Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||||
| VNVP | |||||||||||||||||
| 141207 | 141207 Repair Tech Training Facility, B10187 | ||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTING OFFICER | ||||||||||||||||
| NUMBER OF COPIES TO BE COMPLETED | |||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | PRE CONSTRUCTION SUBMITTALS | SHOP DRAWINGS | PRODUCT DATA | SAMPLES / COLOR SELECTION | DESIGN DATA | TEST REPORTS | CERTIFICATES | MANUFACTURER'S INSTRUCTIONS | MANUFACTURER'S FIELD REPORTS | OPERATIONS AND MAITENANCE DATA | CLOSE OUT SUBMITTALS |
REQUIRED SUBMITTAL
DATE
| DATE RECEIVED IN CONTRACTING | DATE TO | |||||||||||||||
| CIVIL ENGINEER | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||||
| APPROVAL | REMARKS | |||||||||||||||
| SD-01 | SD-02 | SD-03 | SD-04 | SD-05 | SD-06 | SD-07 | SD-08 | SD-09 | SD-10 | SD-11 | APPROVED | DISAPPROVED | ||||
| 1 | * AF Form 103 - Section 01 11 00 | E | Prior to start of any work | |||||||||||||
| 2 | Existing Damage - Section 01 11 00 | E | Prior to start of any work | |||||||||||||
| 3 | List of Contact Personnel - Section 01 14 00 | E | Within 10 days of NTP | |||||||||||||
| 4 | Construction Schedule - Section 01 32 16.00 20 | E | Prior to start of any work | |||||||||||||
| 5 | Schedule of Work - Section 01 35 13 | E | Prior to start of any work | |||||||||||||
| 6 | List of Personnel - Section 01 35 13 | E | Prior to start of any work | |||||||||||||
| 7 | List of POVs - Section 01 35 13 | E | Prior to start of any work | |||||||||||||
| 8 | Accident Prevention Plan - Section 01 35 26 | E | Prior to start of any work | |||||||||||||
| 9 | Activity Hazard Analysis - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 10 | Crane Critical Lift Plan - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 11 | Proof of qualifications of Crane Operator - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 12 | FAA Notice of Proposed Construction - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 13 | Accident Reports - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 14 | Crane Reports - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 15 | Confined Space Entry Permit - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 16 | Hot work permit - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 17 | License Certificates - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 18 | Hazardous Material Documentation - Section 01 35 26 | E | As required by Specification | |||||||||||||
| 19 | CQC Plan - Section 01 45 00.00 10 | E | Prior to start of any work | |||||||||||||
| 20 | * CQC Daily Reports - Section 01 45 00.00 10 | E | As required by Specification | |||||||||||||
| 21 | Traffic Control Plan - Section 01 50 00 | E | Prior to start of any work | |||||||||||||
| 22 | Backflow Preventers - Section 01 50 00 | E | As required by Specification | |||||||||||||
| 23 | Backflow Preventer Test - Section 01 50 00 | E | As required by Specification | |||||||||||||
| 24 | Backflow Tester Certification - Section 01 50 00 | E | As required by Specification | |||||||||||||
| 25 | Backflow Preventers Certificate of Full Approval - Section 01 50 00 | E | As required by Specification | |||||||||||||
| 26 | Environmental Protection Plan - Section 01 57 20.00 10 | E | Prior to start of any work | |||||||||||||
| 27 | Packaging - Section 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 28 | * Field Quality Control Reports - Section 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 29 | EMS Awareness-Level Training - Section 01 57 20.00 10 | E | Prior to start of any work | |||||||||||||
| 30 | Environmental Regulatory Requirements - Section 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 31 | Material Safety Data Sheets - Section 01 57 20.00 10 | E | Prior to start of any work | |||||||||||||
| 32 | Protection of Natural Resources - Section 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 33 | Prohibited Material Certification - Section 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 34 | Non-Hazardous Solid Waste Diversion Report - Section 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 35 | Erosion and Sediment Controls - Section 01 57 23 | E | As required by Specification | |||||||||||||
| 36 | Mill Certificate or Affidavit - Section 01 57 23 | E | As required by Specification | |||||||||||||
| 37 | Green Procurement Reporting Form - Section 01 62 35 | E | As required by Specification | |||||||||||||
| 38 | Surveying Subcontractor - Section 01 71 23.16 | E | Prior to start of any work | |||||||||||||
| 39 | Topographical and Physical Feature Field survey - Section 01 71 23.16 | E | As required by Specification | |||||||||||||
| 40 | Waste Management Plan - Section 01 74 19 | E | Prior to start of any work | |||||||||||||
| 41 | Records - Section 01 74 19 | E | As required by Specification | |||||||||||||
| 42 | Warranty Binder - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 43 | Final Cleaning - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 44 | Spare Parts Data - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 45 | Posted Instructions - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 46 | Operation and Maintenance Manuals - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 47 | As-Built Drawings - Section 01 78 00 | 3 | As required by Specification | |||||||||||||
