16_-_List_of_Material_Submittals,_VNVP_141207.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Sheppard/Altus AFB Multiple Award Construction Contract (MACC) - FA3020-18-R-0008
Solicitation number
FA3020-18-R-0008
Issued by

About this file

16. Sheppard/Altus MACC - Sample/Seed Project List of Material Submittals (Excel), VNVP 141207

View the file

Other files

File Type Posted
FA3020-18-R-0008_-_Amend_7.pdf PDF
31_-_Responses_to_Contractor_Questions_Amend_7.pdf PDF
FA3020-18-R-0008_-_Amend_6.pdf PDF
30_-_Responses_to_Contractor_Questions_Amend_6.pdf PDF
FA3020-18-R-0008_-_Amend_5.pdf PDF
29_-_Responses_to_Contractor_Questions_Amend_5.pdf PDF
FA3020-18-R-0008_-_Amend_3.pdf PDF
28_-_Responses_to_Contractor_Questions_Amend_4.pdf PDF
FA3020-18-R-0008_-_Amend_4.pdf PDF
18A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
13A_-Statement_of_Work,_VNVP_141207.pdf PDF
26_-_Site_Visit_Sign_In_Sheets.pdf PDF
19A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
25_-_Site_Visit_Informational_Slides.pdf PDF
27_-_Response_to_Contractor_Question_Amend_3.pdf PDF
24_-_Response_to_Contractor_Question_Amend_2.pdf PDF
FA3020-18-R-0008_-_Amend_2.pdf PDF
22_-_Map_from_Missile_Gate_to_Bldg_1662.pdf PDF
FA3020-18-R-0008_Amend_1.pdf PDF
23_-_Map_from_Main_Gate_to_Bldg_1662.pdf PDF
18_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
21_-_Sample_Project_Specific_Clauses.pdf PDF
11_-_Disclosure_of_Lobbying_Activities,_SF_LLL.pdf PDF
17_-_List_of_Material_Submittals,_VNVP_141207.pdf PDF
14_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].dwf DWF file
12_-_Past_and_Present_Performance_Questionnaire_Sheet.pdf PDF
1_-_General_Requirements.pdf PDF
20_-_Blank_Schedule_B,_VNVP_141207.pdf PDF
15_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].pdf PDF
9_-_WD_-_TX180299_-_Grayson_Building.pdf PDF
10_-_Base_Pass_Form_151.pdf PDF
4_-_WD_-_OK180070_-_Tillman_Building.pdf PDF
8_-_WD_-_TX180085_-_Grayson_Heavy.pdf PDF
5_-_WD_-_TX180012_-_Wichita_Cty_Heavy-Hwy.pdf PDF
19_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
6_-_WD_-_TX180326_-_Wichita_Cty_Bldg.pdf PDF
13_-Statement_of_Work,_VNVP_141207.pdf PDF
3_-_WD_-_OK180036_-_Tillman_Heavy.pdf PDF
7_-_WD_-_TX180035_-_Grayson_Highway.pdf PDF
2_-_WD_-_OK180018_-_Tillman_Highway.pdf PDF
Sheppard_AFB_MACC_Solicitation_-FA3020-18-R-0008.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VNVP
141207141207 Repair Tech Training Facility, B10187
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALPRE CONSTRUCTION SUBMITTALSSHOP DRAWINGSPRODUCT DATASAMPLES / COLOR SELECTIONDESIGN DATATEST REPORTSCERTIFICATESMANUFACTURER'S INSTRUCTIONSMANUFACTURER'S FIELD REPORTSOPERATIONS AND MAITENANCE DATACLOSE OUT SUBMITTALS

