This notice announces a competitive Multiple Award Construction Contract solicitation seeking general construction services for the 375th Contracting Squadron at Scott Air Force Base, Illinois. The solicitation will be a 100% small business set-aside with an 8(a) reserve and issue on or around March 17, 2014. The MACCs will have a maximum value of $60 million over five years and support task orders ranging from $2,000 to $5 million each for maintenance, repair, renovation, minor and new construction projects. The government may award up to nine contracts comprised of up to five small businesses and at least four 8(a) contractors. The solicitation will include a sample $250,000 to $500,000 seed project. Offerors must be registered in the System for Award Management to be considered for award.
RFIs (as of 16 April 2014)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MACC_JA_-_Redacted.pdf | ||
| Letter_of_Clarification_Re_Sample_Price.pdf | ||
| FA4407-14-R-0001-0002 _Amendment_2-_Extend_Proposal_Due_Date.pdf | ||
| RFI_Response_Sheet_(17_April_14).pdf | ||
| 150_1st_Floor.pdf | ||
| RFIs-as_of_17_April.pdf | ||
| 150_2nd_Floor.pdf | ||
| Bldg_150_Patio_site_Plan_(2).pdf | ||
| 150_Basement.pdf | ||
| Building_150_Misc_ACM_Sampling.pdf | ||
| FA4407-14-R-0001-0001 _Amendment_1-_Update_SOW.pdf | ||
| Sign-in_sheet.pdf | ||
| RFI_Response_Sheet_(14_April_14).pdf | ||
| Preproposal_Conference.pdf | ||
| Attachment_B_(REV_4-2-14)_Statement_of_Work.pdf | ||
| Map_to_Auditorium.pdf | ||
| RFI_Response_Sheet_(4_April_14).pdf | ||
| RFI_Response_Sheet_(31_Mar_14).pdf | ||
| RFI_Response_Sheet_(27_Mar_14).pdf | ||
| RFI_Response_Sheet_(26_Mar_14).pdf | ||
| MACC_Sample_Project-Repair_Roof_and_Balcony_of_Essex_House.pdf | ||
| FA4407-14-R-0001 _MACC_Solicitation.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses to Requests for Information (RFI) FA4407‐14‐R‐0001, Multiple Award Construction Contract
# Question Date
Submitted Response
1 In regards to the RFP for FA4407‐14‐R‐0001 MACC at Scott AFB, IL, the instructions say that there will be awards made to 8(a) offerors as well as Small Business offerors. Now, the 8a offerors must have a registered office in Illinois or Missouri. But does this also apply to the Small Business offerors? Or can the Small Business offerors be based anywhere in the United States?
24 March 14
That is correct; the geographic restriction applies to 8(a) offerors only. This geographic restriction does not apply to small businesses.
2 Our Team is starting on our submission for the MACC IDIQ at Scott AFB and want to ensure that we understand the set aside. We are a certified SDVOSB serviced by the Kentucky District office. We are NOT an 8(a). Would we still qualify to bid for a position as one of the five (5) small business general construction contractors?
25 March 14 Yes, certified small disadvantaged veteran owned small businesses (SDVOSB) are allowed to submit a proposal.
3 Solicitation, Offer and Award item 7 states the address and Bldg 50. Exhibit 1 RFP item #3 Proposal Due Date:
states the address and Bldg 52. Please clarify the correct building?
26 March 14 Please reference Exhibit 1, Item #3 for proposal submission procedures, which states, "Proposals are due by 2:00 P.M. CST, 24 April 2014 to the 375th Contracting Office, 201 E. Winters St., Bldg 52."
4 The SOW 2.0.B.1 states our proposal is to include a survey to identify asbestos and lead paint for the proposed work area. If we are to do this we will have cut into the roof and various other places to get samples.
Who is responsible for the repairs to the sample areas.
And this statement means that each contractor bidding this work has to conduct their own survey. Please clarify.
26 March 14 Please include in your proposal the total cost to conduct an environmental survey of the proposed work area. The environmental survey (including obtaining any samples) will be conducted "after award".
