This document provides details for a Multiple Award Construction Contract solicitation. The 375th Contracting Squadron will issue a 100% small business set-aside solicitation with an 8(a) reserve to provide indefinite delivery/indefinite quantity construction task orders at Scott Air Force Base in Illinois. The contract value is not to exceed $60 million over five years, with individual task order values estimated between $2,000 and $5 million. The solicitation package will include a sample seed project with a value between $250,000 and $500,000. The performance period is from 3 July 2014 through 2 July 2019. Awarded contractors will perform general construction work within NAICS code 236220. The government may award up to nine contracts, with at least four going to 8(a) contractors and up to five to small businesses. Offers will be evaluated using a Performance Price Trade-Off procedure.

Please NOTE Many RFIs will not appear on this list because they have not been answered yet.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Responses to Requests for Information (RFI) FA4407‐14‐R‐0001, Multiple Award Construction Contract

# Question Date

Submitted Response

1 In regards to the RFP for FA4407‐14‐R‐0001 MACC at Scott AFB, IL, the instructions say that there will be awards made to 8(a) offerors as well as Small Business offerors. Now, the 8a offerors must have a registered office in Illinois or Missouri. But does this also apply to the Small Business offerors? Or can the Small Business offerors be based anywhere in the United States?

24 March 14

That is correct; the geographic restriction applies to 8(a) offerors only. This geographic restriction does not apply to small businesses.

2 Our Team is starting on our submission for the MACC IDIQ at Scott AFB and want to ensure that we understand the set aside. We are a certified SDVOSB serviced by the Kentucky District office. We are NOT an 8(a). Would we still qualify to bid for a position as one of the five (5) small business general construction contractors?

25 March 14 Yes, certified small disadvantaged veteran owned small businesses (SDVOSB) are allowed to submit a proposal.

3 Solicitation, Offer and Award item 7 states the address and Bldg 50. Exhibit 1 RFP item #3 Proposal Due Date:

states the address and Bldg 52. Please clarify the correct building?

26 March 14 Please reference Exhibit 1, Item #3 for proposal submission procedures, which states, "Proposals are due by 2:00 P.M. CST, 24 April 2014 to the 375th Contracting Office, 201 E. Winters St., Bldg 52."

4 The SOW 2.0.B.1 states our proposal is to include a survey to identify asbestos and lead paint for the proposed work area. If we are to do this we will have cut into the roof and various other places to get samples.

Who is responsible for the repairs to the sample areas.

And this statement means that each contractor bidding this work has to conduct their own survey. Please clarify.

26 March 14 Please include in your proposal the total cost to conduct an environmental survey of the proposed work area. The environmental survey (including obtaining any samples) will be conducted "after award".

Updated on 27 March 2014@0949 5 The first page of the RFP item B states four 8a contractors and five small business contractors are to be selected for this MACC. However, on the same page item C states the 8a firms are to have a bona fide office

27 March 14 The geographical restriction applies to the 8(a) contractors only.

within the geographical area. Does this also apply to the other 5 small businesses?

6 Solicitation, SF 1442, Block 13, item B states that an offer guarantee is required; Sample Project RFP page 2 of 11, item #5 states an offer guarantee is not required.

Can you please clarify if a bid bond is required for the Sample Project?

27 March 14 Please reference Section L: Instructions to Offerors; Para L‐1.10, "Note to Offerors: Funds are NOT currently available for the sample project. No award of a task order will be made until funds are available. In the event the sample project is funded, Performance and Payment bonds are required no later than 10 calendar days after award of a task order. Offerors providing less than 120 calendar days for Government acceptance after the date offers are due may not be considered and may be rejected.

7 SF 1442 states Original and 2 copies to be submitted.

Page 53 of 129 states one original and one copy. Please clarify.

27 March 14 Please reference SF 1442, Section 13 (A), "Sealed offers in original and 1 [sic] copies to perform the work required are due at the place specified...". To clarify, submit one original and one copy of the proposal.

8 Section L‐2.1 States the response shall consist of two (2) separate parts: Part I – Contract Documents; Part II – Technical Narrative; and Part III – Past Performance Information. Should this read three(3) separate parts or are we to not submit one of the three?

