Sec J Attach 3 Heavy-Highway DB Wage.pdf
PDF 68 KB Posted
- Attached to
- Multiple Award Task Order Contract Federal contract opportunity
- Solicitation number
- FA4407-10-R-0009
About this file
Heavy Highway Wage Rates
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1MATOC.docx | DOCX document | |
| MATOC Preproposal_Conference__20 Jul 10 final.pptx | PPTX presentation | |
| sign in sheet.pdf | ||
| MATOC RFP Final.pdf | ||
| Exhibit 1 Seed Project Cover letter.pdf | ||
| Attach 2 Section 01010 in 2010.pdf | ||
| Attach 6 VDYD-08-0176 Svc Station Cons Perf Rqmts.pdf | ||
| Attach 8 Spec GIS Auto-CADD.pdf | ||
| Attach 1 Seed Project Price Schedule.docx | DOCX document | |
| Attach 5 VDYD 08-0176 SOW.pdf | ||
| Sec J Attach 2 Building-Residental DB Wage.pdf | ||
| Sec J Exhibit 3 MATOC Company Information Questionnaire.pdf | ||
| Exhibit 1 Seed Project RFP.pdf | ||
| Attach 3 VDYD 08-0176 DWG.pdf | ||
| Sec J Attach 1 MATOC SOW.pdf | ||
| Attach 7 VDYD 08-0176_01732 Demolition.pdf | ||
| Sec J Attach 4 Scott AFB Architectural Compatibility Plan | — | |
| Attach 4 VDYD 08-0176 Schedule of Material Submittal.pdf | ||
| Sec J Exhibit 2 MATOC Past Performance References.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
FA4407-10-R-0009
General Decision Number: IL100017 06/04/2010 IL17
Superseded General Decision Number: IL20080017
State: Illinois
Construction Types: Heavy and Highway
Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.
MACOUPIN (upper 1/2) & MONTGOMERY (upper 1/2, INCLUDING
WAGGONER, STANDARD CITY, & NORTH THEREOF) COUNTIES:
HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line Construction & Drainage Projects) & HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest areas projects, and railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction, other marine bridges)
Modification Number Publication Date 0 03/12/2010 1 05/07/2010 2 06/04/2010
CARP0295-001 05/01/1994
GREENE COUNTY (South of Apple Creek)
Rates Fringes
Carpenter, Lather, Soft Floor Layer............................$ 18.39 6.17
CARP0295-003 05/05/2010
MADISON COUNTY
Rates Fringes
Carpenter and Piledriver.........$ 33.23 12.25
CARP0295-006 05/05/2010
BOND, CALHOUN, and JERSEY COUNTIES
Rates Fringes
CARPENTER........................$ 33.23 12.25
CARP0500-001 05/05/2010
CLINTON, MONROE, and WASHINGTON COUNTIES
Rates Fringes
Carpenter & Piledrivermen........$ 33.23 12.25
CARP0500-003 05/05/2010
ST. CLAIR COUNTY
Rates Fringes
Carpenter and Piledriver.........$ 33.23 12.25
CARP0725-004 05/01/2009
MACOUPIN (Southern Half) AND MONTGOMERY (Southern Half) COUNTIES
Rates Fringes
CARPENTER........................$ 27.81 17.17
PILEDRIVERMAN....................$ 28.81 17.17
CARP0904-002 05/01/2009
GREENE COUNTY (Except S. of Apple Creek)
Rates Fringes
CARPENTER........................$ 27.25 17.49
PILEDRIVERMAN....................$ 28.25 17.49
ELEC0193-003 04/01/1998
Rates Fringes
ELECTRICIAN
BOND (Eastern Half), CLINTON (HUEY, HOFFMAN &
VIC.), and WASHINGTON
(EXCEPT VENEDY TWP)
COUNTIES....................$ 24.96 2.00+24.75%
CALHOUN, GREENE, JERSEY,
MACOUPIN (BRIGHTON TWP),
and MADISON (ALTON & VIC.)