Updated on 27 March 2014@0949 5 The first page of the RFP item B states four 8a contractors and five small business contractors are to be selected for this MACC. However, on the same page item C states the 8a firms are to have a bona fide office
27 March 14 The geographical restriction applies to the 8(a) contractors only.
within the geographical area. Does this also apply to the other 5 small businesses?
6 Solicitation, SF 1442, Block 13, item B states that an offer guarantee is required; Sample Project RFP page 2 of 11, item #5 states an offer guarantee is not required.
Can you please clarify if a bid bond is required for the Sample Project?
27 March 14 Please reference Section L: Instructions to Offerors; Para L‐1.10, "Note to Offerors: Funds are NOT currently available for the sample project. No award of a task order will be made until funds are available. In the event the sample project is funded, Performance and Payment bonds are required no later than 10 calendar days after award of a task order. Offerors providing less than 120 calendar days for Government acceptance after the date offers are due may not be considered and may be rejected.
7 SF 1442 states Original and 2 copies to be submitted.
Page 53 of 129 states one original and one copy. Please clarify.
27 March 14 Please reference SF 1442, Section 13 (A), "Sealed offers in original and 1 [sic] copies to perform the work required are due at the place specified...". To clarify, submit one original and one copy of the proposal.
8 Section L‐2.1 States the response shall consist of two (2) separate parts: Part I – Contract Documents; Part II – Technical Narrative; and Part III – Past Performance Information. Should this read three(3) separate parts or are we to not submit one of the three?
27 March 14 There are actually three parts: : Part I – Contract Documents; Part II
– Technical Narrative; and Part III – Past Performance Information.
Please submit three parts.
9 Requirement: A cover sheet indicating section number, section title, copy number, RFP identification and the offeror’s name shall be prepared for each section and the sections are to be paper clipped etc. Since these sections are also included in specific Parts (such as Section G and Annual Reps & Certs are included in Part 1 Contract Documents) are we to clip the Parts together to include these paper clipped sections?
26 March 14 Yes, clip the parts together to include the applicable paper clipped sections.
Updated on 31 March 2014@0745 10 The Memorandum for Bidders states that questions are to be submitted no later than 14 April 2014. Page 50 of 27 March 14 Please reference the solicitation, L‐1.1, "In order to make the conference as productive as possible, all prospective offerors are the RFP (p. 52 of the PDF) states that questions are to be submitted no later than COB, 02 April 2014. Given that the site visit is 09 April 2014, please clarify which of the dates is correct as the deadline for submittal of questions.
asked to submit any questions they may have in writing to lemonica.williams@us.af.mil no later than COB, 2 April 2014. The submission of written questions will not preclude anyone from posing questions during the conference."
Offerors may submit questions after 2 April 14; however, any questions received after 14 April 14 will not receive a response.
11 In Part III, Past Performance Information, c. Performance Surveys, it states “The government will contact references from those provided and request answers/feedback to questions listed on the past performance questionnaire (Reference Section J, Attachment 3, Past Performance Questionnaire).” It then further states, “This questionnaire is provided to the offeror for informational purposes only.” Please clarify if the Offeror is to fill out the top portion of the Past Performance Questionnaire and include with the proposal.
27 March 14 No, the past performance questionnaire is for your informational purposes only. The offeror is not required to fill out the form.
12 We are an 8(a)/Small Business with multiple company names under the same ownership. The company names differentiate the 8(a) entities from the Small Business entities. We are intending to propose on the MACC solicitation as a Small Business; however much of our past performance is for work performed under our 8(a) entity. How will our past performance be rated?
27 March 14 Since all entities maintain the same ownership, your past performance will be evaluated as one company.
13 We are an 8(a)/Small Business with multiple company names under the same ownership. The company names differentiate the 8(a) entities from the Small Business entities. We are intending to propose on the MACC solicitation as a Small Business; however much of our past performance is for work performed under our 8(a) entity. How will our past performance be rated? The memorandum for the above referenced solicitation
27 March 14 Offerors were asked to submit questions by 2 April 14 so that the conference is productive as possible; however, offerors may submit questions up to 14 April 14.
states that questions are due to you no later than April 14, 2014. However, in the Instructions to Offerors, Section L1.1, it states questions are due to you no later than April 2, 2014. When is the last day to submit questions?