27 March 14 There are actually three parts: : Part I – Contract Documents; Part II

– Technical Narrative; and Part III – Past Performance Information.

Please submit three parts.

9 Requirement: A cover sheet indicating section number, section title, copy number, RFP identification and the offeror’s name shall be prepared for each section and the sections are to be paper clipped etc. Since these sections are also included in specific Parts (such as Section G and Annual Reps & Certs are included in Part 1 Contract Documents) are we to clip the Parts together to include these paper clipped sections?

26 March 14 Yes, clip the parts together to include the applicable paper clipped sections.

Updated on 31 March 2014@0745 10 The Memorandum for Bidders states that questions are to be submitted no later than 14 April 2014. Page 50 of 27 March 14 Please reference the solicitation, L‐1.1, "In order to make the conference as productive as possible, all prospective offerors are the RFP (p. 52 of the PDF) states that questions are to be submitted no later than COB, 02 April 2014. Given that the site visit is 09 April 2014, please clarify which of the dates is correct as the deadline for submittal of questions.

asked to submit any questions they may have in writing to lemonica.williams@us.af.mil no later than COB, 2 April 2014. The submission of written questions will not preclude anyone from posing questions during the conference."

Offerors may submit questions after 2 April 14; however, any questions received after 14 April 14 will not receive a response.

11 In Part III, Past Performance Information, c. Performance Surveys, it states “The government will contact references from those provided and request answers/feedback to questions listed on the past performance questionnaire (Reference Section J, Attachment 3, Past Performance Questionnaire).” It then further states, “This questionnaire is provided to the offeror for informational purposes only.” Please clarify if the Offeror is to fill out the top portion of the Past Performance Questionnaire and include with the proposal.

27 March 14 No, the past performance questionnaire is for your informational purposes only. The offeror is not required to fill out the form.

12 We are an 8(a)/Small Business with multiple company names under the same ownership. The company names differentiate the 8(a) entities from the Small Business entities. We are intending to propose on the MACC solicitation as a Small Business; however much of our past performance is for work performed under our 8(a) entity. How will our past performance be rated?

27 March 14 Since all entities maintain the same ownership, your past performance will be evaluated as one company.

13 We are an 8(a)/Small Business with multiple company names under the same ownership. The company names differentiate the 8(a) entities from the Small Business entities. We are intending to propose on the MACC solicitation as a Small Business; however much of our past performance is for work performed under our 8(a) entity. How will our past performance be rated? The memorandum for the above referenced solicitation

27 March 14 Offerors were asked to submit questions by 2 April 14 so that the conference is productive as possible; however, offerors may submit questions up to 14 April 14.

states that questions are due to you no later than April 14, 2014. However, in the Instructions to Offerors, Section L1.1, it states questions are due to you no later than April 2, 2014. When is the last day to submit questions?

14 The memorandum for the above referenced solicitation states that questions are due to you no later than April 14, 2014. However, in the Instructions to Offerors, Section L1.1, it states questions are due to you no later than April 2, 2014. When is the last day to submit questions?

28 March 14 Offerors were asked to submit questions by 2 April 14 so that the conference is productive as possible; however, offerors may submit questions up to 14 April 14.

15 We have teamed with a design firm for this IDIQ MACC.

Are we allowed to submit six (6) projects for the prime contractor and six (6) projects for the design team member? Or must we submit a total of six (6) projects to include those of the design member?

28 March 14 You are allowed to submit up to six projects.

16 Of the six contracts performed requirement, can previous IDIQ Task Orders be submitted as one Contract which would equal one (1) of the six examples or will each task order be considered equal to one (1) project example?

28 March 14 Each task order is considered one project example.

17 For Part III, Past Performance Information, b. Quality and Satisfaction, can we submit previously completed PPQs as information to demonstrate customer satisfaction and quality of the completed product?

28 March 14 You may provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of the completed product for relevant past efforts/contracts (similar in scope and magnitude of effort and complexities to this solicitation). Please ensure the name of the reference and his/her contact information is clearly stated on the submission.

Updated on 4 April 2014@1330 18 Will the 8(a) pool of MACC contractors be permitted to bid on the small business projects as well, or only on the 1 April 14 It is the government's intent to allow 8(a)'s to propose on all contracts; however, this decision is at the Contracting Officer's projects set aside for the 8(a) pool? discretion and will be based on the complexity of each task order.

