This document is a Memorandum for Record from the 1st Special Operations Wing (AFSOC) at Hurlburt Field, Florida, detailing a Request for Information (RFI) for an AV installation project at the NAF Soundside Club. The project involves replacing audio-visual equipment across multiple ballrooms and spaces, including 4 mounted video projectors, 4 motorized projection screens, a digital network controller, switcher, amplifiers, 22 ceiling-mounted speakers, wireless microphones, and related equipment. Key requirements include fully covering existing ballroom spaces without "dead zones", using in-ceiling speakers, providing 2 handheld and 2 lapel microphones per ballroom zone, and implementing a tablet-based control system with passcode access.
The solicitation (FA441725QHURL) covers spaces including Broadway Ballroom (39'x49'), Ton Son Nhut Ballroom (54'x49'), Bagram Ballroom (38'x49'), Harman Ball Room (22'x38'), and a Pre-Function Area (28'x38'). The contractor will be responsible for wall/ceiling repairs, potentially reusing existing projector mounts, and installing a UPS/power conditioner. Work hours are restricted to 0800-1600 Central Time Monday-Friday, with Saturday work requiring coordination with Soundside Management. The project emphasizes maintaining the current facility condition and ensuring comprehensive AV coverage across all specified spaces.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
1ST SPECIAL OPERATIONS WING (AFSOC)
HURLBURT FIELD FLORIDA
Any Time…Any Place
September 2025
MEMORANDUM FOR RECORD
FROM: 1 SOCONS/PKA
SUBLJECT: Contractor’s Request for Information – NAF Soundside Club AV Install Solicitation FA441725QHURL
1. The exact number of speakers, and other items to be replaced?
A: 4 ea. mounted video projectors, 4 ea. motorized projection screens, 1 ea. digital network controller, 1 ea. Switcher, 2 ea. 3-channel Amplifiers, 1 ex; Nexia-CS amplifier;
22 ea. speakers mounted in ceiling, 6 ea. wireless microphones, 4 ea. wireless microphone receivers; 6 ea. wireless lavaliers, 5 ea. Wall mounted panels for connecting AV and PCs; 3
ea. Power distribution, 1 ea. rack for BOH stacks; 7 ea .outdoor speakers located on the patio.
2. Makes and models of the existing audio/visual equipment?
A: 2 ea Sanyo Proxtra X Multiverse projectors, 4 ea. Da-Lite Advantage video/projector screens, 2 ea. Juicey Goose 8.0 Power Distro; 1 ea. Creston Professional Video Switcher; 1 ea. Nexia CS Control Processor, 1 ea. Soundweb London Blu-BoB Break-out box, 1 ea. Soundweb London Blu-100 signal processor;
3. Any other pertinent details regarding the project scope?
A: Please see answered questions within this document and the updated SOW.
4. Would you be able to provide pictures of the space and/or diagrams with measurements?
A: Please see attached pictures added, the pictures are of:
Browadway Ballroom 39’w X 49’ Ton Son Nhut Ballroom 54’w X 49’ Bagram Ballroom 38’w X 49’ Harman Ball Room 22’ X 10’’ X 38’ Pre-Function Area 28’ X 7’ X 38’
5. What material are the walls and ceilings in each space?
A: We do not have this information available, currently.
6. Is there an as-built drawing of the current system for reference?
A: We do not have this available, currently.
7. Please provide a list of the equipment that needs to be removed.
A: 4 ea. mounted video projectors, 4 ea. motorized projection screens, 1 ea. digital network controller, 1 ea. Switcher, 2 ea. 3-channel Amplifiers, 1 ex; Nexia-CS amplifier;
22 ea. speakers mounted in ceiling, 6 ea. wireless microphones, 4 ea. wireless microphone receivers; 6 ea. wireless lavaliers, 5 ea. Wall mounted panels for connecting AV and PCs; 3
ea. Power distribution, 1 ea. rack for BOH stacks. 2 ea. Sanyo ProxtraX Multiverse projectors, 4 ea. Da-Lite Advantage video/projector screens, 2 ea. Juicey Goose 8.0 Power Distro; 1 ea. Creston Professional Video Switcher; 1 ea. Nexia CS Control Processor, 1 ea.
Soundweb London Blu-BoB Break-out box, 1 ea. Soundweb London Blu-100 signal processor;
8. Is there any equipment that will need to be reused?
A: Projector mounts, only if compatible with new projectors.
9. Are the wireless field boxes mentioned currently ceiling-mounted receivers or floor plates?
Please clarify.
A: Unknown.
10. For microphones: Do you require handheld, lapel, or both in each ballroom zone?
A: 2 ea. Handheld and 2 ea Lapel per 4 ea ballroom zones (Broadway, Ton Son Nhut, Bagram, and Harman)
11. Should microphones be interchangeable across zones, or permanently assigned?
A: Yes, all microphones must be interchangeable across zones. Zones should be able to be separate zones or “married to other” zones.
12. For outdoor and hallway speakers – should they be weatherproof and zoned separately?
A: Hallway/Pre-Function area speakers do NOT need to be weatherproof. Hallway speakers should be zoned separately from the ballrooms but able to “marry” to the other individual zones. Speakers located outside on the patio area DO need to be weatherproof and zoned with the Hallway/Pre-Function area
13. Are in-ceiling, surface-mount, or pendant speakers preferred for the ballrooms?
A: In-ceiling speakers for the ballrooms and pre-function areas.
