Attach 6 VDYD-08-0176 Svc Station Cons Perf Rqmts.pdf
PDF 33 KB Posted
- Attached to
- Multiple Award Task Order Contract Federal contract opportunity
- Solicitation number
- FA4407-10-R-0009
About this file
Performance Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1MATOC.docx | DOCX document | |
| MATOC Preproposal_Conference__20 Jul 10 final.pptx | PPTX presentation | |
| sign in sheet.pdf | ||
| MATOC RFP Final.pdf | ||
| Attach 3 VDYD 08-0176 DWG.pdf | ||
| Sec J Attach 1 MATOC SOW.pdf | ||
| Exhibit 1 Seed Project Cover letter.pdf | ||
| Attach 2 Section 01010 in 2010.pdf | ||
| Attach 8 Spec GIS Auto-CADD.pdf | ||
| Attach 1 Seed Project Price Schedule.docx | DOCX document | |
| Attach 5 VDYD 08-0176 SOW.pdf | ||
| Sec J Attach 2 Building-Residental DB Wage.pdf | ||
| Sec J Exhibit 3 MATOC Company Information Questionnaire.pdf | ||
| Exhibit 1 Seed Project RFP.pdf | ||
| Sec J Attach 3 Heavy-Highway DB Wage.pdf | ||
| Attach 7 VDYD 08-0176_01732 Demolition.pdf | ||
| Sec J Attach 4 Scott AFB Architectural Compatibility Plan | — | |
| Attach 4 VDYD 08-0176 Schedule of Material Submittal.pdf | ||
| Sec J Exhibit 2 MATOC Past Performance References.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1, ATTACHMENT 6, Construction Performance Requirements
CONSTRUCTION PERFORMANCE REQUIREMENTS
FACILITY DESCRIPTION
PERFORMANCE
Basic Function:
1. The construction project will consist of providing exterior equipment replacements as required to fulfill needs described in the project program; to replace four vehicle-fueling dispensers and verify compliance with current codes and standards.
2. The complete project is comprised of the following elements:
a. Replacement of existing fuel dispensing equipment.
b. Modification of existing Fuel Master fleet-vehicle accounting system to interface with fuel dispensing equipment.
c. Replacement of existing emergency stop switches.
d. Replacement of existing fuel dispenser electrical circuit breakers.
3. Code: All portions of the project shall comply with all applicable local, State, and Federal codes and regulations as listed and referenced below.
a. Federal Regulatory Requirements:
(1) International Building Code IBC 2006, including all references, except as modified herein.
b. State Regulatory Requirements:
(1) 41 Illinois Administrative Code 170 - Storage, Transportation, Sale and Use of Petroleum and Other Regulated Substances.
c. Local regulatory requirements, which incorporate and/or amend the following:
(1) Local Building Code (IBC 2006).
(2) NFPA 70, National Electrical Code, 2009.
d. Non-Regulatory Criteria Documents: In addition to specific regulatory requirements, the following documents are also incorporated into the definition of "the code" for the purposes of this project, except for administrative provisions contained therein; where referenced, the role of the code official described in the document will be performed by the Government.
(1) UFC 3-460-01 - Petroleum Fuel Facilities.
(2) UFC 3-460-03 - Operation & Maintenance: Maintenance of Petroleum Systems.
(3) NFPA 10 - Portable Fire Extinguishers, latest edition.
(4) NFPA 30 - Flammable and Combustible Liquids Code, latest edition.
(5) NFPA 30A - Motor Fuel Dispensing Facilities, latest edition.
Repair Gov Service Station Building 565 VDYD 08-0176 June 2010 1 of 3
MECHANICAL
PERFORMANCE
Basic Function:
1. The construction will provide self-service fleet-vehicle fuel dispensers which communicate with the existing fleet-vehicle card/key accounting system.
2. The mechanical renovation comprises the following elements:
a. Replace four existing fleet-vehicle fuel dispensers and reconnect to the existing fuel distribution piping.
3. Substantiation:
a. Construction: Fuel dispensers shall meet all requirements of NFPA 30, 30A, Illinois Administrative
Code Title 41, Part 170.
Health and Safety:
1. Mechanical Hazards:
a. The construction shall be in compliance with NFPA standards that apply to the classification, application and design.
June 2010 2 of 3
June 2010 3 of 3
ELECTRICAL
PERFORMANCE
Basic Function:
1. The construction will provide electrical reconnections to equipment being removed and replaced.
2. The electrical renovation is comprised of the following elements:
a. Disconnect electric wiring at four existing dispensers that are being removed and reconnect electric wiring at four new dispensers.
b. Replace existing fuel dispenser circuit breakers with new circuit breakers that can be locked in an open position. Latest edition of NEC 514.11 (A) and NEC 514.13
c. Provide and Install interface modules at the existing Fuel Master Systems. Provide electric wiring from the interface modules to the four fuel dispensers.
d. Disconnect electric wiring and remove three emergency disconnects. Replace three emergency disconnects and reconnect electric wiring at the new emergency disconnects. Latest edition of
NEC 514.11 (A).
3. Substantiation:
a. Construction:
(1) Grounding system shall be verified as latest edition of NEC 514.16 code compliant.
(2) All sealing of conduit at dispensers and boundaries shall be verified as latest edition of NEC
514.9 code compliant.
(3) Wiring shall be verified as Class I code compliant with latest edition of NEC 514.4.
Health and Safety:
1. Electrical Hazards:
a. The construction shall be in compliance with NFPA standards that apply to the classification, application and design.
Operation and Maintenance
1. Dispensing devices shall be provided with a means to remove all external voltage sources, including feedback, during periods of maintenance and service of the dispensing equipment.
2. Emergency controls shall be provided at unattended self-serving motor fuel dispensing facilities.
Emergency controls shall shut off all power to all dispensing equipment stations.
END OF FACILITY DESCRIPTION