Attach 4 VDYD 08-0176 Schedule of Material Submittal.pdf
PDF 33 KB Posted
- Attached to
- Multiple Award Task Order Contract Federal contract opportunity
- Solicitation number
- FA4407-10-R-0009
About this file
Schedule of Material Submittal
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1MATOC.docx | DOCX document | |
| MATOC Preproposal_Conference__20 Jul 10 final.pptx | PPTX presentation | |
| sign in sheet.pdf | ||
| MATOC RFP Final.pdf | ||
| Attach 3 VDYD 08-0176 DWG.pdf | ||
| Sec J Attach 1 MATOC SOW.pdf | ||
| Attach 5 VDYD 08-0176 SOW.pdf | ||
| Sec J Attach 2 Building-Residental DB Wage.pdf | ||
| Sec J Exhibit 3 MATOC Company Information Questionnaire.pdf | ||
| Exhibit 1 Seed Project RFP.pdf | ||
| Exhibit 1 Seed Project Cover letter.pdf | ||
| Attach 2 Section 01010 in 2010.pdf | ||
| Attach 6 VDYD-08-0176 Svc Station Cons Perf Rqmts.pdf | ||
| Attach 8 Spec GIS Auto-CADD.pdf | ||
| Attach 1 Seed Project Price Schedule.docx | DOCX document | |
| Sec J Attach 3 Heavy-Highway DB Wage.pdf | ||
| Attach 7 VDYD 08-0176_01732 Demolition.pdf | ||
| Sec J Attach 4 Scott AFB Architectural Compatibility Plan | — | |
| Sec J Exhibit 2 MATOC Past Performance References.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VDYD 08-0176
APPROVED DISAPPROVED
GENERAL REQUIREMENTS
TEST AGENCY CERT & CQC PLAN
X
GENERAL REQUIREMENTS
1-YEAR WARRANTY
X
GENERAL REQUIREMENTS
QUARTERLY WASTE TRACKING
FORM
X
HAZ. MATERIAL USAGE
REQUIREMENTS.
HAZ MAT FORM, PART I
X
HAZ. MATERIAL USAGE
REQUIREMENTS.
HAZ MAT FORM, PART II
X
PROJECT MANAGEMENT & COORD.
COORDINATION DRAWINGS
(AS REQUIRED)
X
PROJECT MANAGEMENT & COORD.
KEY PERSONNEL NAMES
X
CONST PROGRESS
DOCUMENTATION
LIST OF SUBCONTRACTORS AND
MATERIAL SUPPLIERS
X
CONST PROGRESS
DOCUMENTATION
LIST OF SUBCONTRACTORS AND
MATERIAL SUPPLIERS
X
QUALITY REQUIREMENTS
QUALIFICATIONS DATA
X
QUALITY REQUIREMENTS
TEST AND INSPECTION REPORTS
X
QUALITY REQUIREMENTS
COPY OF PERMITS, LICENSES, AND
CERTIFICATES
X
EXECUTION REQUIREMENTS
LANDFILL RECEIPTS
X
CUTTING AND PATCHING
CUTTING & PATCHING PROPOSAL
X
CLOSE-OUT PROCEDURE
CONTRACTOR'S PUNCH LIST ITEMS
X
CLOSE-OUT PROCEDURE
SUBSTANTIAL COMPLETION
INSPECTION REQUEST
X
CLOSE-OUT PROCEDURE
FINAL COMPLETION INSPECTION
REQUEST
X
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Repair Gov Service Station
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
C A
T A
L O
G D
A T
A
FOLLOW-UP
REQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSION
DATE
DATE CONTRACTOR NOTIFIED
L
IN
E N
U M
B E
R
O T
H E
R
M
A T
E R
IA
L o r D
A T
A
F
IE
L D
Q U
A L
IT
Y
-C O
N T
R O
L
T E
S T
R E
P O
R T
S
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
A N
D C
L O
S E
O U
T
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
C O
M M
E N
D A
T
IO
N S
L:\09projects\0913-Gov Service Station\kj final RD\VDYD 08-0176 Schedule of Material Submittal.xls Page 1 of 2 cynthia.strout Text Box
EXHIBIT 1, ATTACHMENT 4
PROJECT NO.
VDYD 08-0176
APPROVED DISAPPROVED
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
SOLICITATION/CONTRACT NO.PROJECT TITLE
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Repair Gov Service Station
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
REMARKS
FINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
C A
T A
L O
G D
A T
A
FOLLOW-UP
REQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSION
DATE
DATE CONTRACTOR NOTIFIED
L
IN
E N
U M
B E
R
O T
H E
R
M
A T
E R
IA
L o r D
A T
A
F
IE
L D
Q U
A L
IT
Y
-C O
N T
R O
L
T E
S T
R E
P O
R T
S
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
A N
D C
L O
S E
O U
T
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
'S
C O
M M
E N
D A
T
IO
N S
CLOSE-OUT PROCEDURE
WARRANTY MANUAL
X
PROJECT RECORD DOCUMENTS
RECORD DRAWINGS. & SPECS.
X
PROJECT RECORD DOCUMENTS
CAPITALIZATION TRACKING SHEET
X
ASBESTOS CONTAINING MATERIALS
REGULATORY SUBMITTALS
X
FACILITY FUEL-OIL PIPING
(DISPENSER)
X
FACILITY FUEL-OIL PIPING
(DISPENSER)
X
FACILITY FUEL-OIL PIPING
(DISPENSER)
X
FACILITY FUEL-OIL PIPING
(DISPENSER)
X
FACILITY FUEL-OIL PIPING
(DISPENSER)
X
FACILITY FUEL-OIL PIPING
(DISPENSER)
X
28 WIRING DEVICES X
29 WIRING DEVICES X
ENCLOSED SWITCHES AND CIRCUIT
BREAKERS X
L:\09projects\0913-Gov Service Station\kj final RD\VDYD 08-0176 Schedule of Material Submittal.xls Page 2 of 2