14. For the four laser projectors – should they be ceiling-mounted with new mounts, or reuse existing mounts?
A: The new projectors MAY utilize the current ceiling mount if compatible.
15. Should the 130” retractable screens be motorized with wall control, and is integration into the AV system required?
A: Yes, the 130” retractable screens should be motorized with wall controls in each ballroom. Integration into the AV system is required.
16. Is there a requirement for touch panel control in each ballroom, hallway, and conference room, or just in the AV control room?
A: The requirement is for the AV system to be able to be controlled from a tablet that could be carried to rooms as needed and include a passcode.
17. Who is responsible for wall/ceiling repair after cutting in new speakers, outlets, and wall plates?
A: Contractor will be responsible for wall/ceiling repairs after cutting in new speakers, outlets and wall plates. The expectation is for the ballroom walls, ceilings and carpeting to be left in the same condition as found at the onset of the project.
18. Who is responsible for electrical outlets/power if new outlets are required at projector or rack locations?
A: CE will need to be contacted if new outlets or additional power is required. The expectation is that the contractor will utilize the current/available power.
19. Will Civil Engineering provide conduit and power as needed, or is that part of the AV scope?
A: No, CE will not provide conduit or additional power. It will be the contractor’s responsibility to provide any conduit required if they are altering the current power layout. The expectation is that the contractor will utilize the power supply that is currently available. Please see answer to number 18 above.
20. How far is the AV room where the rack is located from the ballroom and conference room?
A: The distance from AV room to each of the ballrooms/spaces is
APPROXIMAATELY
Browadway Ballroom - 7 Ft Ton Son Nhut Ballroom - 48 Ft Bagram Ballroom - 102 FT Harman Ball Room - 20 Ft Pre-Function Area - 40 Ft The Contractor is responsible for confirming these amounts.
21. Are there more technical details for this project?
A: Please see answered questions within this document and the updated SOW.
22. Could you please provide clarification on the Technical Approach guidelines provided in
Attachment 2 – Instruction to Offerors. Current description states, “Submit a written narrative which demonstrates an understanding of the project and responsibilities as outlined in the Statement of Work (SOW), not to exceed three (6) pages in length” Is this not to exceed 3 pages or 6 pages in length?
A: The written narrative is not to exceed six (6) pages.
23. There are 7 outdoor patio speakers > per the SOW there are needing to be replaced – Are these currently zoned to one of the ballrooms or hallway? Would you also like outdoor mics?
A: The 7 outdoor patio speakers are currently zoned with the Hooch Bar and Grill.
At a minimum, these are to be included in the Pre-function zone. Yes, outdoor mics are required.
24. Speakers per Ballroom – Would you like more speakers to cover the existing dead zones?
A: The desire is for the new Audio/Speakers will cover the existing ballroom spaces fully – no “dead” zones.
25. Projector Mount - do you want this replaced? Or how can we access this in the ceiling for replacement? Do you have any "attic stock"/replacement tiles?
A: Current projector mounts MAY be reused if compatible with new projectors.
The Contractor is responsible for providing any lifts or ladders required to complete the installation and/or access to the ceiling. Contractor will be responsible for replacing tiles.
26. There are existing wired mics in place - do you want to retain having wired mics, and how many wired mics per space? (in addition to the wireless mics) A: Yes, we do want to retain having 2 ea. wired mics per event space.
27. What type of control panel (touchscreen or hard button) do you want? How do you want to set/lock/passcode the control panels?
A: The requirement is for the AV system to be able to be controlled from a tablet that could be carried to rooms as needed and include a passcode.
28. Do you want a UPS/power conditioner installed within the rack?
A: Yes, UPS/power conditioner must be installed within the rack.
29. Will the Government accept redlines to the NONAPPROPRIATED FUND STANDARD
CLAUSES?
A: No, not alterations to the NAF Provisions and Clauses shall be made. The offeror must adhere to all requirements and fill-ins therein.
30. For the rooms, is there a preference between handheld microphones and lapel microphones?
(We noticed several handhelds and wanted to confirm if lapel mics were being considered.)
A: : 2 ea. Handheld and 2 ea. Lapel per 4 ea. ballroom zones (Broadway, Ton Son Nhut, Bagram, and Harman)
31. Would they prefer to have a touch screen in each individual room to allow for control of each space independently, as well as the ability to link rooms together, without needing to return to the equipment closet each time?
A: The requirement is for the AV system to be able to be controlled from a tablet that could be carried to rooms as needed and include a passcode.
32. Given the ceiling height in the largest area, will we be permitted to bring in a scissor lift for installation assistance?
A: Yes, the Contractor may bring a scissor lift for access to the ceiling area for installation. It is the contractor’s responsibility to provide any lifts/ladders required to complete their work.
33. Is there access to the attic, and if so, could you provide pictures?
A: Unknown
34. What is the ceiling height?
A: Unknown
35. Will the Government provide full drawings?
A: Not available
36. What are the required specifications?
A: See Updated SOW
37. We noted the working hours and the hours the facility is open. Will the install working hours start 1 hour after the facility working hours as stated?
A: Contractor work may be scheduled 0800-1600 Central Time MON-FRI. If Saturday work hours are desired, the Contractor must coordinate with Soundside Management. No work on Federal Holidays or official down days.