COUNTIES....................$ 24.96 2.00+24.75%
MACOUPIN (ATHENVILLE,
SCOTTVILLE, GIRARD AND
AREA NORTH THEREOF), AND
MONTGOMERY (NORTHWEST PART
INCLUDING BOIS D ARC,
HARVEL, AND PITMAN TWPS)
COUNTIES....................$ 24.96 2.00+24.75%
MONTGOMERY (EAST OF BUTLER
GROVE, GRISHAM, HILLSBORO,
AND RAYMOND TWPS) COUNTIES..$ 24.96 2.00+24.75%
ELEC0193-011 04/06/2009
MACOUPIN (Townships of Scottville, North Palmyra, North Otter, Virden, Girard, Barr, South Palmyra, South Otter, and Nilwood) and MONTGOMERY (Townships of Bois D'Arc, Pitman, and Harvel)
COUNTIES
Line Construction Groundman - Equipment Operator (Class I, all crawler type equipment larger than D-4, 15 ton crane or larger)............$ 33.74 14.45 Groundman - Truck Driver (with winch, may operate diggers, 5th wheel type trucks, crawler-type equipment, D-4 and smaller, backhoe 3/4 yard and under, rubber tire and crawler w/end loader, and may drive bucket truck and live boom type line trucks).$ 25.76 12.15 Groundman - Truck Driver (with winch, may operate diggers, 5th wheel type trucks, crawler-type equipment, D-4 and smaller, backhoe 3/4 yard and under, rubber tired and crawler w/end loader, and may drive bucket truck and live boom type line trucks).....................$ 24.65 11.83 Groundman - Truck Driver (without winch).............$ 24.29 11.73 Groundman (Class A).........$ 23.14 11.40
Lineman.....................$ 36.22 15.17
ELEC0309-002 12/07/2009
BOND (Westside), CLINTON, GREENE (ALL WORK PERFORMED ON THE
ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON
THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT North 1/3 & Southwest Corner), MADISON (EXCEPT East ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (East of ROUNDTREE, IRVING & East FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, and WASHINGTON (OKAWVILLE & VENEDY
TWPS.) COUNTIES
LINE CONSTRUCTION
Groundman Equipment Operator....................$ 34.00 14.69 Groundman Truck Driver......$ 27.75 11.99 Groundman...................$ 25.38 10.97 Lineman.....................$ 39.09 16.89
ELEC0309-003 08/31/2009
BOND (Western Half), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MONROE, MONTGOMERY, WASHINGTON
(VENEDY TWP.), MADISON (EXCLUDES ALTON & VIC.) and ST. CLAIR
ELECTRICIAN......................$ 36.02 42%
ELEC0649-002 12/03/2007
CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND
MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES
GROUNDMAN - EQUIPMENT
OPERATOR....................$ 32.31 13.07
GROUNDMAN - TRUCK DRIVER
W/WINCH.....................$ 24.40 11.03
GROUNDMAN - TRUCK DRIVER
WO/WINCH....................$ 22.55 10.56
GROUNDMAN...................$ 22.00 10.42
LINEMAN; BLASTER; AND
LINEMAN HOLE BORING
