Attachment 9 Task Order AF 3052 Cost Estimate Breakdown - JUBJ 24-7621 Paint Ext Bldg 1017 Gunter.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- FA330026R0020
About this file
This is a cost estimate breakdown spreadsheet for a specific task order under an Indefinite Delivery Indefinite Quantity (IDIQ) contract for exterior painting services at Maxwell Air Force Base and Gunter Annex. The task order, identified as AF 3052 under solicitation JUBJ 24-7621, pertains to painting work on Building 1017 at Gunter Annex. The file contains detailed cost breakdowns by line item, including labor, materials, equipment, and overhead allocations necessary for estimating the total project cost. This spreadsheet serves as the financial proposal component for the painting task order and would be used by the contracting officer for cost analysis and comparison against other competing proposals.
The underlying IDIQ contract is a competitive, firm-fixed-price procurement set aside as a 100% Total Economically Disadvantaged Women-Owned Small Business (EDWOSB) solicitation. Offerors must be located within a 250-mile radius of Maxwell AFB, Alabama to be eligible. A mandatory site visit is scheduled for July 14, 2026 at 9:00 AM CDT at Building 1017 (University Inn), with attendee names and credentials required to be submitted by July 13, 2026 at 1:00 PM CDT to the contracting officer's representative. The Department of the Air Force Air Education and Training Command is the procuring agency for this painting IDIQ vehicle covering multiple task orders across the 2026 fiscal year.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
CONSTRUCTION COST ESTIMATE BREAKDOWN
| DATE | ADDRESS | |||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Paint Exterior | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Buildings 1017 | PNQS 24-7621 | Maxwell AFB | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| PROJECT MANAGER | Wk | $0.00 | $0.00 | |||||
| DIVISION 2 (Site Work) | ||||||||
| DIVISION 3 (CONCRETE | ||||||||
| DIVISION 4 (MASONRY) | ||||||||
| DIVISION 5 (METAL) | ||||||||
| DIVISION 6 (WOOD AND PLASTICS) | ||||||||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | ||||||||
| DIVISION 8 (DOORS AND WINDOWS) | ||||||||
| DIVISION 9 (FINISHES) | ||||||||
| Pressure wash, Prep/Paint rails and stairs | SF | $0.00 | $0.00 | $0.00 | ||||
| Patch surfaces | SF | $0.00 | $0.00 | $0.00 | ||||
| Prep/Paint metal doors | EA | $0.00 | $0.00 | $0.00 | ||||
| Pressure Wash/Paint Exterior | SF | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 10 (SPECIALTIES) | $0.00 | |||||||
| DIVISION 11 (EQUIPMENT) | ||||||||
| DIVISION 12 (FURNISHINGS) | $0.00 | |||||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | |||||||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | |||||||
| DIVISION 15 (MECHANICAL) | $0.00 | |||||||
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| Material Costs | $0.00 | $0.00 | ||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Labor Cost | $0.00 | $0.00 | ||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 |