14 The memorandum for the above referenced solicitation states that questions are due to you no later than April 14, 2014. However, in the Instructions to Offerors, Section L1.1, it states questions are due to you no later than April 2, 2014. When is the last day to submit questions?
28 March 14 Offerors were asked to submit questions by 2 April 14 so that the conference is productive as possible; however, offerors may submit questions up to 14 April 14.
15 We have teamed with a design firm for this IDIQ MACC.
Are we allowed to submit six (6) projects for the prime contractor and six (6) projects for the design team member? Or must we submit a total of six (6) projects to include those of the design member?
28 March 14 You are allowed to submit up to six projects.
16 Of the six contracts performed requirement, can previous IDIQ Task Orders be submitted as one Contract which would equal one (1) of the six examples or will each task order be considered equal to one (1) project example?
28 March 14 Each task order is considered one project example.
17 For Part III, Past Performance Information, b. Quality and Satisfaction, can we submit previously completed PPQs as information to demonstrate customer satisfaction and quality of the completed product?
28 March 14 You may provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of the completed product for relevant past efforts/contracts (similar in scope and magnitude of effort and complexities to this solicitation). Please ensure the name of the reference and his/her contact information is clearly stated on the submission.
Updated on 4 April 2014@1330 18 Will the 8(a) pool of MACC contractors be permitted to bid on the small business projects as well, or only on the 1 April 14 It is the government's intent to allow 8(a)'s to propose on all contracts; however, this decision is at the Contracting Officer's projects set aside for the 8(a) pool? discretion and will be based on the complexity of each task order.
19 Reference Section G ‐ Contract Administration Data, paragraph 1.2: Can you please clarify that the first block (Name & Title) is not the company name. If it is not the company name, whose name and title would be listed here? Are you looking for just a company POC, or would this be the president/CEO of the firm, or someone else in particular?
1 April 14 Please provide the company's POC information in this section.
20 Reference paragraph L‐1.2: This paragraph says, in part, that if we are a joint venture, we must "provide all required solicitation information for all parties including a copy of the joint venture agreement with proposal."
First, what information is encompassed in "all required solicitation information"? Second, where in our proposal do we place the JV agreement?
1 April 14 Please reference the RFP cover sheet, as well as section L for solicitation requirements. The joint venture agreement should be placed in Sec K.
21 Reference the cover letter and paragraph L‐2.2, Part I ‐ Contract Documents: The cover letter to the solicitation indicates we are to provide a "Sample Project Schedule."
However, the paragraph L requirements do not list a schedule. Is a project schedule required and, if so, where in our proposal do we place it? Also, the cover letter provides, as an example, the AF Form 3064. If a project schedule is required, are we required to use this form or may we provide a CPM (critical path method) schedule?
1 April 14 Yes, a sample schedule is required; however, offerors are not required to use the AF Form 3064 and may provide an equivalent form that thoroughly reflects the sample project schedule. Submit this information with Part 1: Contract Documents.
22 Reference paragraph L‐2.2.a: This paragraph says, in part, we are to "Complete the necessary fill‐ins and certifications in Sections I through K." The only fill‐in information (other than Section K) that we can locate is for a post‐award requirement (FAR 52.219‐28) and FAR 252.204‐7007, which is included in Section K, Representations, Certifications and Other Statements of Offerors. We believe the only required information is contained in Section K. Can you confirm? If you cannot
1 April 14 Complete the applicable fill‐ins in sections I‐K.
confirm, do you want the entire Section I (Section J has no fill‐ins).
23 Reference paragraph L‐2.2, Part III ‐ Past Performance Information: Must projects be fully complete, or can they be substantially complete? If the latter, what is considered "substantially complete"?
1 April 14 The projects do not have to be complete.
24 Reference paragraph L‐2.2, Part III ‐ Past Performance Information: Are horizontal construction projects (e.g., pavements, utilities, roads, parking lots) considered relevant for this contract?
1 April 14 No, horizontal projects are not relevant to this contract.
25 Reference paragraph M‐4.0: This paragraph says, in part, that "Relevant performance includes efforts that involved similar or greater scope of magnitude of effort and complexities than this solicitation requires." Further in the paragraph it states: "relevant performance includes projects up to approximately $5M." If we comply with the first portion of this paragraph and provide projects that are in excess of $5M, will they be rated as highly as projects that are up to $5M?