| 48 | Record Drawings - Section 01 78 00 | 3 | As required by Specification | |||||||||||||
| 49 | Final Approved Shop Drawings - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 50 | Certification of EPA Designated Items - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 51 | Form DD1354 - Section 01 78 00 | E | As required by Specification | |||||||||||||
| 52 | O&M Database - Section 01 78 23 | E | As required by Specification | |||||||||||||
| 53 | Demolition Plan - Section 02 41 00 | E | As required by Specification | |||||||||||||
| 54 | Disposal Receipts - Section 02 41 00 | E | As required by Specification | |||||||||||||
| 55 | Installation Drawings - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 56 | Portland Cement - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 57 | Fly Ash - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 58 | Aggregates - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 59 | Air-Entraining Admixture - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 60 | Water-Reducting and/or Retarding Admixture - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 61 | Reinforcement - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 62 | Form Work - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 63 | Curing Materials - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 64 | Ready-Mix Concrete Mix Design Data - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 65 | Aggregates - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 66 | Concrete Mixture Proportions - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 67 | Compressive Strength Testing - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 68 | Air Content - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 69 | Slump - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 70 | Cementitious Materials - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 71 | Batch Tickets - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 72 | NRMCA Plant Certification - Section 03 30 53 | E | As required by Specification | |||||||||||||
| 73 | Reinforcement Detail Drawings - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 74 | Hot Weather Procedures - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 75 | Cold Weather Procedures - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 76 | Clay or Shale Brick - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 77 | Joint Reinforcement - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 78 | Anchors, Ties, and Bar positioners - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 79 | Masonry Mortar and Admixtures - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 80 | Clay Masonry Expansion-Joint Materials - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 81 | Clay or Shale Brick - Section 04 20 00 | 1 | As required by Specification | |||||||||||||
| 82 | Mock-Up Panel - Section 04 20 00 | 1 | As required by Specification | |||||||||||||
| 83 | Efflorescence Test - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 84 | Field Testing of Mortar - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 85 | Single-Wythe Msonry Wall Water Penetration Test - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 86 | Admixtures for Masonry Mortar - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 87 | Admixtures for Grout - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 88 | Anchors, Ties and Bar Positioners - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 89 | Joint Reinforcement - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 90 | Admixtures for Masonry Mortar - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 91 | Admixtures for Grout - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 92 | Take-Back Program - Section 04 20 00 | E | As required by Specification | |||||||||||||
| 93 | Framing Components - Section 05 40 00 | E | As required by Specification | |||||||||||||
| 94 | Truss Assembly Components Including Framing Members, Bracing, Bridging, Anchoring, and Accessories - Section 05 40 00 | E | As required by Specification | |||||||||||||
| 95 | Metal Framing Calculations - Section 05 40 00 | E | As required by Specification | |||||||||||||
| 96 | Load-Bearing Cold-Formed Metal - Section 05 40 00 | E | As required by Specification | |||||||||||||
| 97 | Framing Welds - Section 05 40 00 | E | As required by Specification | |||||||||||||
| 98 | Blanket insulation - Section 07 21 16 | E | As required by Specification | |||||||||||||
| 99 | Accessories - Section 07 21 16 | E | As required by Specification | |||||||||||||
| 100 | Sheathing Board - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 101 | Adhesive - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 102 | Mechanical Fasteners - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 103 | Accessories - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 104 | Base Coat - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 105 | Portland Cement - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 106 | Reinforcing Fabric - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 107 | Finish Coat - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 108 | Joint Sealant - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 109 | Sealant Primer - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 110 | Bond Breaker - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 111 | Backer Rod - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 112 | Insulation - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 113 | Board Warranty - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 114 | Sample Boards - Section 07 24 00 | 1 | As required by Specification | |||||||||||||
