21. Sheppard/Altus MACC - Sample/Seed Project Specific Clauses, VNVP 141207

View the file

Other files

File Type Posted
FA3020-18-R-0008_-_Amend_7.pdf PDF
31_-_Responses_to_Contractor_Questions_Amend_7.pdf PDF
FA3020-18-R-0008_-_Amend_6.pdf PDF
30_-_Responses_to_Contractor_Questions_Amend_6.pdf PDF
FA3020-18-R-0008_-_Amend_5.pdf PDF
29_-_Responses_to_Contractor_Questions_Amend_5.pdf PDF
FA3020-18-R-0008_-_Amend_3.pdf PDF
28_-_Responses_to_Contractor_Questions_Amend_4.pdf PDF
FA3020-18-R-0008_-_Amend_4.pdf PDF
18A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
13A_-Statement_of_Work,_VNVP_141207.pdf PDF
26_-_Site_Visit_Sign_In_Sheets.pdf PDF
19A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
25_-_Site_Visit_Informational_Slides.pdf PDF
27_-_Response_to_Contractor_Question_Amend_3.pdf PDF
24_-_Response_to_Contractor_Question_Amend_2.pdf PDF
FA3020-18-R-0008_-_Amend_2.pdf PDF
22_-_Map_from_Missile_Gate_to_Bldg_1662.pdf PDF
FA3020-18-R-0008_Amend_1.pdf PDF
23_-_Map_from_Main_Gate_to_Bldg_1662.pdf PDF
18_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
11_-_Disclosure_of_Lobbying_Activities,_SF_LLL.pdf PDF
17_-_List_of_Material_Submittals,_VNVP_141207.pdf PDF
14_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].dwf DWF file
12_-_Past_and_Present_Performance_Questionnaire_Sheet.pdf PDF
1_-_General_Requirements.pdf PDF
20_-_Blank_Schedule_B,_VNVP_141207.pdf PDF
15_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].pdf PDF
9_-_WD_-_TX180299_-_Grayson_Building.pdf PDF
10_-_Base_Pass_Form_151.pdf PDF
4_-_WD_-_OK180070_-_Tillman_Building.pdf PDF
8_-_WD_-_TX180085_-_Grayson_Heavy.pdf PDF
5_-_WD_-_TX180012_-_Wichita_Cty_Heavy-Hwy.pdf PDF
19_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
6_-_WD_-_TX180326_-_Wichita_Cty_Bldg.pdf PDF
16_-_List_of_Material_Submittals,_VNVP_141207.xlsx XLSX spreadsheet
13_-Statement_of_Work,_VNVP_141207.pdf PDF
3_-_WD_-_OK180036_-_Tillman_Heavy.pdf PDF
7_-_WD_-_TX180035_-_Grayson_Highway.pdf PDF
2_-_WD_-_OK180018_-_Tillman_Highway.pdf PDF
Sheppard_AFB_MACC_Solicitation_-FA3020-18-R-0008.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $308.10 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by (NOT APPLICABLE).

(b) Weather conditions: The following table reflects historical meteorological data obtained from the 80th Operations Support Squadron, Weather Operations Flight, Sheppard, AFB, Texas, and will be used to evaluate requests for time extensions due to abnormal weather. These calculations are used to determine the periods of performance at Sheppard AFB, TX. Requests for time extensions due to poor weather conditions will only be considered if the conditions present during performance exceed the climatic data listed in the below chart.

MONTH MEAN NUMBER

OF DAYS WITH

PRECIPITATION

MONTHLY MEAN

OF

PRECIPITATION

IN INCHES

MONHTLY

MEAN RELATIVE

HUMIDITY

MONTHLY MEAN

OF HIGH/LOW

TEMPERATURES

January 4.50 1.10 47-78% 57/34 February 4.60 1.40 47-78% 61/37 March 6.30 2.00 42-77% 70/45 April 8.50 2.70 43-79% 78/53 May 13.20 4.10 47-84% 86/63 June 8.60 3.40 44-83% 91/70 July 11.90 1.80 37-76% 97/74

August 8.30 2.30 36-76% 97/74 September 10.20 3.00 41-81% 89/65

October 7.90 2.80 43-81% 78/55 November 6.90 1.50 44-79% 67/44 December 6.90 1.40 47-78% 57/34

(c) Transportation facilities (NOT APPLICABLE)

(d) (NOT APPLICABLE).

(End of clause)