1 April 14 No, projects in excess of $5M will not be considered as relevant as projects between $2K and $5M.
26 With regard to the subject proposal, is there a specific form that should be used for Part II – Technical Narrative and Part III – Past Performance Information, or should these be free‐form on our company letterhead?
1 April 14 No, there are no specific forms required.
27 In the cover letter of the RFP, Item 4, e, it states that a sample project schedule (Ex AF 3064 Progress Schedule) is required. However, this item is not listed within the main body of the RFP, Section L, Instructions to Offerors.
Is a project schedule for the sample project required to be submitted with the proposal?
2 April 14 Yes, a sample project schedule is required.
28 Section 1.5, Page 12, Competition‐ Are set‐aside task orders limited to the 8a contractors, or will the government set aside task order for the Small Business contractors also?
2 April 14 It is the intent of the government to allow 8(a) offerors to propose on all solicitations; however, the final decision will be based on the complexity of the project and is at the discretion of the Contracting Officer.
29 Section 1.6, Description of Subsequent Task Orders‐ Are there particular types of buildings or infrastructure projects that are known at this time, that will be issued as task orders under the MACC?
2 April 14 No, this information is not currently available.
30 L‐2.3, i. Page Size and Format‐ The RFP states that pages shall be spaced/typed with double line spacing. The technical narrative is limited to 3 pages. In order to provide a thorough narrative demonstrating an overall understanding of the sample project, can single line spacing be utilized for the technical narrative?
2 April 14 No, double spaced is required.
31 L‐2.3, i. BINDING AND LABELING: "Sections shall be bound with a paper clip, paper fastener, paper binder, or simply placed in envelope in section and page order, unbound, without hole punches. Proposals that do not meet these parameters may be considered nonresponsive and removed from further consideration." If placed in an envelope, does Part I ‐ Contract Documents that contain the Sample Project Price Proposal need to be in a separate and sealed envelope from Part II ‐ Technical Narrative and Part III‐ Past Performance Information?
2 April 14 If placed in an envelope, separate the proposal by "sections and page order."
32 M‐4.0, Performance Confidence Assessment‐ Will projects above $5M be considered relevant for project magnitude?
2 April 14 Projects in excess of $5M is will not be considered as relevant as projects between $2K and $5M.
33 Exhibit 1, Attachment A‐ Price Schedule‐ "Provide pricing detail and breakdown of all costs; to include, but not limited to a breakdown of the prime contractors labor, materials, direct and indirect cost, overhead and profit;
subcontractor costs (including evidence of subcontractor competition; breakdown of all material costs, labor costs, etc.). Failure to provide supporting documentation may result in exclusion from further consideration."
2 April 14 No, the government does not require a specific format for the price schedule.
Does the government require the price breakdown in a particular format (e.g. excel spreadsheet)?
34 Exhibit 1, Attachment A‐ Price Schedule‐What kind of information is the government requesting for evidence of subcontractor competition?
2 April 14 The government must ensure the pricing is fair and reasonable;
therefore, any evidence of subcontractor competition is appropriate (EX: competitive quotes).
35 Exhibit 1, Attachment A‐ Price Schedule‐ "Provide pricing detail and breakdown of all costs; to include, but not limited to a breakdown of the prime contractors labor, materials, direct and indirect cost, overhead and profit;
subcontractor costs (including evidence of subcontractor competition; breakdown of all material costs, labor costs, etc.). Failure to provide supporting documentation may result in exclusion from further consideration."
"Does the breakdown of all material costs refer to the subcontractors costs or is this the same information that is requested for the prime contractors labor, material, direct, and indirect information in the sentence previous to this?
2 April 14 The Prime costs must be broken down, as well as the subcontractor costs.
36 What is the period of performance for the sample project?
2 April 14 The offeror will determine the amount of time required to complete the project and will annotate the information on a project schedule (EX: AF Form 3064).
37 Under section B of the Supplies or Services and Prices(Page 3‐5 of 56) do we need to enter any amounts for the base or option years?