19 Reference Section G ‐ Contract Administration Data, paragraph 1.2: Can you please clarify that the first block (Name & Title) is not the company name. If it is not the company name, whose name and title would be listed here? Are you looking for just a company POC, or would this be the president/CEO of the firm, or someone else in particular?

1 April 14 Please provide the company's POC information in this section.

20 Reference paragraph L‐1.2: This paragraph says, in part, that if we are a joint venture, we must "provide all required solicitation information for all parties including a copy of the joint venture agreement with proposal."

First, what information is encompassed in "all required solicitation information"? Second, where in our proposal do we place the JV agreement?

1 April 14 Please reference the RFP cover sheet, as well as section L for solicitation requirements. The joint venture agreement should be placed in Sec K.

21 Reference the cover letter and paragraph L‐2.2, Part I ‐ Contract Documents: The cover letter to the solicitation indicates we are to provide a "Sample Project Schedule."

However, the paragraph L requirements do not list a schedule. Is a project schedule required and, if so, where in our proposal do we place it? Also, the cover letter provides, as an example, the AF Form 3064. If a project schedule is required, are we required to use this form or may we provide a CPM (critical path method) schedule?

1 April 14 Yes, a sample schedule is required; however, offerors are not required to use the AF Form 3064 and may provide an equivalent form that thoroughly reflects the sample project schedule. Submit this information with Part 1: Contract Documents.

22 Reference paragraph L‐2.2.a: This paragraph says, in part, we are to "Complete the necessary fill‐ins and certifications in Sections I through K." The only fill‐in information (other than Section K) that we can locate is for a post‐award requirement (FAR 52.219‐28) and FAR 252.204‐7007, which is included in Section K, Representations, Certifications and Other Statements of Offerors. We believe the only required information is contained in Section K. Can you confirm? If you cannot

1 April 14 Complete the applicable fill‐ins in sections I‐K.

confirm, do you want the entire Section I (Section J has no fill‐ins).

23 Reference paragraph L‐2.2, Part III ‐ Past Performance Information: Must projects be fully complete, or can they be substantially complete? If the latter, what is considered "substantially complete"?

1 April 14 The projects do not have to be complete.

24 Reference paragraph L‐2.2, Part III ‐ Past Performance Information: Are horizontal construction projects (e.g., pavements, utilities, roads, parking lots) considered relevant for this contract?

1 April 14 No, horizontal projects are not relevant to this contract.

25 Reference paragraph M‐4.0: This paragraph says, in part, that "Relevant performance includes efforts that involved similar or greater scope of magnitude of effort and complexities than this solicitation requires." Further in the paragraph it states: "relevant performance includes projects up to approximately $5M." If we comply with the first portion of this paragraph and provide projects that are in excess of $5M, will they be rated as highly as projects that are up to $5M?

1 April 14 No, projects in excess of $5M will not be considered as relevant as projects between $2K and $5M.

26 With regard to the subject proposal, is there a specific form that should be used for Part II – Technical Narrative and Part III – Past Performance Information, or should these be free‐form on our company letterhead?

1 April 14 No, there are no specific forms required.

27 In the cover letter of the RFP, Item 4, e, it states that a sample project schedule (Ex AF 3064 Progress Schedule) is required. However, this item is not listed within the main body of the RFP, Section L, Instructions to Offerors.

Is a project schedule for the sample project required to be submitted with the proposal?

2 April 14 Yes, a sample project schedule is required.

28 Section 1.5, Page 12, Competition‐ Are set‐aside task orders limited to the 8a contractors, or will the government set aside task order for the Small Business contractors also?

2 April 14 It is the intent of the government to allow 8(a) offerors to propose on all solicitations; however, the final decision will be based on the complexity of the project and is at the discretion of the Contracting Officer.

29 Section 1.6, Description of Subsequent Task Orders‐ Are there particular types of buildings or infrastructure projects that are known at this time, that will be issued as task orders under the MACC?

2 April 14 No, this information is not currently available.

30 L‐2.3, i. Page Size and Format‐ The RFP states that pages shall be spaced/typed with double line spacing. The technical narrative is limited to 3 pages. In order to provide a thorough narrative demonstrating an overall understanding of the sample project, can single line spacing be utilized for the technical narrative?

