contractor shall provide material submittals for Government approval prior to ordering materials. BLDG 475 Carpet tile and Vinyl flooring in hallway is comprised of the rooms listed in the table below.
3.1.1. Carpet Tile Specifications. All carpet tile installed under this task order shall be certified to the NSF/ANSI 140 Gold standard (or higher) and meet the following minimum salient technical characteristics:
· Pile Type: Low
· Pile Fiber: Nylon
· Gauge/Pitch: 1/10 to 1/12 gauge and a pitch of 47 to 50 ends per 10 cm
· Stitches or Rows/Wires: 8 to 10 stitches/inch
· Surface Pile Weight: 15 to 20 oz
· Pile Thickness: including the backing 0.074 (1.9mm)
· Pile Density: 7,297 oz/yd2 or 270,571 g/m2
· Dye Method: solution dyed
3.1.2. LVP Specifications. All Luxury Vinyl Plank (LVP) installed under this task order shall have a minimum overall thickness of 5 mm and a minimum wear layer of 20 mil.
3.1.3. Project Locations. The flooring shall be installed in the following locations:
| Room/Location |
| Estimated Sq FT (contractor to verify) |
| Required Flooring Type (Performance Specification) |
| Color and type |
Bldg. 475 2nd floor
| Room 251(wooden baseboards present) |
| 432.48 sq ft |
| Carpet Tile (NSF/ANSI 140 Gold or higher) |
| 2726 |
| Room 258 (no wooden baseboards present) |
| 300 sq ft |
| Carpet Tile (NSF/ANSI 140 Gold or higher) |
| 2726 |
| Room 258C (no wooden baseboards present) |
| 431.84 sq ft |
| Carpet Tile (NSF/ANSI 140 Gold or higher) |
| 2726 |
| Hallway Vinyl Plank LVP (no wooden baseboards present) |
| 612 sq ft |
| LVP (5mm thickness, 20mil wear layer) |
| 1058 |
4.0 ADMINISTRATION AND REPORTING
4.1. Notice to Proceed (NTP). The contractor shall not commence work on this project until an official NTP is issued by the CO.
4.2. Submittals. IAW the IDIQ SOW, the contractor shall provide material submittals (samples, data sheets), a Removal and Installation Plan, and a Health and Safety Plan to the CO for approval prior to commencing work.
4.3. Reporting. The contractor shall provide regular progress updates to the CO and immediately communicate any issues, hazards, or delays.
4.4. Final Inspection and Acceptance. Upon project completion, the contractor shall schedule and conduct a Final Inspection with the CO and the designated facility inspector.
4.5. Warranty. The contractor shall provide a minimum one-year warranty on all work performed. A copy of all manufacturers and contractor warranties shall be submitted to the CO before final inspection.
5.0 SITE-SPECIFIC PROVISIONS
5.1. Hours of Operation. Work shall be performed during normal hours of operation (0700–1700, Monday–Friday), excluding federal holidays. Any work outside these hours requires written approval from the CO at least one week in advance.
5.2. Security and Base Access.
5.2.1. The contractor is responsible for obtaining all necessary passes for personnel and vehicles IAW the IDIQ SOW.
5.3. Government-Furnished Items. All reasonable quantities of utilities (water and electricity) will be made available to the contractor without charge. No Government Furnished Equipment (GFE) will be provided.