18_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Sheppard/Altus AFB Multiple Award Construction Contract (MACC) - FA3020-18-R-0008
Solicitation number
FA3020-18-R-0008
Issued by

About this file

18. Sheppard/Altus MACC - Sample/Seed Project Cost Estimate Breakdown (Excel), VNVP 141207

View the file

Other files

File Type Posted
FA3020-18-R-0008_-_Amend_7.pdf PDF
31_-_Responses_to_Contractor_Questions_Amend_7.pdf PDF
FA3020-18-R-0008_-_Amend_6.pdf PDF
30_-_Responses_to_Contractor_Questions_Amend_6.pdf PDF
FA3020-18-R-0008_-_Amend_5.pdf PDF
29_-_Responses_to_Contractor_Questions_Amend_5.pdf PDF
FA3020-18-R-0008_-_Amend_3.pdf PDF
28_-_Responses_to_Contractor_Questions_Amend_4.pdf PDF
FA3020-18-R-0008_-_Amend_4.pdf PDF
18A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
13A_-Statement_of_Work,_VNVP_141207.pdf PDF
26_-_Site_Visit_Sign_In_Sheets.pdf PDF
19A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
25_-_Site_Visit_Informational_Slides.pdf PDF
27_-_Response_to_Contractor_Question_Amend_3.pdf PDF
24_-_Response_to_Contractor_Question_Amend_2.pdf PDF
FA3020-18-R-0008_-_Amend_2.pdf PDF
22_-_Map_from_Missile_Gate_to_Bldg_1662.pdf PDF
FA3020-18-R-0008_Amend_1.pdf PDF
23_-_Map_from_Main_Gate_to_Bldg_1662.pdf PDF
21_-_Sample_Project_Specific_Clauses.pdf PDF
11_-_Disclosure_of_Lobbying_Activities,_SF_LLL.pdf PDF
17_-_List_of_Material_Submittals,_VNVP_141207.pdf PDF
14_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].dwf DWF file
12_-_Past_and_Present_Performance_Questionnaire_Sheet.pdf PDF
1_-_General_Requirements.pdf PDF
20_-_Blank_Schedule_B,_VNVP_141207.pdf PDF
15_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].pdf PDF
9_-_WD_-_TX180299_-_Grayson_Building.pdf PDF
10_-_Base_Pass_Form_151.pdf PDF
4_-_WD_-_OK180070_-_Tillman_Building.pdf PDF
8_-_WD_-_TX180085_-_Grayson_Heavy.pdf PDF
5_-_WD_-_TX180012_-_Wichita_Cty_Heavy-Hwy.pdf PDF
19_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
6_-_WD_-_TX180326_-_Wichita_Cty_Bldg.pdf PDF
16_-_List_of_Material_Submittals,_VNVP_141207.xlsx XLSX spreadsheet
13_-Statement_of_Work,_VNVP_141207.pdf PDF
3_-_WD_-_OK180036_-_Tillman_Heavy.pdf PDF
7_-_WD_-_TX180035_-_Grayson_Highway.pdf PDF
2_-_WD_-_OK180018_-_Tillman_Highway.pdf PDF
Sheppard_AFB_MACC_Solicitation_-FA3020-18-R-0008.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Repair Tech Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:$ - 0
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.SummaryUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1General Conditions - See attached breakout$ - 0
2Civil - See attached breakout$ - 0
3Architectural - See attached breakout$ - 0
4Mechanical - See attached breakout$ - 0
5Communications - See attached breakout$ - 0
6Electrical - See attached breakout$ - 0
7Sub-Total$ - 0
8General Contractor Overhead & Profit @ %
9Subtotal$ - 0
10Bond %
11Total$ - 0

&A

General Conditions

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Repair Tech Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.General ConditionsUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Mobilization/demobilizationLOT$ - 0$ - 0$ - 0$ - 0
230 CY dumpster weekly rental (7 Ton), 1 dump per weekWK$ - 0$ - 0$ - 0$ - 0
3Dump chargesTON$ - 0$ - 0$ - 0$ - 0
4Cleanup (daily and final)LOT$ - 0$ - 0$ - 0$ - 0
5Temporary SanitationWK$ - 0$ - 0$ - 0$ - 0
6Project ManagerWeek$ - 0$ - 0$ - 0$ - 0
7SuperintendentWeek$ - 0$ - 0$ - 0$ - 0
8General Conditions Sub-Total$ - 0

