Demolition
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1MATOC.docx | DOCX document | |
| sign in sheet.pdf | ||
| MATOC Preproposal_Conference__20 Jul 10 final.pptx | PPTX presentation | |
| MATOC RFP Final.pdf | ||
| Sec J Attach 3 Heavy-Highway DB Wage.pdf | ||
| Sec J Attach 4 Scott AFB Architectural Compatibility Plan | — | |
| Attach 4 VDYD 08-0176 Schedule of Material Submittal.pdf | ||
| Sec J Exhibit 2 MATOC Past Performance References.pdf | ||
| Attach 5 VDYD 08-0176 SOW.pdf | ||
| Sec J Attach 2 Building-Residental DB Wage.pdf | ||
| Sec J Exhibit 3 MATOC Company Information Questionnaire.pdf | ||
| Exhibit 1 Seed Project RFP.pdf | ||
| Exhibit 1 Seed Project Cover letter.pdf | ||
| Attach 2 Section 01010 in 2010.pdf | ||
| Attach 6 VDYD-08-0176 Svc Station Cons Perf Rqmts.pdf | ||
| Attach 8 Spec GIS Auto-CADD.pdf | ||
| Attach 1 Seed Project Price Schedule.docx | DOCX document | |
| Attach 3 VDYD 08-0176 DWG.pdf | ||
| Sec J Attach 1 MATOC SOW.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1, ATTACHMENT 7 - DEMOLITION
SECTION 01732 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Demolition and removal of selected site elements.
2. Salvage of existing items to be reused or recycled.
B. Related Sections include the following:
1. Division 1 Section "General Requirements" for use of premises, and phasing, and Owner-occupancy requirements.
2. Division 1 Section "General Requirements" for preconstruction photographs taken before selective demolition operations.
3. Division 1 Section "General Requirements" for temporary construction and environmental-protection measures for selective demolition operations.
4. Division 1 Section "General Requirements" for disposal of demolished materials.
5. Division 1 Section "General Requirements" for cutting and patching procedures.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Owner.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.4 SUBMITTALS
A. Qualification Data: For demolition firm.
B. Schedule of Selective Demolition Activities: Indicate the following:
SELECTIVE DEMOLITION 01732 - 1
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Locations of proposed dust- and noise-control temporary partitions and means of egress, including for other tenants affected by selective demolition operations.
5. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
6. Means of protection for items to remain and items in path of waste removal from building.
C. Inventory: After selective demolition is complete, submit a list of items that have been removed and salvaged.
D. Pre-demolition Photographs or Videotapes: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by selective demolition operations. Comply with Division 1 Section "General Requirements" Submit before Work begins. Take photos of existing damaged material before job begins, to protect builder’s reputation.
1.5 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.
B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
C. Standards: Comply with ANSI A10.6 and NFPA 241.
1.6 PROJECT CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
1. Comply with requirements specified in Division 1 Section "General Requirements."
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Contracting Officer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: Hazardous materials are present in construction to be selectively demolished. A report on the presence of hazardous materials is on file for review and use.
Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
SELECTIVE DEMOLITION 01732 - 2
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.7 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
E. Survey of Existing Conditions: Record existing conditions by use of measured drawings, preconstruction photographs and/or preconstruction videotapes.
1. Comply with requirements specified in Division 1 Section "General Requirements."
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
F. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
SELECTIVE DEMOLITION 01732 - 3
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations.
1. Comply with requirements for existing services/systems interruptions specified in Division 1 Section "General Requirements".
B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off indicated utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Comply with requirements for access and protection specified in Division 1 Section “General Requirements.”
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
SELECTIVE DEMOLITION 01732 - 4
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
6. Dispose of demolished items and materials promptly. Comply with requirements in
Division 1 Section “General Requirements.”
B. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Protect items from damage during transport and storage.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
2. Protect items from damage during transport and storage.
3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Cut concrete to a depth of at least 3/4 inch (19 mm) at junctures with construction to remain, using power-driven saw. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete indicated for selective demolition. Neatly trim openings to dimensions indicated.
B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, then remove masonry between saw cuts.
C. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and remove.
SELECTIVE DEMOLITION 01732 - 5
SELECTIVE DEMOLITION 01732 - 6
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Division 1 Section “General Requirements.”
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.8 SELECTIVE DEMOLITION SCHEDULE
A. Existing items and construction to be removed:
1. Noted fuel dispensers on existing islands.
2. Noted emergency stop devices.
3. Noted electrical circuit breakers.
B. Existing Items to be Removed and Salvaged:
1. None
C. Existing items to be removed and reinstalled:
1. None
END OF SECTION 01732