FA3020-18-R-0008_-_Amend_6.pdf
PDF 61 KB Posted
- Solicitation number
- FA3020-18-R-0008
About this file
FA3020-18-R-0008 - Amend 6
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide a response for an unresolved contractor question and provide clarif ications. The proposal due date of 10 July 2018 at 1400 CST remains unchanged. No further questions w ill be accepted.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA302018R0008
X 9B. DATED (SEE ITEM 11)
07-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jun-2018
CODE
82 CONS/LGC, CONTRACTING SQ
206 J AVENUE, BLDG 1662
SHEPPARD AFB TX 76311-2743
FA3020 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA302018R0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
ATTACHMENT DESCRIPTION
Base Contract Requirements
1. General Requirements
2. Wage Determination – OK180018, dated 01/05/2018, Tillman Highway
3. Wage Determination – OK180036, dated 01/05/2018, Tillman Heavy
4. Wage Determination – OK180070, dated 04/20/2018, Tillman Building
5. Wage Determination – TX180012, dated 01/05/2018, Wichita Cty Heavy-Highway
6. Wage Determination – TX180326, dated 02/09/2018, Wichita Cty Building
7. Wage Determination – TX180035, dated 01/05/2018, Grayson Highway
8. Wage Determination – TX180085, dated 01/05/2018, Grayson Heavy
9. Wage Determination – TX180299, dated 01/05/2018, Grayson Building
10. Base Pass Form 151
11. Disclosure of Lobbying Activities, SF LLL
12. Past and Present Performance Questionnaire
22. Map from Missile Road Gate to Bldg 1662
23. Map from Main Gate to Bldg 1662
24. Response to Contractor Question – Amendment 2
25. Site Visit Informational Slides
26. Site Visit Sign In Sheet
27. Responses to Contractor Questions – Amendment 3
28. Responses to Contractor Questions – Amendment 4
29. Responses to Contractor Questions – Amendment 5
30. Responses to Contractor Questions – Amendment 6
Sample/Seed Project Requirements
13. Statement of Work, VNVP 141207 13A. Statement of Work, VNVP 141207
14. Drawings, VNVP 141207 (DWF File)
15. Drawings, VNVP 141207 (PDF)
16. List of Material Submittals, VNVP 141207 (Excel)
17. List of Material Submittals, VNVP 141207 (PDF)
18. Cost Estimate Breakdown, VNVP 141207 (Excel) 18A. Cost Estimate Breakdown, VNVP 141207 (Excel)
19. Cost Estimate Breakdown, VNVP 141207 (PDF) 19A. Cost Estimate Breakdown, VNVP 141207 (PDF)
20. Blank Schedule B, VNVP 141207
21. Sample Project-Specific Clauses
(End of Summary of Changes)
FA302018R0008
File details come from the government source that posted it.