| 115 | Color and Texture - Section 07 24 00 | 1 | As required by Specification | |||||||||||||
| 116 | Mock-up Installation of EIFS - Section 07 24 00 | 1 | As required by Specification | |||||||||||||
| 117 | Wind Load Calculations - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 118 | Moisture Analysis Calculations - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 119 | Abrasion Resistance - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 120 | Accelerated Weathering - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 121 | Impact Resistance - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 122 | Mildew Resistance - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 123 | Salt Spray Resistance - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 124 | Water Vapor Transmission - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 125 | Absorption-Freeze-Thaw - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 126 | Wall Fire Test - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 127 | Water Penetration - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 128 | Water Resistance - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 129 | Full Scale or Intermediate Scale Fire Test - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 130 | Surface Burning Characteristics - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 131 | Radiant Heat - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 132 | Substrate - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 133 | Wind Load - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 134 | Qualifications of EIFS Manufacturer - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 135 | Qualification of EIFS Installer - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 136 | Qualification of Sealant Applicator - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 137 | Certify that EIFS installer meets requirements specified under paragraph "Qualification of Installer," and that sealant applicator is approved by the EIFS Manufacturer. - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 138 | Qualifications of Third Party Inspector - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 139 | Inspection Check List - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 140 | Installation - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 141 | EIFS - Section 07 24 00 | E | As required by Specification | |||||||||||||
| 142 | Product Data - Section 07 92 00 | E | As required by Specification | |||||||||||||
| 143 | Doors - Section 08 11 13 | E | As required by Specification | |||||||||||||
| 144 | Frames - Section 08 11 13 | E | As required by Specification | |||||||||||||
| 145 | Accessories - Section 08 11 13 | E | As required by Specification | |||||||||||||
| 146 | Porduct Data - Section 08 41 13 | E | As required by Specification | |||||||||||||
| 147 | Color Chart - Section 08 41 13 | 1 | As required by Specification | |||||||||||||
| 148 | Installation Instructions - Section 08 41 13 | E | As required by Specification | |||||||||||||
| 149 | Shop Drawings - Section 08 41 13 | E | As required by Specification | |||||||||||||
| 150 | Test Reports - Section 08 41 13 | E | As required by Specification | |||||||||||||
| 151 | Hardware Schedule - Section 08 71 00 | E | As required by Specification | |||||||||||||
| 152 | Hardware items - Section 08 71 00 | E | As required by Specification | |||||||||||||
| 153 | Each exposed finish - Section 08 71 00 | E | As required by Specification | |||||||||||||
| 154 | Product certificates - Section 08 71 00 | E | As required by Specification | |||||||||||||
| 155 | Installation - Section 08 71 00 | E | As required by Specification | |||||||||||||
| 156 | Solid Vinyl Floor Tile - Section 09 65 00 | E | As required by Specification | |||||||||||||
| 157 | Resilient Wall Base - Section 09 65 00 | E | As required by Specification | |||||||||||||
| 158 | Installation Materials - Section 09 65 00 | E | As required by Specification | |||||||||||||
| 159 | Solid Vinyl Floor Tile - Section 09 65 00 | 1 | As required by Specification | |||||||||||||
| 160 | Resilient Wall Base - Section 09 65 00 | 1 | As required by Specification | |||||||||||||
| 161 | Product Data - Section 09 90 00 | E | As required by Specification | |||||||||||||
| 162 | Samples - Section 09 90 00 | E | As required by Specification | |||||||||||||
| 163 | Applicator's qualifications - Section 09 90 00 | E | As required by Specification | |||||||||||||
| 164 | Application instructions - Section 09 90 00 | E | As required by Specification | |||||||||||||
| 165 | Mixing - Section 09 90 00 | E | As required by Specification | |||||||||||||
| 166 | Manufacturer's Material Safety Data Sheets - Section 09 90 00 | E | As required by Specification | |||||||||||||