MACHINE OPERATOR............$ 37.27 14.35
ELEC0649-008 12/30/2009
CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND
MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES
ELECTRICIAN......................$ 34.90 16.44
ELEC0702-006 06/29/2009
BOND (Eastern Half), and WASHINGTON (OKAWVILLE & VENDY TWPS)
Groundman - Class A.........$ 23.80 11.77 Groundman - Equipment Operator Class II (all other equipment)............$ 28.91 13.25 Heavy - Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 32.38 14.24 Lineman.....................$ 40.55 16.59
ENGI0520-005 08/01/2009
Rates Fringes
OPERATOR: Power Equipment Group 1.....................$ 29.50 22.55 Group 2.....................$ 28.37 22.55 Group 3.....................$ 23.89 22.55 Group 4.....................$ 23.95 22.55 Group 5.....................$ 23.62 22.55 Group 6.....................$ 30.05 22.55 Group 7.....................$ 30.35 22.55
GROUP 1: CRANES; DRAGLINES; SHOVELS; SKIMMER SCOOPS;
CLAMSHELLS OR DERRICK BOATS; PILEDRIVERS; CRANE-TYPE
BACKHOES; ASPHALT PLANT OPER; CONCRETE PLANT OPERATOR;
DREDGES; ASPHALT SPREADING MACHINES; LOCOMOTIVES; CABLEWAYS
OR TOWER MACHINES; HOISTS; HYDRAULIC BACKHOES; DITCHING
MACHINES OR BACKFILLER; CHERRY PICKERS; OVERHEAD CRANE;
ROLLER; CONCRETE PAVER; CONCRETE BREAKERS & PUMPS; BULK
CEMENT PLANTS; CEMENT PUMPS; DERRICK TYPE DRILLS; BOAT
OPERATORS; MOTOR GRADERS OR PUSHCATS; SCOOPS OR
TOURNAPULLS; BULLDOZERS; ENDLOADERS OR FORKLIFTS; POWER
BLADE OR ELEVATING GRADERS; WINCH CATS; BOOM OR WINCH
TRUCKS OR BOOM TRACTORS, PIPEWRAPPING OR PAINTING MACHINES;
DRILLS (OTHER THAN DERRICK TYPE); MUD JACKS; WELL DRILLING
MACHINES; MIXERS; CONVEYORS (TWO); AIR COMPRESSORS TWO;
WATER PUMPS REGARDLESS OF SIZE; WELDING MACHINES TWO;
SIPHONS OR JETS TWO; WINCH HEADS OR APPARATUS TWO; LIGHT
PLANTS TWO; TRACTORS REGARDLESS OF SIZE STRAIGHT (TRACTOR
ONLY); FIREMEN ON STATIONARY BOILERS; AUTOMATIC ELEVATORS;
FORM GRADING MACHINES; FINISHING MACHINES; POWER SUB GRADER
OR RIBBON MACHINE; LONGITUDINAL FLOATS; DISTRIBUTION
OPERATOR ON TRUCKS; WINCH HEADS OR APPARATUSES (1);
EXCAVATORS; MOBILE TRACK AIR AND HEATER (TWO TO FIVE);
HEAVY EQUIPMENT GREASER AND ALL OTHER OPERATORS NOT LISTED
BELOW.
GROUP 2: AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE
ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE;
SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK
AIR ONE.
GROUP 3: FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILERS;
HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE (OVER
65 TON RATE CAPACITY); CONCRETE PLANT OILER AND BLACK TOP
PLANT OILER.
GROUP 4: OILERS
GROUP 5: MASTER MECHANIC; OPERATORS ON EQUIPMENT WITH
BOOMS, INCLUDING JIBS, ONE HUNDRED FEET AND OVER; AND LESS
THAN 150 FEET.