REQUIRED SUBMITTAL

DATE

DATE RECEIVED IN CONTRACTINGDATE TO
CIVIL ENGINEERRETURN SUSPENSE DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
SD-01SD-02SD-03SD-04SD-05SD-06SD-07SD-08SD-09SD-10SD-11APPROVEDDISAPPROVED
1* AF Form 103 - Section 01 11 00EPrior to start of any work
2Existing Damage - Section 01 11 00EPrior to start of any work
3List of Contact Personnel - Section 01 14 00EWithin 10 days of NTP
4Construction Schedule - Section 01 32 16.00 20EPrior to start of any work
5Schedule of Work - Section 01 35 13EPrior to start of any work
6List of Personnel - Section 01 35 13EPrior to start of any work
7List of POVs - Section 01 35 13EPrior to start of any work
8Accident Prevention Plan - Section 01 35 26EPrior to start of any work
9Activity Hazard Analysis - Section 01 35 26EAs required by Specification
10Crane Critical Lift Plan - Section 01 35 26EAs required by Specification
11Proof of qualifications of Crane Operator - Section 01 35 26EAs required by Specification
12FAA Notice of Proposed Construction - Section 01 35 26EAs required by Specification
13Accident Reports - Section 01 35 26EAs required by Specification
14Crane Reports - Section 01 35 26EAs required by Specification
15Confined Space Entry Permit - Section 01 35 26EAs required by Specification
16Hot work permit - Section 01 35 26EAs required by Specification
17License Certificates - Section 01 35 26EAs required by Specification
18Hazardous Material Documentation - Section 01 35 26EAs required by Specification
19CQC Plan - Section 01 45 00.00 10EPrior to start of any work
20* CQC Daily Reports - Section 01 45 00.00 10EAs required by Specification
21Traffic Control Plan - Section 01 50 00EPrior to start of any work
22Backflow Preventers - Section 01 50 00EAs required by Specification
23Backflow Preventer Test - Section 01 50 00EAs required by Specification
24Backflow Tester Certification - Section 01 50 00EAs required by Specification
25Backflow Preventers Certificate of Full Approval - Section 01 50 00EAs required by Specification
26Environmental Protection Plan - Section 01 57 20.00 10EPrior to start of any work
27Packaging - Section 01 57 20.00 10EAs required by Specification
28* Field Quality Control Reports - Section 01 57 20.00 10EAs required by Specification
29EMS Awareness-Level Training - Section 01 57 20.00 10EPrior to start of any work
30Environmental Regulatory Requirements - Section 01 57 20.00 10EAs required by Specification
31Material Safety Data Sheets - Section 01 57 20.00 10EPrior to start of any work
32Protection of Natural Resources - Section 01 57 20.00 10EAs required by Specification
33Prohibited Material Certification - Section 01 57 20.00 10EAs required by Specification
34Non-Hazardous Solid Waste Diversion Report - Section 01 57 20.00 10EAs required by Specification
35Erosion and Sediment Controls - Section 01 57 23EAs required by Specification
36Mill Certificate or Affidavit - Section 01 57 23EAs required by Specification
37Green Procurement Reporting Form - Section 01 62 35EAs required by Specification
38Surveying Subcontractor - Section 01 71 23.16EPrior to start of any work
39Topographical and Physical Feature Field survey - Section 01 71 23.16EAs required by Specification
40Waste Management Plan - Section 01 74 19EPrior to start of any work
41Records - Section 01 74 19EAs required by Specification
42Warranty Binder - Section 01 78 00EAs required by Specification
43Final Cleaning - Section 01 78 00EAs required by Specification
44Spare Parts Data - Section 01 78 00EAs required by Specification
45Posted Instructions - Section 01 78 00EAs required by Specification
46Operation and Maintenance Manuals - Section 01 78 00EAs required by Specification
47As-Built Drawings - Section 01 78 003As required by Specification
48Record Drawings - Section 01 78 003As required by Specification
49Final Approved Shop Drawings - Section 01 78 00EAs required by Specification
50Certification of EPA Designated Items - Section 01 78 00EAs required by Specification
51Form DD1354 - Section 01 78 00EAs required by Specification
52O&M Database - Section 01 78 23EAs required by Specification
53Demolition Plan - Section 02 41 00EAs required by Specification
54Disposal Receipts - Section 02 41 00EAs required by Specification
55Installation Drawings - Section 03 30 53EAs required by Specification