2 April 14 No, double spaced is required.

31 L‐2.3, i. BINDING AND LABELING: "Sections shall be bound with a paper clip, paper fastener, paper binder, or simply placed in envelope in section and page order, unbound, without hole punches. Proposals that do not meet these parameters may be considered nonresponsive and removed from further consideration." If placed in an envelope, does Part I ‐ Contract Documents that contain the Sample Project Price Proposal need to be in a separate and sealed envelope from Part II ‐ Technical Narrative and Part III‐ Past Performance Information?

2 April 14 If placed in an envelope, separate the proposal by "sections and page order."

32 M‐4.0, Performance Confidence Assessment‐ Will projects above $5M be considered relevant for project magnitude?

2 April 14 Projects in excess of $5M is will not be considered as relevant as projects between $2K and $5M.

33 Exhibit 1, Attachment A‐ Price Schedule‐ "Provide pricing detail and breakdown of all costs; to include, but not limited to a breakdown of the prime contractors labor, materials, direct and indirect cost, overhead and profit;

subcontractor costs (including evidence of subcontractor competition; breakdown of all material costs, labor costs, etc.). Failure to provide supporting documentation may result in exclusion from further consideration."

2 April 14 No, the government does not require a specific format for the price schedule.

Does the government require the price breakdown in a particular format (e.g. excel spreadsheet)?

34 Exhibit 1, Attachment A‐ Price Schedule‐What kind of information is the government requesting for evidence of subcontractor competition?

2 April 14 The government must ensure the pricing is fair and reasonable;

therefore, any evidence of subcontractor competition is appropriate (EX: competitive quotes).

35 Exhibit 1, Attachment A‐ Price Schedule‐ "Provide pricing detail and breakdown of all costs; to include, but not limited to a breakdown of the prime contractors labor, materials, direct and indirect cost, overhead and profit;

subcontractor costs (including evidence of subcontractor competition; breakdown of all material costs, labor costs, etc.). Failure to provide supporting documentation may result in exclusion from further consideration."

"Does the breakdown of all material costs refer to the subcontractors costs or is this the same information that is requested for the prime contractors labor, material, direct, and indirect information in the sentence previous to this?

2 April 14 The Prime costs must be broken down, as well as the subcontractor costs.

36 What is the period of performance for the sample project?

2 April 14 The offeror will determine the amount of time required to complete the project and will annotate the information on a project schedule (EX: AF Form 3064).

37 Under section B of the Supplies or Services and Prices(Page 3‐5 of 56) do we need to enter any amounts for the base or option years?

2 April 14 No, please do not enter any information in this section.

38 Regarding the 3 page limit on the technical proposal are we allowed to include drawings and a schedule as an attachment in addition to the 3 pages?

2 April 14 Yes, you may include drawings with your technical proposal;

however, the schedule will be submitted with Part 1: Contract Documents.

39 Are there any liquidated damages on the seed project or future task orders?

2 April 14 The sample project does not include liquidated damages because it is currently unfunded. Future task orders may include liquidated damages depending on the dollar amount.

40 What type of baseboard (wood, vinyl, or other) is to be installed in the office area?

2 April 14 All sample project questions and concerns will be addressed at the conference by our Civil Engineering personnel.

NOTE: This response will be updated soon.

41 Section 3(i) states the contractor shall patch all interior walls in the office and storage areas to smooth finish.

Are the existing walls plaster or drywall?

2 April 14 All sample project questions and concerns will be addressed at the conference by our Civil Engineering personnel.

NOTE: This response will be updated soon.

42 Is there a specification for the ceiling tile and grid we are to install?

2 April 14 All sample project questions and concerns will be addressed at the conference by our Civil Engineering personnel.

NOTE: This response will be updated soon.

Updated on 14 April 2014@0915 43 Please clarify if a Bid Guarantee/Bond is to be submitted with the proposal. The SF1442 states that it is required, however Exhibit 1 states that an offer guarantee is NOT required.

8 April 14 A bid guarantee is not required.

44 Reference solicitation page 53 of 57, Part III, paragraph

a. viii: This paragraph instructs us to provide information for the contracting officer. Must it be the contracting officer, or can it be another person who has in‐depth knowledge of the project, e.g., a project engineer or a COR?