GROUP 6: OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS,
150 FEET AND OVER, AND LESS THAN 200 FEET.
GROUP 7: OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS,
200 FEET AND OVER; TOWER CRANES AND WHIRLEY CRANES.
IRON0046-006 05/01/2009
GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND
MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES
IRONWORKER.......................$ 28.50 16.64
IRON0392-003 08/01/2009
BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY,
MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE,
MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR,
and WASHINGTON COUNTIES
IRONWORKER.......................$ 29.35 17.73
IRON0396-006 08/05/2009
BRIDGES, LOCKS, and DAMS ON THE MISSISSIPPI RIVER
Rates Fringes
IRONWORKER.......................$ 30.98 17.61
LABO0044-001 08/01/2009
MADISON COUNTY (Southwest)
Rates Fringes
LABORER
Group 1.....................$ 23.60 18.05 Group 2.....................$ 24.10 18.05
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
* LABO0100-001 08/01/2009
ST CLAIR COUNTY (East St. Louis,Alcoa, Brooklyn,Cahokia, Caseyville,Centreville, Dupo, Fairmont City, French Village, Midway, Maplewood, National City)
LABORERS
Group 1.....................$ 26.65 15.00 Group 2.....................$ 27.15 15.00
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0179-002 08/01/2002
MADISON COUNTY (Edwardsville, Marine, and Livingston)
Rates Fringes
LABORER
GROUP 1....................$ 20.90 9.85
GROUP 2....................$ 21.15 9.85
GROUP 3....................$ 21.40 9.85
GROUP 4....................$ 22.425 9.85
LABOREER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material;
Ranking or luting asphalt; Burning or cutting with torch;
Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking or performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall;
Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0196-001 08/01/2009
MONROE COUNTY
Rates Fringes
LABORERS
Group 1.....................$ 25.00 16.65 Group 2.....................$ 25.50 16.65
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0197-001 08/01/2002
ST. CLAIR COUNTY (Belleville)
Hod Carrier......................$ 24.40 6.85
LABO0218-001 08/01/2009
BOND (Greeneville), CALHOUN (Hardin), GREENE (Roadhouse), JERSEY (Jerseyville), and MADISON (Alton) COUNTIES
Group 1.....................$ 27.75 13.90 Group 2.....................$ 28.25 13.90
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0338-002 08/01/2009
MADISON COUNTY (Wood River)
Rates Fringes
LABORERS
Dynamite Men................$ 27.85 13.40 General Laborer.............$ 26.35 13.40 Group 1.....................$ 27.50 14.15 Group 2.....................$ 28.00 14.15 Hazardous Materials, Lead Abatement, Asbestos Abatement, Mold & Mildew Remediation Licenses........$ 27.35 13.40 Mason Tender................$ 27.35 13.40 Welding, Burning, or Cutting with Torch..........$ 26.85 13.40
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0397-002 08/01/2009
MADISON COUNTY (GRANITE CITY and Vicinity)
Rates Fringes
LABORERS
Group 1.....................$ 26.95 15.00 Group 2.....................$ 27.15 15.00
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0454-002 08/01/2002
ST. CLAIR COUNTY (EAST ST. LOUIS)
Rates Fringes
Hod Carrier......................$ 26.55 5.00
LABO0459-001 08/01/2009
ST. CLAIR COUNTY (South)
Rates Fringes
LABORERS
Group 1.....................$ 24.90 16.75 Group 2.....................$ 25.40 16.75
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0474-001 08/01/2002
MADISON COUNTY (GLEN CARBON)
Rates Fringes
LABORER
GROUP 1....................$ 20.10 10.65
GROUP 2....................$ 20.35 10.65
GROUP 3....................$ 20.60 10.65
GROUP 4....................$ 21.625 10.65
LABORERS CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0581-002 08/01/2009
CLINTON COUNTY (Carlyle)
Rates Fringes
LABORERS
Group 1.....................$ 23.65 18.00 Group 2.....................$ 24.15 18.00
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0622-002 08/01/2009
BOND COUNTY (Greenville)
Rates Fringes
LABORERS
Group 1.....................$ 24.24 17.41 Group 2.....................$ 24.74 17.41
LABORER CLASSIFICATIONS:
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0646-001 08/01/2002
JERSEY COUNTY (Jerseyville)
Rates Fringes
LABORER
GROUP 1....................$ 21.00 10.05
GROUP 2....................$ 21.25 10.05
GROUP 3....................$ 21.50 10.05
GROUP 4....................$ 22.00 10.05