56Portland Cement - Section 03 30 53EAs required by Specification
57Fly Ash - Section 03 30 53EAs required by Specification
58Aggregates - Section 03 30 53EAs required by Specification
59Air-Entraining Admixture - Section 03 30 53EAs required by Specification
60Water-Reducting and/or Retarding Admixture - Section 03 30 53EAs required by Specification
61Reinforcement - Section 03 30 53EAs required by Specification
62Form Work - Section 03 30 53EAs required by Specification
63Curing Materials - Section 03 30 53EAs required by Specification
64Ready-Mix Concrete Mix Design Data - Section 03 30 53EAs required by Specification
65Aggregates - Section 03 30 53EAs required by Specification
66Concrete Mixture Proportions - Section 03 30 53EAs required by Specification
67Compressive Strength Testing - Section 03 30 53EAs required by Specification
68Air Content - Section 03 30 53EAs required by Specification
69Slump - Section 03 30 53EAs required by Specification
70Cementitious Materials - Section 03 30 53EAs required by Specification
71Batch Tickets - Section 03 30 53EAs required by Specification
72NRMCA Plant Certification - Section 03 30 53EAs required by Specification
73Reinforcement Detail Drawings - Section 04 20 00EAs required by Specification
74Hot Weather Procedures - Section 04 20 00EAs required by Specification
75Cold Weather Procedures - Section 04 20 00EAs required by Specification
76Clay or Shale Brick - Section 04 20 00EAs required by Specification
77Joint Reinforcement - Section 04 20 00EAs required by Specification
78Anchors, Ties, and Bar positioners - Section 04 20 00EAs required by Specification
79Masonry Mortar and Admixtures - Section 04 20 00EAs required by Specification
80Clay Masonry Expansion-Joint Materials - Section 04 20 00EAs required by Specification
81Clay or Shale Brick - Section 04 20 001As required by Specification
82Mock-Up Panel - Section 04 20 001As required by Specification
83Efflorescence Test - Section 04 20 00EAs required by Specification
84Field Testing of Mortar - Section 04 20 00EAs required by Specification
85Single-Wythe Msonry Wall Water Penetration Test - Section 04 20 00EAs required by Specification
86Admixtures for Masonry Mortar - Section 04 20 00EAs required by Specification
87Admixtures for Grout - Section 04 20 00EAs required by Specification
88Anchors, Ties and Bar Positioners - Section 04 20 00EAs required by Specification
89Joint Reinforcement - Section 04 20 00EAs required by Specification
90Admixtures for Masonry Mortar - Section 04 20 00EAs required by Specification
91Admixtures for Grout - Section 04 20 00EAs required by Specification
92Take-Back Program - Section 04 20 00EAs required by Specification
93Framing Components - Section 05 40 00EAs required by Specification
94Truss Assembly Components Including Framing Members, Bracing, Bridging, Anchoring, and Accessories - Section 05 40 00EAs required by Specification
95Metal Framing Calculations - Section 05 40 00EAs required by Specification
96Load-Bearing Cold-Formed Metal - Section 05 40 00EAs required by Specification
97Framing Welds - Section 05 40 00EAs required by Specification
98Blanket insulation - Section 07 21 16EAs required by Specification
99Accessories - Section 07 21 16EAs required by Specification
100Sheathing Board - Section 07 24 00EAs required by Specification
101Adhesive - Section 07 24 00EAs required by Specification
102Mechanical Fasteners - Section 07 24 00EAs required by Specification
103Accessories - Section 07 24 00EAs required by Specification
104Base Coat - Section 07 24 00EAs required by Specification
105Portland Cement - Section 07 24 00EAs required by Specification
106Reinforcing Fabric - Section 07 24 00EAs required by Specification
107Finish Coat - Section 07 24 00EAs required by Specification
108Joint Sealant - Section 07 24 00EAs required by Specification
109Sealant Primer - Section 07 24 00EAs required by Specification
110Bond Breaker - Section 07 24 00EAs required by Specification
111Backer Rod - Section 07 24 00EAs required by Specification
112Insulation - Section 07 24 00EAs required by Specification
113Board Warranty - Section 07 24 00EAs required by Specification
114Sample Boards - Section 07 24 001As required by Specification
115Color and Texture - Section 07 24 001As required by Specification
116Mock-up Installation of EIFS - Section 07 24 001As required by Specification