| 167 | Manufacturer's Qualifications - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 168 | Detail Drawings - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 169 | Product Data - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 170 | Manufacturer's catalog data - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 171 | Coil Stock - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 172 | Roof Panels - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 173 | Fasteners - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 174 | Metal Closure Strips - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 175 | Insulation - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 176 | Vapor Barrier - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 177 | Manufacturer's color charts and chips - Section 13 34 19 | 1 | As required by Specification | |||||||||||||
| 178 | Manufacturer's descriptive and technical literature - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 179 | Manufacturer's building design analysis - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 180 | Test reports - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 181 | Coatings and base metals - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 182 | Factory Color Finish Performance Requirements - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 183 | System components - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 184 | Coil Stock certification - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 185 | Aluminized Steel Repair Paint - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 186 | Galvanizing Repair Paint - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 187 | Enamel Repair Paint - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 188 | Qualification of Manufacturer - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 189 | Qualification of Erector - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 190 | Installation of Roof and Wall panels - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 191 | Shipping, handling, and storage - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 192 | Manufacturer's Warranty - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 193 | Contractor's Warranty for Installation - Section 13 34 19 | E | As required by Specification | |||||||||||||
| 194 | Material, Equipment, and Fixture Lists - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 195 | Conduits, Raceways and Fittings - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 196 | Wire and Cable - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 197 | Splices and Connectors - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 198 | Switches - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 199 | Receptacles - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 200 | Outlets, Outlet Boxes, and Pull Boxes - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 201 | Circuit Breakers - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 202 | Panelboards - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 203 | Lamps and Lighting Fixtures - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 204 | Spare Parts - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 205 | Certification - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 206 | Continuity Test - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 207 | Phase Rotation Tests - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 208 | Insulation Resistance Test - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 209 | Manufacturer's Instructions - Sec 26 05 00.00 40 | E | As required by Specification | |||||||||||||
| 210 | Shop Drawings - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 211 | Panelboards - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 212 | Directory Card and Holder - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 213 | Keys - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 214 | Continuity Test - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 215 | Insulation Test - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 216 | Certificates - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 217 | Manufacturer's Instructions - Section 26 24 16.00 40 | 3 | As required by Specification | |||||||||||||
| 218 | Equipment - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 219 | Borrow Material - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 220 | Testing - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 221 | Testing - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 222 | Gate Assembly - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 223 | Gate Hardware and Accessories - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 224 | Concrete - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 225 | Line, Corner, End, and Pull Posts - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 226 | Rails- Section 32 31 26 | E | As required by Specification | |||||||||||||
| 227 | Fence Fabric - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 228 | Tension Wire - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 229 | Barbed Wire - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 230 | Barbed Wire Extension Arms - Section 32 31 26 | E | As required by Specification | |||||||||||||
| 231 | Ductless AHU and Compressor | E | E | E | ||||||||||||
| 232 | Exhaust Fan | E | E | E | ||||||||||||
| NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual Specification Sections for detailed submittal requirements and instructions. |
FA4600-11-B-0025
Attachment 3 Page &P
* Items to be provided but not on an AF3000. &P of &N E - Electronic