2 April 14 No, please do not enter any information in this section.
38 Regarding the 3 page limit on the technical proposal are we allowed to include drawings and a schedule as an attachment in addition to the 3 pages?
2 April 14 Yes, you may include drawings with your technical proposal;
however, the schedule will be submitted with Part 1: Contract Documents.
39 Are there any liquidated damages on the seed project or future task orders?
2 April 14 The sample project does not include liquidated damages because it is currently unfunded. Future task orders may include liquidated damages depending on the dollar amount.
40 What type of baseboard (wood, vinyl, or other) is to be installed in the office area?
2 April 14 UPDATED:
3" Vinyl cove base. Color yet to be determined by CE.
41 Section 3(i) states the contractor shall patch all interior walls in the office and storage areas to smooth finish.
Are the existing walls plaster or drywall?
2 April 14 UPDATED:
Yes, Plaster in the storage area and drywall in the office. Upon removal of the drywall, paneling in the office, patch any deteriorated plaster as needed and paint.
42 Is there a specification for the ceiling tile and grid we are to install?
2 April 14 UPDATED:
Yes. USG Sandrift ClimaPlus FL 809 White, 2’X2’X3/4” Grid B
Updated on 14 April 2014@0915 43 Please clarify if a Bid Guarantee/Bond is to be submitted with the proposal. The SF1442 states that it is required, however Exhibit 1 states that an offer guarantee is NOT required.
8 April 14 A bid guarantee is not required.
44 Reference solicitation page 53 of 57, Part III, paragraph
a. viii: This paragraph instructs us to provide information for the contracting officer. Must it be the contracting officer, or can it be another person who has in‐depth knowledge of the project, e.g., a project engineer or a COR?
8 April 14 No, it does not have to be a Contracting Officer; it can be another person who has in‐depth knowledge of the project.
45 What are we to put in block 14 under "Code" and "Facility Code" box?
9 April 14 You do not have to fill out block 14 under "Code" and "Facility Code".
46 The way I understand it,there has only been 1 Amendment (dtd 7 Apr) issued. The rest are RFI/s/?
Please confirm.
9 April 14 Yes, there was one amendment made to this solicitation which was the updated SOW.
47 Past Performance Information requests projects within the past 3 years. To better represent a contractors range of work, can past performance be expanded to last five or six years?
9 April 14 Past performance submissions are limited to projects completed or ongoing within the last three years.
48 Reference page 53 of 56, Part III, paragraph b.: In part, this paragraph tells us to submit information which demonstrates positive customer satisfaction with overall job performance for projects that are similar in scope, effort, and complexity. Does this apply to only those projects highlighted in paragraph “a.” of this Part, or may we submit positive feedback on any similar project?
10 April 14 You may submit positive feedback on similar projects.
49 Reference page 52 of 56, L‐2.2, Part 1, paragraph e.
which states: “Annual Reps and Certs (ORCA)”. Are we to provide an ORCA printout from the SAM.gov website, or is this the Section K Reps & Certs that we are to provide?
10 April 14 You do not need to provide an ORCA printout from www.sam.gov.
Paragraph e, "Annual Reps & Certs" should be included in Section K.
50 On page 54 of the RFP at the end of the first paragraph it says, “These general limitations shall apply to both electronic and paper copy proposals.” – I just want to clarify that there is NO requirement for an electronic version of the proposal to be sent in.
11 April 14 There is not a requirement for electronic proposals.
51 In question 21, you mentioned that the Sample Project Schedule should be included in Part I: Contract Documents. Is there a specific location within Part I where this should go?
11 April 14 You may submit the schedule behind the price (part Id).
52 Would it be possible to change the title of Part I. D.
Sample Project Price to read Part I. D. Sample Project and further divide that into Part I.D.1 Sample Project Price and Part I.D.2 Sample Project Schedule?