8 April 14 No, it does not have to be a Contracting Officer; it can be another person who has in‐depth knowledge of the project.

45 What are we to put in block 14 under "Code" and "Facility Code" box?

9 April 14 You do not have to fill out block 14 under "Code" and "Facility Code".

46 The way I understand it,there has only been 1 Amendment (dtd 7 Apr) issued. The rest are RFI/s/?

Please confirm.

9 April 14 Yes, there was one amendment made to this solicitation which was the updated SOW.

47 Past Performance Information requests projects within the past 3 years. To better represent a contractors range of work, can past performance be expanded to last five or six years?

9 April 14 Past performance submissions are limited to projects completed or ongoing within the last three years.

48 Reference page 53 of 56, Part III, paragraph b.: In part, this paragraph tells us to submit information which demonstrates positive customer satisfaction with overall job performance for projects that are similar in scope, effort, and complexity. Does this apply to only those projects highlighted in paragraph “a.” of this Part, or may we submit positive feedback on any similar project?

10 April 14 You may submit positive feedback on similar projects.

49 Reference page 52 of 56, L‐2.2, Part 1, paragraph e.

which states: “Annual Reps and Certs (ORCA)”. Are we to provide an ORCA printout from the SAM.gov website, or is this the Section K Reps & Certs that we are to provide?

10 April 14 You do not need to provide an ORCA printout from www.sam.gov.

Paragraph e, "Annual Reps & Certs" should be included in Section K.

50 On page 54 of the RFP at the end of the first paragraph it says, “These general limitations shall apply to both electronic and paper copy proposals.” – I just want to clarify that there is NO requirement for an electronic version of the proposal to be sent in.

11 April 14 There is not a requirement for electronic proposals.

51 In question 21, you mentioned that the Sample Project Schedule should be included in Part I: Contract Documents. Is there a specific location within Part I where this should go?

11 April 14 You may submit the schedule behind the price (part Id).

52 Would it be possible to change the title of Part I. D.

Sample Project Price to read Part I. D. Sample Project and further divide that into Part I.D.1 Sample Project Price and Part I.D.2 Sample Project Schedule?

11 April 14 No

53 In question 22, someone asked about sections I and J and if we needed to include them if there is nothing to fill out. The following question was not answered ‐ Do you want both of these sections in their entirety included in the proposal or only the parts that have fill‐in information. And if there is no fill‐in information, can we

11 April 14 Please submit " only the parts that have fill‐in information." If there is no fill‐in information, you may leave those sections out. Submit this information in Part I(a).

leave these two sections out. ALSO is there a specific location within Part I: Contract Documents that Sections I and J should go? (NOTE – I am not asking about Section K as I already know that this is to be included in its entirety).

54 On page 54 of the RFP, in the second paragraph, it is indicated that a cover sheet is required for each section.

By section do you mean Part I, Part II, Part III or do you mean the individual requirements for each of the parts (for ex. using Part I do you want a cover sheet, sf1442;

cover sheet, joint venture; cover sheet, section G)? (Do you want Cover Sheet for Part I, followed by all the requirements of Part I; Cover sheet for Part II, followed by all the requirements of Part II; Cover sheet for Part III, followed by all the requirements of Part III)

11 April 14 A cover sheet indicating the section number: Part I; section title (a, b, c, or d) and further broken down in accordance with the instructions listed in Section L‐2.

55 Where in Part I would the any Teaming Partner Information go? Do you want the relevant information to go under I.C Section G, Contract Administration Data or should we include it, as well as the actual agreement in a new subcategory: I.G Teaming Agreements

11 April 14 This information should be submitted with the information in Part I (b).

56 You mentioned below that the teaming information should go in Part 1 (b). If we are not submitting under a Joint Venture, can we change the title of Part 1 (b) from "Joint Venture" to "Team Arrangements" or something similar?

14 April 14 Yes, you may.

57 Does the definition of a “general construction contractor” include an environmental consulting firm such as us? We would be interested due to the asbestos and lead consulting.

14 April 14 This acquisition is intended for any general construction contractors under the NAICS code 236220.