&A

Civil

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Repair Tech Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.CIVILUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Clean, remove and dispose fuel tank completeLS$ - 0$ - 0$ - 0$ - 0
2Demo and dispose concrete rentention structure complete.LS$ - 0$ - 0$ - 0$ - 0
3Remove HDPE liner beneath concrete and test for hydrocarbonsLS$ - 0$ - 0$ - 0$ - 0
4Remove fence posts and concrete footingsLS$ - 0$ - 0$ - 0$ - 0
5Demo and dispose buildingCF$ - 0$ - 0$ - 0$ - 0
6Remove weeds and vegitationSF$ - 0$ - 0$ - 0$ - 0
7Remove fence, gate and postsLS$ - 0$ - 0$ - 0$ - 0
8Demo and dispose concrete slabsSF$ - 0$ - 0$ - 0$ - 0
9TestingLOT$ - 0$ - 0$ - 0$ - 0
10SurveyingLS$ - 0$ - 0$ - 0$ - 0
11New reinforced concrete padsLS$ - 0$ - 0$ - 0$ - 0
12Backfill & grade concrete demoSF$ - 0$ - 0$ - 0$ - 0
13Grade gravelSF$ - 0$ - 0$ - 0$ - 0
14Plug site conduitLS$ - 0$ - 0$ - 0$ - 0
15New gates completeLS$ - 0$ - 0$ - 0$ - 0
16New fence posts in concreteLS$ - 0$ - 0$ - 0$ - 0
17Install salvaged chain link fabricLS$ - 0$ - 0$ - 0$ - 0
18New barbed wire assemblyLS$ - 0$ - 0$ - 0$ - 0
19New corner post fence assemblyLS$ - 0$ - 0$ - 0$ - 0
20Subtotal$ - 0
21Prime Contractor Overhead%
22Subtotal$ - 0
23Prime Contractor Profit%
24Subtotal$ - 0
25Bond%
26Total$ - 0

Civil

Architectural

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Repair Tech Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.ARCHITECTURALUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Remove existing VCT floor tile, clean and prep floor.SF$ - 0$ - 0$ - 0$ - 0
2Pre-engineered steel trusses with 24 ga standing seam metal roof, misc. roof structure and trimLS$ - 0$ - 0$ - 0$ - 0
3Scarify concrete and apply bonding agent for new curbSF$ - 0$ - 0$ - 0$ - 0
4Drill reinforced concrete slab up to 6" thickEA$ - 0$ - 0$ - 0$ - 0
51/2" diam. concrete chemical anchorsEA$ - 0$ - 0$ - 0
6Reinforced concrete curbLF$ - 0$ - 0$ - 0$ - 0
716 ga 3 5/8" Metal studs, 16" o.c. plus misc framing and sill anchoringLF$ - 0$ - 0$ - 0$ - 0
8R-13 un-faced batt insulationSF$ - 0$ - 0$ - 0$ - 0
9R38 craft faced batt insulationSF$ - 0$ - 0$ - 0$ - 0
105/8" thick gyp bd, with tape & bed and level 5 skim coatSF$ - 0$ - 0$ - 0$ - 0
11Paint walls complete including surface prep, primer and 2 coats of paint on drywall with rollerSF$ - 0$ - 0$ - 0$ - 0
12Add 10% for light texture%$ - 0$ - 0$ - 0$ - 0
13VCT 12"x12", 1/8" Thick MarbleizedSF$ - 0$ - 0$ - 0$ - 0
14Resiliant Base, Rubber or Vinyl 4" highLF$ - 0$ - 0$ - 0$ - 0
15Gyp sheathingSF$ - 0$ - 0$ - 0$ - 0
16Modular brick veneerSF$ - 0$ - 0$ - 0$ - 0
17RowlockLF$ - 0$ - 0$ - 0$ - 0
18Brick tiesEA$ - 0$ - 0$ - 0$ - 0
191/2" AC Grade PlywoodSF$ - 0$ - 0$ - 0$ - 0
201" Drainable PM class EIFSSF$ - 0$ - 0$ - 0$ - 0
21Heavy duty mesh reinf. AddSF$ - 0$ - 0$ - 0$ - 0
22EIFS Control JointLF$ - 0$ - 0$ - 0$ - 0
23Spray applied moisture barrierSF$ - 0$ - 0$ - 0$ - 0
24FlashingSF$ - 0$ - 0$ - 0$ - 0
25SealantLF$ - 0$ - 0$ - 0$ - 0
263ft x 7ft HM door frameEA$ - 0$ - 0$ - 0$ - 0
273ft x 7ft HM doorsEA$ - 0$ - 0$ - 0$ - 0
28Door HardwareSet$ - 0$ - 0$ - 0$ - 0
29Paint new HM door, flush both sides including frameLS$ - 0$ - 0$ - 0$ - 0
30Paint plywoodSF$ - 0$ - 0$ - 0$ - 0
31Gutter, eave type, 26 ga, prefinishedLF$ - 0$ - 0$ - 0$ - 0
32DownspoutsLF$ - 0$ - 0$ - 0$ - 0
33Concrete splash blocksEA$ - 0$ - 0$ - 0
34Aluminum building number signEA$ - 0$ - 0$ - 0$ - 0
353x6 anod. aluminum window with Low-E glassEA$ - 0$ - 0$ - 0$ - 0
363x4 anod. aluminum window with Low-E glassEA$ - 0$ - 0$ - 0$ - 0
37New suspended gyp bd ceiling assemblySF$ - 0$ - 0$ - 0$ - 0
38Tape, bed ceiling gyp bd walls with level 5 skim coatSF$ - 0$ - 0$ - 0$ - 0
39New ceiling access doorEA$ - 0$ - 0$ - 0$ - 0
40Paint ceilings complete including surface prep, primer and 2 coats of paint on drywall with rollerSF$ - 0$ - 0$ - 0$ - 0
41Add 10% for light texture%$ - 0$ - 0$ - 0$ - 0
42Subtotal$ - 0
43Prime Contractor Overhead%
44Subtotal$ - 0
45Prime Contractor Profit%
46Subtotal$ - 0
47Bond%
48Total$ - 0