11 April 14 No
53 In question 22, someone asked about sections I and J and if we needed to include them if there is nothing to fill out. The following question was not answered ‐ Do you want both of these sections in their entirety included in the proposal or only the parts that have fill‐in information. And if there is no fill‐in information, can we leave these two sections out. ALSO is there a specific
11 April 14 Please submit " only the parts that have fill‐in information." If there is no fill‐in information, you may leave those sections out. Submit this information in Part I(a).
location within Part I: Contract Documents that Sections I and J should go? (NOTE – I am not asking about Section K as I already know that this is to be included in its entirety).
54 On page 54 of the RFP, in the second paragraph, it is indicated that a cover sheet is required for each section.
By section do you mean Part I, Part II, Part III or do you mean the individual requirements for each of the parts (for ex. using Part I do you want a cover sheet, sf1442;
cover sheet, joint venture; cover sheet, section G)? (Do you want Cover Sheet for Part I, followed by all the requirements of Part I; Cover sheet for Part II, followed by all the requirements of Part II; Cover sheet for Part III, followed by all the requirements of Part III)
11 April 14 A cover sheet indicating the section number: Part I; section title (a, b, c, or d) and further broken down in accordance with the instructions listed in Section L‐2.
55 Where in Part I would the any Teaming Partner Information go? Do you want the relevant information to go under I.C Section G, Contract Administration Data or should we include it, as well as the actual agreement in a new subcategory: I.G Teaming Agreements
11 April 14 This information should be submitted with the information in Part I (b).
56 You mentioned below that the teaming information should go in Part 1 (b). If we are not submitting under a Joint Venture, can we change the title of Part 1 (b) from "Joint Venture" to "Team Arrangements" or something similar?
14 April 14 Yes, you may.
57 Does the definition of a “general construction contractor” include an environmental consulting firm such as us? We would be interested due to the asbestos and lead consulting.
14 April 14 This acquisition is intended for any general construction contractors under the NAICS code 236220.
Updated on 16 April 2014@1030 58 Under Part III, Section b is there a limit to how many 14 April 14 PART III –PAST PERFORMANCE INFORMATION: Paragraph (b); No, documents we can provide for a project and also is there a limit to how many different projects we can include documents for?
there is no limit to the amount of documents you may provide or the amount of different projects you may submit. However, all submissions must be within the last three years and similar in scope and magnitude of effort and complexities to this solicitation.
59 If the offeror is currently registered in CCR and has completed the ORCA electronically, do we need to submit all of Section K with our proposal?
14 April 14 Yes, Section K must be turned in (in its entirety).
60 What are the page limitations of the total proposal 14 April 14 The total proposal does not have a page limit.
61 you state to submit no more than 6 projects for reference, is there a minimum requirement? how many do you plan to review?
14 April 14 There is not a minimum requirement of references that you may submit; the Contracting Officer will review up to six references.
62 pls confirm that we need to include the cost only of an environmental survey for the seed project in our estimate. It is assumed that the survey will be done after award and all work and costs of any abatement work will be treated as an additional cost after the survey is conducted.
14 April 14 Yes, you are correct.
63 can we use the same reference contact for different projects?
14 April 14 Yes, you may use the same reference; however, this is not encouraged. The purpose of past performance evaluations are to gain information regarding your company from varying sources.
64 Reference is made to Exhibit 1, Attachment A, CLIN 0001, Description which reads:
Furnish all labor, materials, equipment, services, and supervision required to replace the roof, balcony and concrete edge (wrought iron and support) of Bldg 150, Essex House
Reference is also made to the SOW, various items of work listed on pages 2 to 4. Many work items listed in the SOW, such as; environmental survey, interior demolition, new interior construction, exterior demolition, landscaping and power washing do not
14 April 14 Please include pricing for all items listed in the SOW in CLIN 0001.
seem to fit the description as provided in Exhibit 1, Attachment A, CLIN 0001. Should pricing for all items listed in the SOW be included in the price proposal or just those that are included in CLIN 0001? If all items in the SOW should be included; should those costs be included as part of CLIN 0001?
65 Which offices get carpet tile on floor, both first and second floors?
8 April 14 Only the office area on the first floor will get new carpet. The storage area floor will not be changed.
66 Has a baseboard or cove been decided yet? 8 April 14 3" Vinyl cove base. Color yet to be determined by CE.
67 Are the bathrooms having any changes? What type of flooring is currently in them so we can determine the type of trim needed?