117Wind Load Calculations - Section 07 24 00EAs required by Specification
118Moisture Analysis Calculations - Section 07 24 00EAs required by Specification
119Abrasion Resistance - Section 07 24 00EAs required by Specification
120Accelerated Weathering - Section 07 24 00EAs required by Specification
121Impact Resistance - Section 07 24 00EAs required by Specification
122Mildew Resistance - Section 07 24 00EAs required by Specification
123Salt Spray Resistance - Section 07 24 00EAs required by Specification
124Water Vapor Transmission - Section 07 24 00EAs required by Specification
125Absorption-Freeze-Thaw - Section 07 24 00EAs required by Specification
126Wall Fire Test - Section 07 24 00EAs required by Specification
127Water Penetration - Section 07 24 00EAs required by Specification
128Water Resistance - Section 07 24 00EAs required by Specification
129Full Scale or Intermediate Scale Fire Test - Section 07 24 00EAs required by Specification
130Surface Burning Characteristics - Section 07 24 00EAs required by Specification
131Radiant Heat - Section 07 24 00EAs required by Specification
132Substrate - Section 07 24 00EAs required by Specification
133Wind Load - Section 07 24 00EAs required by Specification
134Qualifications of EIFS Manufacturer - Section 07 24 00EAs required by Specification
135Qualification of EIFS Installer - Section 07 24 00EAs required by Specification
136Qualification of Sealant Applicator - Section 07 24 00EAs required by Specification
137Certify that EIFS installer meets requirements specified under paragraph "Qualification of Installer," and that sealant applicator is approved by the EIFS Manufacturer. - Section 07 24 00EAs required by Specification
138Qualifications of Third Party Inspector - Section 07 24 00EAs required by Specification
139Inspection Check List - Section 07 24 00EAs required by Specification
140Installation - Section 07 24 00EAs required by Specification
141EIFS - Section 07 24 00EAs required by Specification
142Product Data - Section 07 92 00EAs required by Specification
143Doors - Section 08 11 13EAs required by Specification
144Frames - Section 08 11 13EAs required by Specification
145Accessories - Section 08 11 13EAs required by Specification
146Porduct Data - Section 08 41 13EAs required by Specification
147Color Chart - Section 08 41 131As required by Specification
148Installation Instructions - Section 08 41 13EAs required by Specification
149Shop Drawings - Section 08 41 13EAs required by Specification
150Test Reports - Section 08 41 13EAs required by Specification
151Hardware Schedule - Section 08 71 00EAs required by Specification
152Hardware items - Section 08 71 00EAs required by Specification
153Each exposed finish - Section 08 71 00EAs required by Specification
154Product certificates - Section 08 71 00EAs required by Specification
155Installation - Section 08 71 00EAs required by Specification
156Solid Vinyl Floor Tile - Section 09 65 00EAs required by Specification
157Resilient Wall Base - Section 09 65 00EAs required by Specification
158Installation Materials - Section 09 65 00EAs required by Specification
159Solid Vinyl Floor Tile - Section 09 65 001As required by Specification
160Resilient Wall Base - Section 09 65 001As required by Specification
161Product Data - Section 09 90 00EAs required by Specification
162Samples - Section 09 90 00EAs required by Specification
163Applicator's qualifications - Section 09 90 00EAs required by Specification
164Application instructions - Section 09 90 00EAs required by Specification
165Mixing - Section 09 90 00EAs required by Specification
166Manufacturer's Material Safety Data Sheets - Section 09 90 00EAs required by Specification
167Manufacturer's Qualifications - Section 13 34 19EAs required by Specification
168Detail Drawings - Section 13 34 19EAs required by Specification
169Product Data - Section 13 34 19EAs required by Specification
170Manufacturer's catalog data - Section 13 34 19EAs required by Specification
171Coil Stock - Section 13 34 19EAs required by Specification
172Roof Panels - Section 13 34 19EAs required by Specification
173Fasteners - Section 13 34 19EAs required by Specification
174Metal Closure Strips - Section 13 34 19EAs required by Specification
175Insulation - Section 13 34 19EAs required by Specification