Architectural

Mechanical

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Repair Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.MECHANICALUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Install Ductless HVAC SystemEA$ - 0$ - 0$ - 0$ - 0
2Install Exhaust FanEA$ - 0$ - 0$ - 0$ - 0
3Install Exhaust Fan ChimneyEA$ - 0$ - 0$ - 0$ - 0
4Install Return Air Grill w/filterEA$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15Prime Contractor Overhead%$ - 0
16Prime Contractor Profit%$ - 0
17Bond%$ - 0
18Total$ - 0

Mechanical

Comm

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR: Repair Tech Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.COMMUNICATIONSUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Data/Voice DropsLS$ - 0$ - 0$ - 0$ - 0
2Directional BoringLF$ - 0$ - 0$ - 0$ - 0
3New Hand HolesLS$ - 0$ - 0$ - 0$ - 0
Wall Mount CabinetLS$ - 0$ - 0$ - 0$ - 0
4LabelingLS$ - 0$ - 0$ - 0$ - 0
5Major SplicesLS$ - 0$ - 0$ - 0$ - 0
6SMFO CableLF$ - 0$ - 0$ - 0$ - 0
7Georextile Inner Duct (Maxcell)LF$ - 0$ - 0$ - 0$ - 0
8ConduitLF$ - 0$ - 0$ - 0$ - 0
9Trenching /BackfillLF$ - 0$ - 0$ - 0$ - 0
10TestingLS$ - 0$ - 0$ - 0$ - 0
11Mic Materials (patch pannels, FO pannels)LS$ - 0$ - 0$ - 0$ - 0
12Subtotal$ - 0
13Prime Contractor Overhead%
14Subtotal$ - 0
15Prime Contractor Profit%
16Subtotal$ - 0
17Bond%
18Total$ - 0

Communications

Electrical

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR: Repair Tech Training Facility, B10187PROPOSED TOTAL CONTRACT PRICE:
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 141207WORK LOCATION: Sheppard AFB, TX
LINE NO.ELECTRICALUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Electrical demolition & cleanupLS$ - 0$ - 0$ - 0$ - 0
2Electrical panelboards, complete install. (incl. main & branch CBs for active exterior circuit reconnections )EA$ - 0$ - 0$ - 0$ - 0
3Electrical racksEA$ - 0$ - 0$ - 0$ - 0
4SE & exterior circuit mods (incl. any trenching, excavation, backfilling, etc.)LS$ - 0$ - 0$ - 0$ - 0
5Ground rods, cadwelds, etc.LS$ - 0$ - 0$ - 0$ - 0
6All new 20A, 120V receptacles, complete install.EA$ - 0$ - 0$ - 0$ - 0
7LED fixtures, interiorEA$ - 0$ - 0$ - 0$ - 0
8LED fixtures, exteriorEA$ - 0$ - 0$ - 0$ - 0
9New occupancy sensorsEA$ - 0$ - 0$ - 0$ - 0
10New wall switch+dimmersEA$ - 0$ - 0$ - 0$ - 0
11New wall switchesEA$ - 0$ - 0$ - 0$ - 0
12Structural support (outlet boxes, hangers, etc.)SF$ - 0$ - 0$ - 0$ - 0
13Lighting wiring (conduit, conductors, etc.)SF$ - 0$ - 0$ - 0$ - 0
14HVAC unit installation, complete (including wires, conduits, etc.)EA$ - 0$ - 0$ - 0$ - 0
15LV testing, completeLS$ - 0$ - 0$ - 0$ - 0
16Labeling, completeLS$ - 0$ - 0$ - 0$ - 0
17SuperintendentLS$ - 0$ - 0$ - 0$ - 0
18Contractor Overhead%$ - 0
19Contractor Profit%$ - 0
20Bond%$ - 0
21Totals$ - 0$ - 0$ - 0$ - 0

Electrical

File details come from the government source that posted it.