Task Order Statement of Work Summary
This is a Task Order Statement of Work for Building 475 Flooring Replacement dated May 5, 2026. The project scope requires removal and replacement of existing carpet tiles with new ones in three rooms and one hallway located on the second floor of Building 475 (the Pride Building). Specifically, the work encompasses Room 251 (432.5 sq ft), Room 258 (300 sq ft), Room 258C (431.84 sq ft), and the hallway in front of Room 251 (612 sq ft), totaling approximately 1,776.34 square feet.
The contractor is responsible for verifying actual square footage upon site inspection and adhering to specified material requirements to maintain aesthetic consistency throughout the facility. Work cannot commence until a Notice to Proceed (NTP) is issued by the contracting officer. The contractor must provide regular progress updates and immediately communicate any issues or delays to the contracting office. Upon project completion, the contractor must conduct a Final Inspection with the contracting officer and inspector to verify all work meets specifications outlined in the work order. The warranty period for delivered services commences upon project sign-off. Robert Weaver, 5 CES Service Contract Manager, is identified as the contracting authority.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 05 May 26
Task Order Statement of Work
Project Name: BLDG 475 FLOORING REPLACEMENT
1. This document provides detailed specifications for the flooring project named above. Please read the following instructions carefully to ensure a complete understanding of the scope of work.
Scope of Work: Remove and replace existing carpet tiles with new ones in three rooms and one hallway located on the second floor of Building 475 (the Pride Building). This project specifically includes Rooms 251, 258, and 258C, as well as the hallway in front of Room 251.
Room (Number/Location/Description) BLDG 475 2nd floor
Estimated Square Footage
Room 251 432.5 sq ft Hallway 612 sq ft Room 258 300 sq ft Room 258C 431.84 sq ft
**Add additional rows as needed for requirements.
Contractor Responsibilities:
a. Verify Square Footage: It is the responsibility of the contractor to verify the actual square footage upon site inspection.
b. Adhere to Material Specifications: The specified materials are crucial to maintaining a cohesive aesthetic throughout the facility. Please ensure that the correct flooring materials are used in each respective room.
2. Reporting:
a. Contractors must provide regular progress updates throughout the project.
Additionally, any issues or delays encountered during the project must be communicated immediately to the contracting office.
3. Completion:
a. No work on this project shall commence until a Notice to Proceed (NTP) is issued by the contracting officer.
b. Upon completion of the project, the contractor must perform a Final Inspection with the contracting officer and inspector to ensure all work has been completed to satisfaction, adhering to specifications outlined in this work order. When the project is signed off as complete, the warranty period for the delivered services will commence.
Robert Weaver, 5 CES, Service Contract Manger, Task Order Statement of Work