Attachment_03_-_Sample_Project_-_SOW_-_Repair_Room_102_Bldg_X.pdf
PDF 273 KB Posted
- Attached to
- Simplified Acquisition Base Engineer Requirements (SABER) IDIQ Federal contract opportunity
- Solicitation number
- FA441719RA002
About this file
This statement of work outlines repair requirements for Room 102 in Building X at Hurlburt Field, Florida under the Simplified Acquisition Base Engineer Requirements indefinite delivery/indefinite quantity contract. The contractor will provide all labor, materials, equipment, design, and supervision to complete architectural, civil, mechanical, and electrical work. Architectural work includes removing and replacing carpet, ceiling tiles, a door and frame, along with installing new flooring, baseboards, and painting. Civil work consists of removing an existing equipment pad and installing a new larger one. Mechanical work is removing an old heat pump and supplying a new smaller unit. Electrical work comprises removing outdated lighting fixtures and installing new LED exit signs and recessed lights. The contractor must adhere to all specification and documentation requirements and obtain necessary permits from the Department of the Air Force Special Operations Command, which issued the SABER IDIQ contract under which this statement of work was released.
Attachment 03
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
CP1010101
Title: Repair Room 102, Bldg. X Date: 27 Nov 2018
1. GENERAL
1.0 The following Statement of Work is for a SABER task order to be accomplished by the contractor in accordance with the requirements of the Hurlburt Base Master Specifications (HBMS), and the SABER Contract.
1.1 The contractor shall provide all plant, labor, materials, equipment, design, and supervision necessary to Repair Room 102, Bldg. X. All work shall be done in accordance with the requirements contained in the Hurlburt Base Master Specifications, SABER Contract and the Statement of Work. Contractor shall provide a projected schedule of all submittals and a project construction schedule upon award of the contract.
1.2 Contractor and all subcontractors must fully comply with specification section 01 00 00, General Requirements. All forms referenced, notarized statements, construction data worksheets, contractor progress reports, contractor compliance statements, etc. must be provided to the contracting officer at the appropriate time as indicated within the specification.
1.3 Contractor should refer to Hurlburt Base Master Specifications, for guidance on the documentation needed to fulfill the requirements of the SABER task order.
1.4 A Cost Estimate shall be accomplished using the 2019 Means Book. Non pre-priced items should be identified as such on the estimate.
1.5 Contractor shall obtain all necessary permits and work clearances, including underground utilities PRIOR to start of work.
1.6 Contractor shall coordinate work closely with Contracting Officer or, representative, as well as the CE project manager on all issues pertaining to work phasing, scheduling, planning, and execution.
1.7 The contractor will provide the names of all workers to the building manager and security officials of the building. (Not required for sample project but is required for majority of task orders).
1.8 All workers from the contractor and sub contractors will be informed on the specific security issues and operating practices of the building and will comply.
1.9 Any work done after duty hours, weekends or holidays will be coordinated with requestor and building manager.
1.10 All close out documents (see section 01 70 00) must be submitted to contracting officer prior to final inspection. Government will withhold 3% of contract sum until project is complete and has been accepted by the Government.
2. LOCATION
2.0 The project site is located on Hurlburt Field, Florida at buildings Bldg. X.
3. MATERIALS
3.0 Contractor shall refer to the SABER specifications for guidance in selecting appropriate materials to accomplish the work.
3.1 Contractor to provide submittals for all materials.
3.2 If the Contractor suggests the use of a specific material not listed in the specifications, which the Government might consider to lessen the cost or increase the utility or appearance of the facility, the material should be listed under Alternatives as described in the SABER contract.
4. PROJECT ELEMENTS
4.0 The project will contain, but is not limited to, the following elements:
4.1 Architectural
4.1.1 Remove and dispose of existing carpet square flooring.
4.1.2 Remove and dispose of all existing rubber cove base.
4.1.3 Support existing 20 linear feet of sprinkler system piping and 2 fire alarm devices.
4.1.4 Remove and dispose of existing 2’ x 2’ acoustical ceiling grid and tile.
4.1.5 Remove and dispose of existing exterior 3’ x 7’ hollow metal door and 5 ¾” metal frame.
4.1.6 Remove and dispose of existing door hardware consisting of lockset, door closer, 1 ½ pair hinges, and threshold.
4.1.7 Provide and install 2’ x 2’ tegular acoustical ceiling grid and tiles.
4.1.8 Cut new tiles where required for sprinkler heads and 2 fire alarm notification devices.
4.1.9 Provide and install new welded 5 ¾” hollow metal galvanized door frame and 3’ x 7’ hollow metal galvanized door.
4.1.10 New hardware to consist of heavy duty lever handled lockset with removable core, heavy duty door closer, door silencers, 1 ½ pair of stainless steel hinges, door sweep, 3’ x 6” wide aluminum threshold, drip edge, 10” x 34” stainless steel kick plate, and extruded aluminum weather-stripping.
4.1.11 Install acrylic latex caulking/sealant around new door frame and wall, both sides.
4.1.12 Provide and install new 18” x 18” carpet tile flooring.
4.1.13 Provide and install new 4” high rubber cove base.
4.1.14 Prepare and prime all walls, apply 2 coats of paint up to 9’-0”.
4.1.15 Paint both sides of existing doors, including frame and trim.
4.2 Civil
4.2.1 Remove and dispose of existing 3’ x 3’ x 4” thick equipment pad for existing heat pump.
4.2.2 Provide and install a new 4’ x 4’ x 6” thick equipment pad for new heat pump.
4.2.3 Reinforce new equipment pad with #3 rebar 12” O.C. each way.
4.3 Mechanical
4.3.1 Remove and dispose of existing 5 ton heat pump.
4.3.2 Provide and install a new 2 ton heat pump.
4.4 Electrical
4.4.1 Remove and dispose of existing exit light.
4.4.2 Remove and dispose of 4 existing 2’ x 4’ recessed fluorescent lighting fixtures.
4.4.3 Provide and install new LED exit light with battery unit.
4.4.4 Provide and install 6 new 2’ x 2’ recessed 4200 lumen LED light fixtures.
4.4.5 Install 2 emergency ballasts. One in each light fixture by existing doors.