8 April 14 The bathrooms are not included in this project.
68 Who will do the existing flooring removal? 8 April 14 The contractor will remove the carpet and dispose of properly.
69 Whom is responsible for relocating the furnishings and items stored inside the storage room and office? Are the wood lockers going to be removed or left in place?
11 April 14 The customer will remove all items from the office and storage area.
70 SOW calls for all brick pavers on the back patio to be removed and replaced with new but at the pre‐proposal site visit we were told to just replace the broken or cracked bricks, can you clarify the specific extent of brick replacement? If we are to replace just a portion, what is the criteria for replacement; settling, heaving, chips, cracks, etc?
11 April 14 Replace all paver bricks.
71 What areas specifically get hand graded? 11 April 14 Only the areas where the grass is bare where new sod will be placed.
72 Are the roof pavers to follow the slope of the roof or be installed level across the balcony?
11 April 14 Install roof pavers level across the sloped roof.
73 Do you have any past environmental surveys of the building you can provide?
11 April 14 See attached sampling results/report. (uploaded to www.fbo.gov on 16 April 2014)
74 What type of baseboard is to be used, wood or vinyl? 11 April 14 Vinyl 3” 75 Can you provide a specification for the ceiling tile to be used, SOW says to match existing but the office is 2x2 and the storage rooms are 2x4?
11 April 14 The specification for the ceiling tile are for the storage, vestibule and office rooms are as follows: “USG Sandrift ClimaPlus FL 809 White, 2’X2’X3/4” Grid B.
76 Are we to include any painting at the interior window sills, window casing, door casing, doors, etc?
11 April 14 Yes
77 What is the warranty requirement on the EPDM roofing?
The contractor shall warranty the material for 20 years and the installation warranty for five (5) years.
11 April 14 The contractor shall warranty the material for 20 years and the installation warranty for five (5) years.
78 Is any work taking place in the vestibule that separates the office and storage areas?
11 April 14 Other than the ceiling being replaced to a 2x2. See response to question above.
79 SOW 2.0 Scope B.2. Demolition paragraph "l" states to remove and replace with new brick pavers match as closely as possible. B.3. Installation paragraph "n" states to install new brick pavers where they are removed from the joints. These statements contradict the scope of work. In addition after walking the project at the prebid it's even more confusing because the note in the installation that says "install new brick pavers where they are removed from the joints" leaves this very discretionary and almost impossible to quantify. Please clarify the scope of work to be demolished and replaced for the pavers and if we in fact do need new pavers.
11 April 14 Replace all pavers and dispose of existing pavers.
80 SOW 2.0 C referencing the " As‐built drawings. The documents include only a sketch of the work what is going to be required for As‐Builts. Is just plan views with notes acceptable?
11 April 14 Yes, only plan view with notes on work completed.
81 The SOW states the existing handrail is to remain. Does the existing handrail and conduit get painted?
11 April 14 Yes
82 We are to include a cost for a Lead and Asbestos Environmental Survey for our work area. Do we also include a cost for an Abatement plan if any hazardous materials are found?
11 April 14 No cost for abatement, only survey.
83 Scope says to remove carpet for existing office space.
Confirming that this is for (1) office only.
11 April 14 Correct.
84 Scope says to remove wall coverings and paneling in the office and storage areass . Confirming that this is for (1) office only.
11 April 14 Correct, only the office. No paneling or wall covering located in the storage area.
85 Scope says to remove the entire ceiling grid and tiles in the office and storage areas. Confirming that this is for
(1) office only. Or do you want the other (2) rooms included?
11 April 14 The office, vestibule and storage area will have new ceiling grid and tiles.
86 Scope indicates to paint walls. Confirming this is for (3) rooms only. Does painting include door frames, doors, windows and baseboard?
11 April 14 Yes
87 Scope says to install carpet squares in office area only.
Confirming that this is for (1) office only.
11 April 14 Yes
88 Confirm the number of ceiling fans is three. 11 April 14 Yes three (3) ceiling fans.
89 Confirm no ceilings are of the drywall type. 11 April 14 Correct, all ceilings in work area are 2x4 ceiling tile and grid.
