Attachment_21_-_Financial_Reference_Worksheet.docx

DOCX document 27 KB Posted

Attached to
Simplified Acquisition Base Engineer Requirements (SABER) IDIQ Federal contract opportunity
Solicitation number
FA441719RA002
Issued by
Department of the Air Force Special Operations Command

About this file

This document contains a financial reference worksheet template to be filled out by contractors submitting proposals for the Simplified Acquisition Base Engineer Requirements (SABER) IDIQ contract with the Department of the Air Force Special Operations Command. The template requests the contractor's company name and points of contact, as well as information from its financial institution including average monthly balances, current loans and lines of credit, late payments or NSFs, length of relationship, and credit rating. Upon selection as a potential awardee, the completed template will be sent to the contractor's banking institution for verification. The solicitation number for this IDIQ opportunity is FA441719RA002 and it was added on February 7, 2019 for base engineering requirements at Hurlburt Field, Florida.

Attachment 21

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER) IDIQ, newest first.
File Type Posted
Attachment_09c_Revised_SEED_Project_SOW_Replacing_Split_Systems_TLF_Bldg_90372,_90374_and_90375.pdf PDF
FA441719RA0020005_SF_30_Amendment.pdf PDF
Attachment_09b_-_REVISED_26_Feb_2019_SOW_Replace_Split_Systems_TLF_Bldgs_90372,_90374_&_90375.pdf PDF
FA441719RA0020004_SF_30.pdf PDF
Attachment_24_-_AF_Form_3064.xls XLS spreadsheet
Attachment_01a_-_SABER_IDIQ_Statement_of_Work.pdf PDF
Questions_and_Answers_-_FA441719RA002.pdf PDF
Attachment_25_-_AF_Form_3065.pdf PDF
Attachment_23a_-_Addendum_Sections_L_and_M_Instructions_to_Offeror_and_Evaluation_Factors_for_Award_1_MAR_19.pdf PDF
FA441719RA0020003_SF30.pdf PDF
MFR_given_to_KTRS.doc DOC document
SABER_Solicitation_Site_Visit_-_26_FEB_19_1030_CST.pdf PDF
Attachment_09a_-_Revised_SEED_Project_SOW_Replacing_Split_Systems_TLF_Bldgs._90372,_90374,_and_90375.pdf PDF
Solicitation_Amendment_FA441719RA0020002_SF_30.pdf PDF
Attachment_23_-_Addendum_Sections_L_and_M_Instructions_to_Offeror_and_Evaluation_Factors_for_Award_11_FEB_19.pdf PDF
Solicitation_Amendment_FA441719RA0020001_SF_30.pdf PDF
Attachment_05_-_Sample_Project_Drawing_A1-Model.pdf PDF
Attachment_23_-_Addendum_Sections_L_and_M_Instructions_to_Offeror_and_Evaluation_Factors_for_Award.pdf PDF
Attachment_10_-_SEED_Project_WORK_TIME_ANALYSIS.pdf PDF
Solicitation_-_FA441719RA002.pdf PDF
Attachment_03_-_Sample_Project_-_SOW_-_Repair_Room_102_Bldg_X.pdf PDF
Attachment_02_-_Hurlburt_Base_Master_Specifications.pdf PDF
Attachment_07_-Sample_Project_Drawing_M1-Layout1.pdf PDF
Attachment_15_-_SEED_Project_Drawing_M-3.pdf PDF
Attachment_17_-_SEED_Project_Drawing_P-2.pdf PDF
Attachment_12_-_SEED_Project_Drawing_A-2_Floor_Plan_and_Finish_Schedule.pdf PDF
Attachment_09_-_SEED_PROJECT_SOW_Replace_Condensing_Units_TLF_Bldgs.pdf PDF
Attachment_11_-_SEED_Project_Drawing_A-1_Floor_Plan.pdf PDF
Attachment_04_-_Sample_Project_-_WORK_TIME_ANALYSIS.pdf PDF
Attachment_22_-_Additional_Contractor_Information.pdf PDF
Attachment_18_-_SEED_Project_Drawing_P-3.pdf PDF
Attachment_01_-_SABER_IDIQ_Statement_of_Work.pdf PDF
Attachment_06_-_Sample_Project_Drawing_E1-Model.pdf PDF
Atch_19_-_Wage_Determination_-_Building_FL217_-_Heavy_FL127_-_Highway_FL179_-_Residential_FL76.pdf PDF
Attachment_08_-_Sample_Project_Drawing_T1-Model.pdf PDF
Attachment_20_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_14_-_SEED_Project_Drawing_M-2.pdf PDF
Attachment_16_-_SEED_Drawing_Project_P-1.pdf PDF
Attachment_13_-_SEED_Project_Drawing_M-1.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 21

FA4417-19-R-A002

Financial Reference Worksheet

FINANCIAL INSTITUTION REFERENCE SHEET

Instructions to Contractor: Include with your proposal a reference sheet for each financial institution that you have a business account with. This sheet may be sent to the banking institution/s in regards to a determination of contractor responsibility as part of the evaluation for award of this solicitation.

TO BE FILLED OUT BY CONTRACTOR:

COMPANY’S NAME: ____________________________________________________________

Point of Contact (POC) Name: _______________________________________________ POC Phone Number: __________________________________________________________

INSTITUTION NAME: __________________________________________________________

POC name: __________________________________________________________________ POC title: _________________________________________________________________ POC phone number: ______________________ fax number: _______________________

I give permission for the following information regarding my account/s at your institution to be released to representatives of the 1st Special Operations Contracting Squadron, Hurlburt Field, FL.

_____________________________________________________________________
Name/TitleSignature/Date

DO NOT HAVE THIS SECTION FILLED OUT. IF YOUR FIRM IS SELECTED AS THE POTENTIAL AWARDEE, THIS FORM WILL BE SENT TO YOUR BANKING INSTITUTION FOR COMPLETION.

TO BE FILLED OUT BY FINANCIAL INSTITUTION:

Please give amounts as a range – i.e. low four figures, mid six figures, etc.

Average monthly balance in checking: ________________ Average monthly balance in savings: _________________ Amount of any current loans: ______________ Amount of any lines of credit: ______________ Any late payments or NSF’s? ______________ How long with this institution: ______________ Credit rating with this institution: ______________

I verify that the information provided above is current as of ____________.

_____________________________________________________________________
Name/TitleSignature/Date

File details come from the government source that posted it. Updated .