Attachment 14 Task Order Addendum - JUBJ 24-7621 Paint Exterior Bldg 1017 Gunter.pdf
PDF 119 KB Posted
- Solicitation number
- FA330026R0020
About this file
This is an addendum to a federal construction contract for pressure washing and painting services at Maxwell Air Force Base, Gunter Annex. The addendum modifies three key specifications in the original bid/contract documents and must be acknowledged by bidders to avoid disqualification.
Paragraph 1.6 expands the scope of work to require the service provider to furnish all necessary equipment, materials, labor, and transportation to repair, pressure wash, and paint the exterior of Building 1017, including all stairs/ramps, railings, exterior doors, retaining walls, and EFIS banisters connected to the building. Paragraph 1.7 adds 50 light poles in the clock tower area to the scope, along with all planters and retaining walls in that area. The scheduling requirement in Paragraph 3.1 has been extended from 180 calendar days to 225 calendar days for project completion. The contractor must submit an initial work schedule before commencing on-site work and is responsible for establishing a schedule that meets the construction timeline. This addendum takes precedence over any conflicting conditions in the specifications, drawings, and related architectural, civil, structural, mechanical, plumbing, and electrical drawings.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM # 1 Date: August 7, 2026
PROJECT:
JUBJ 24-7621 Pressure Wash & Paint Building 1017
MAXWELL AFB, GUNTER ANNEX
This Amendment is hereby part of the Bid/Contract Documents and as must be acknowledged with the Bid. Failure to do so may subject the Bidder to disqualification. The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other Contract
Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Bid/Contract
Documents are hereby amended in the following particulars:
Specifications: General Requirements;
1. Para 1.6 add in paragraph
Exterior doors
Paragraph to read:
1.6 Service provider shall furnish all necessary equipment, materials, labor, and transportation necessary to repair, pressure wash and paint exterior building 1017, including all stair/ramps, railings, exterior doors, retaining walls and EFIS banisters connected to building 1017.
2. Para 1.7 add
50 light poles
Paragraph to read:
1.7 Include all planters/retaining walls and 50 light poles in the clock tower area.
3. Para 3.1 SCHEDULING change 180 to 225 calendar days Paragraph to read:
3.1 SCHEDULING: The Contractor shall be responsible for establishing a schedule to meet construction time. Contractor shall prepare a work schedule on forms provided for schedule of work. Contractor cannot start on site without submitting an initial schedule. Contractor shall have 225 calendar days to complete the work.