90 Clarify if any switches or receptacles will need to be removed for drywall removal and replacement on the walls.
11 April 14 Yes, where outlets and wall switches were, will need to be re‐ installed in new wallboard.
91 On note indicates that we are to hand grade existing grassy areas along the patio borders and within the patio area that are thinning. Most of the areas within the patio area appear to be mulched; are we to include the mulch removal, re‐grading and sod for these areas?
11 April 14 Yes
92 There are two areas within the patio area that have trees; will these areas require the same treatment?
11 April 14 Yes
93 The patio perimeter also appears to me mulched; are we include mulch removal, re‐grading and sod for these areas? I’m concerned with the heights of the trees at these areas, they a setting pretty high in the ground to accommodate any re‐grading without damaging the root systems. I’m also concerned with distance beyond the patio perimeter that will require re‐grading and sod.
11 April 14 Construct borders surrounding the two trees using landscape timber and fill with mulch.
Please provide additional clarification.
94 Demolition Note F indicates that we are supposed to remove all wall coverings in the office and storage areas.
The only place I saw wall coverings was behind (or in the interior of) the cabinets (see attached photo) located along the west wall of the storage room.
Will we be required to remove this wall covering and refinish this area?
11 April 14 The office has wallboard that is covered with fabric. All of this wall board is to be removed and replaced with new wallboard, then painted.
95 There are several broken slabs on the patio – are these to be included in the scope for the patio repair?
11 April 14 Yes, replace broken slabs.
96 The area is to be clear of any office furniture, but in storage room there are a series of custom wood cabinets ‐ will these cabinets be consider office furniture and be removed?
11 April 14 Yes by the customer.
97 The requirement for a 25 year warranty for the roof might be hard to acquire as the threshold of the doors are too low to allow for the proper turnout. Would you accept a warranty for less than 25 years?
11 April 14 Yes. A 20 year material and 5 year installer warranty.
98 Will we be required to obtain approval from a Historical Review Board for the repair of exterior conditions?
10 April 14 Civil Engineering will coordinate with SHPO when the project gets the funding.
99 Should we only price the Hazmat survey/report or should we include an allowance for the abatement of hazardous materials?
10 April 14 Include a price for the survey ONLY. Do not include an allowance.
100 An existing hazmat survey was mentioned during the walk thru, please provide for reference if an allowance should be included.
10 April 14 CES will provide one if available. It was stated that CE wasn’t sure if one has been done for the construction area or not. See attached “Building 150 Misc ACM Sampling.PDF”. This is a consolidation of three separate sampling documents from our environmental office.
101 Will the new ceiling tile and grid be installed at the same 11 April 14 Yes height as existing?
102 Item I in paragraph 3 states that the contractor shall patch all interior walls in the office and storage area to a smooth finish. Is the intent to plaster or drywall the brick walls in the storage area?
11 April 14 No not the brick walls, only the plaster walls and install new drywall in the office with smooth finish.
103 Are there any as‐built available? 11 April 14 Some 104 Who will be responsible for removal, relocation, and storage and reinstalling of Furniture Fixtures and Equipment in the office and storage areas?
11 April 14 The customer.
105 If the contractor is responsible for removal, relocation, storage and reinstallation of FF&E will you provide an inventory so that we can quantify this work?
11 April 14 N/A See response above.
106 Will the office and storage areas be vacated for the duration of construction? Will the rest of building remain in operation?
11 April 14 Yes.
107 Item Q in paragraph3 states the contractor shall install sod over all bare areas along the patio and boarder. Is the project intent to convert all landscape planting beds surrounding the patio area to grass?
11 April 14 Yes.
108 Please confirm that no work is to take place in room between the office and storage areas.
11 April 14 Only replacement of the ceiling grid, tiles and lights.
109 In reference to the SOW item 3i. Do you want all the bead board pulled off the office walls and sanded smooth? Additionally, does the brick wall get filled in and sanded smooth?
11 April 14 Yes, bead board to be removed. The brick wall only gets painted.
No fill or sanding.
110 Is there any maintenance requirements for the sod after installation, or will base personnel water the sodas required?
11 April 14 The contractor will be responsible for maintenance until sod takes root. typically 4weeks is standard.