176Vapor Barrier - Section 13 34 19EAs required by Specification
177Manufacturer's color charts and chips - Section 13 34 191As required by Specification
178Manufacturer's descriptive and technical literature - Section 13 34 19EAs required by Specification
179Manufacturer's building design analysis - Section 13 34 19EAs required by Specification
180Test reports - Section 13 34 19EAs required by Specification
181Coatings and base metals - Section 13 34 19EAs required by Specification
182Factory Color Finish Performance Requirements - Section 13 34 19EAs required by Specification
183System components - Section 13 34 19EAs required by Specification
184Coil Stock certification - Section 13 34 19EAs required by Specification
185Aluminized Steel Repair Paint - Section 13 34 19EAs required by Specification
186Galvanizing Repair Paint - Section 13 34 19EAs required by Specification
187Enamel Repair Paint - Section 13 34 19EAs required by Specification
188Qualification of Manufacturer - Section 13 34 19EAs required by Specification
189Qualification of Erector - Section 13 34 19EAs required by Specification
190Installation of Roof and Wall panels - Section 13 34 19EAs required by Specification
191Shipping, handling, and storage - Section 13 34 19EAs required by Specification
192Manufacturer's Warranty - Section 13 34 19EAs required by Specification
193Contractor's Warranty for Installation - Section 13 34 19EAs required by Specification
194Material, Equipment, and Fixture Lists - Sec 26 05 00.00 40EAs required by Specification
195Conduits, Raceways and Fittings - Sec 26 05 00.00 40EAs required by Specification
196Wire and Cable - Sec 26 05 00.00 40EAs required by Specification
197Splices and Connectors - Sec 26 05 00.00 40EAs required by Specification
198Switches - Sec 26 05 00.00 40EAs required by Specification
199Receptacles - Sec 26 05 00.00 40EAs required by Specification
200Outlets, Outlet Boxes, and Pull Boxes - Sec 26 05 00.00 40EAs required by Specification
201Circuit Breakers - Sec 26 05 00.00 40EAs required by Specification
202Panelboards - Sec 26 05 00.00 40EAs required by Specification
203Lamps and Lighting Fixtures - Sec 26 05 00.00 40EAs required by Specification
204Spare Parts - Sec 26 05 00.00 40EAs required by Specification
205Certification - Sec 26 05 00.00 40EAs required by Specification
206Continuity Test - Sec 26 05 00.00 40EAs required by Specification
207Phase Rotation Tests - Sec 26 05 00.00 40EAs required by Specification
208Insulation Resistance Test - Sec 26 05 00.00 40EAs required by Specification
209Manufacturer's Instructions - Sec 26 05 00.00 40EAs required by Specification
210Shop Drawings - Section 26 24 16.00 403As required by Specification
211Panelboards - Section 26 24 16.00 403As required by Specification
212Directory Card and Holder - Section 26 24 16.00 403As required by Specification
213Keys - Section 26 24 16.00 403As required by Specification
214Continuity Test - Section 26 24 16.00 403As required by Specification
215Insulation Test - Section 26 24 16.00 403As required by Specification
216Certificates - Section 26 24 16.00 403As required by Specification
217Manufacturer's Instructions - Section 26 24 16.00 403As required by Specification
218Equipment - Section 31 00 00EAs required by Specification
219Borrow Material - Section 31 00 00EAs required by Specification
220Testing - Section 31 00 00EAs required by Specification
221Testing - Section 31 00 00EAs required by Specification
222Gate Assembly - Section 32 31 26EAs required by Specification
223Gate Hardware and Accessories - Section 32 31 26EAs required by Specification
224Concrete - Section 32 31 26EAs required by Specification
225Line, Corner, End, and Pull Posts - Section 32 31 26EAs required by Specification
226Rails- Section 32 31 26EAs required by Specification
227Fence Fabric - Section 32 31 26EAs required by Specification
228Tension Wire - Section 32 31 26EAs required by Specification
229Barbed Wire - Section 32 31 26EAs required by Specification
230Barbed Wire Extension Arms - Section 32 31 26EAs required by Specification
231Ductless AHU and CompressorEEE
232Exhaust FanEEE
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual Specification Sections for detailed submittal requirements and instructions.

FA4600-11-B-0025

Attachment 3 Page &P

* Items to be provided but not on an AF3000. &P of &N E - Electronic