LABORER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0670-001 08/01/2009
ST CLAIR (O'Fallon, Scott Air Force Base, Shiloh, Lebanon & Vincinity), CLINTON (Trenton & Vicinity), and MADISON (Troy)
Group 1.....................$ 27.35 14.30 Group 2.....................$ 27.85 14.30
LABORER CLASSIFICATIONS:
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste
Worker; Lead Base Paint Worker; Dynamite Man
LABO0674-001 08/01/2002
MADISON COUNTY (St. Jacob)
Rates Fringes
LABORER
GROUP 1....................$ 29.45 1.60
GROUP 2....................$ 29.70 1.60
GROUP 3....................$ 29.95 1.60
GROUP 4....................$ 29.45 1.60
LABORER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0677-001 08/01/2007
BOND COUNTY (Except the Northside)
Rates Fringes
LABORERS
GROUP 1.....................$ 30.25 7.65
GROUP 2.....................$ 30.75 7.65
LABORER CLASSIFICATIONS
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0680-001 08/01/2002
MADISON COUNTY (Highland)
Rates Fringes
LABORER
GROUP 1....................$ 20.50 10.25
GROUP 2....................$ 20.75 10.25
GROUP 3....................$ 21.00 10.25
GROUP 4....................$ 22.025 10.25
LABORER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0742-001 08/01/2009
ST. CLAIR (Mascoutah) and CLINTON (New Baden) COUNTIES
Rates Fringes
LABORERS
Group 1.....................$ 25.10 16.55 Group 2.....................$ 25.60 16.55
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man
LABO0835-001 08/01/2002
GREENE COUNTY (Roadhouse)
LABORER
GROUP 1....................$ 21.00 10.05
GROUP 2....................$ 21.25 10.05
GROUP 3....................$ 21.50 10.05
GROUP 4....................$ 22.00 10.05
LABORER CLASSFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatoves
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0950-001 08/01/2002
MACOUPIN COUNTY (Carlinville, Gillespie, Mt. Olive, Shipman & Staunton)
LABORER
GROUP 1.....................$ 18.40 12.65
GROUP 2.....................$ 18.65 12.65
GROUP 3.....................$ 18.90 12.65
GROUP 4.....................$ 19.005 12.65
LABORERS CLASSIFICATIONS
GROUP 1: General Laborers.
GROUP 2: Work in septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on bottom of sewer trenches on the final grading, laying or caulking of performed sectional sewer pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives.
GROUP 3: Brick mason and plasterer tenders.
GROUP 4: Dynamite and powder men.
LABO0968-001 08/01/1997
CALHOUN COUNTY (Hardin)
Rates Fringes
LABORER
GROUP 1....................$ 25.80 .60
GROUP 2....................$ 26.05 .60
GROUP 3....................$ 26.30 .60
GROUP 4....................$ 27.325 .60
LABORERS CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material;
Ranking or luting asphalt; Burning or cutting with torch;
Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking or performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall;
Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO1084-001 08/01/2009
BOND (Sorento) and MONTGOMERY COUNTIES
Rates Fringes
LABORERS
Group 1.....................$ 23.65 18.00 Group 2.....................$ 24.15 18.00
LABORER CLASSIFICATIONS:
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste
Worker; Lead Base Paint Worker; Dynamite Man
* PAIN0058-002 05/01/2010
Rates Fringes
Painter, Bridge..................$ 30.45 13.47
Epoxy or Toxic-Lead-Based Paint Work-$1.00 Premimum
PLAS0090-001 08/01/2009
BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE
CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY,
and ST. CLAIR COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 29.25 17.45
PLAS0090-005 08/01/2009
Clinton County
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.25 17.45
PLAS0143-007 08/01/2009
WASHINGTON COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.00 14.95
TEAM0065-011 05/01/2009
Rates Fringes
TRUCK DRIVER
Group 1.....................$ 28.605 13.50+a Group 2.....................$ 29.005 13.50+a Group 3.....................$ 29.205 13.50+a Group 4.....................$ 29.455 13.50+a Group 5.....................$ 30.205 13.50+a
FOOTNOTE: a. $31.40 per day
CLASSIFICATIONS:
GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.
GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;
Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;
winch trucks; and four axle combiation units.
GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.
GROUP 4: Low Boy and Oil Distributors.
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .