25_-_Site_Visit_Informational_Slides.pdf

PDF 374 KB Posted

Attached to
Sheppard/Altus AFB Multiple Award Construction Contract (MACC) - FA3020-18-R-0008
Solicitation number
FA3020-18-R-0008
Issued by

About this file

25 - Sheppard/Altus MACC Site Visit Informational Slides

View the file

Other files

File Type Posted
FA3020-18-R-0008_-_Amend_7.pdf PDF
31_-_Responses_to_Contractor_Questions_Amend_7.pdf PDF
FA3020-18-R-0008_-_Amend_6.pdf PDF
30_-_Responses_to_Contractor_Questions_Amend_6.pdf PDF
FA3020-18-R-0008_-_Amend_5.pdf PDF
29_-_Responses_to_Contractor_Questions_Amend_5.pdf PDF
FA3020-18-R-0008_-_Amend_3.pdf PDF
28_-_Responses_to_Contractor_Questions_Amend_4.pdf PDF
FA3020-18-R-0008_-_Amend_4.pdf PDF
18A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
13A_-Statement_of_Work,_VNVP_141207.pdf PDF
26_-_Site_Visit_Sign_In_Sheets.pdf PDF
19A_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
27_-_Response_to_Contractor_Question_Amend_3.pdf PDF
24_-_Response_to_Contractor_Question_Amend_2.pdf PDF
FA3020-18-R-0008_-_Amend_2.pdf PDF
22_-_Map_from_Missile_Gate_to_Bldg_1662.pdf PDF
FA3020-18-R-0008_Amend_1.pdf PDF
23_-_Map_from_Main_Gate_to_Bldg_1662.pdf PDF
18_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.xlsx XLSX spreadsheet
21_-_Sample_Project_Specific_Clauses.pdf PDF
11_-_Disclosure_of_Lobbying_Activities,_SF_LLL.pdf PDF
17_-_List_of_Material_Submittals,_VNVP_141207.pdf PDF
14_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].dwf DWF file
12_-_Past_and_Present_Performance_Questionnaire_Sheet.pdf PDF
1_-_General_Requirements.pdf PDF
20_-_Blank_Schedule_B,_VNVP_141207.pdf PDF
15_-_Drawings,_141207_Rpr_Trng_Fclty_B10187_[24x36_FBPO].pdf PDF
9_-_WD_-_TX180299_-_Grayson_Building.pdf PDF
10_-_Base_Pass_Form_151.pdf PDF
4_-_WD_-_OK180070_-_Tillman_Building.pdf PDF
8_-_WD_-_TX180085_-_Grayson_Heavy.pdf PDF
5_-_WD_-_TX180012_-_Wichita_Cty_Heavy-Hwy.pdf PDF
19_-_Cost_Estimate_Breakdown,_VNVP_141207_(10187)_-_Blank.pdf PDF
6_-_WD_-_TX180326_-_Wichita_Cty_Bldg.pdf PDF
16_-_List_of_Material_Submittals,_VNVP_141207.xlsx XLSX spreadsheet
13_-Statement_of_Work,_VNVP_141207.pdf PDF
3_-_WD_-_OK180036_-_Tillman_Heavy.pdf PDF
7_-_WD_-_TX180035_-_Grayson_Highway.pdf PDF
2_-_WD_-_OK180018_-_Tillman_Highway.pdf PDF
Sheppard_AFB_MACC_Solicitation_-FA3020-18-R-0008.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Train, develop, and inspire the world’s premier Airmen to power the world’s greatest Air Force!

Sheppard/Altus AFB Multiple Award Construction

Contract

(MACC)

Christine Basham & Derrick Thomas 14 June 2018

Introduction to Buying Team

Laura McRee, Procuring Contracting Officer

Christine Basham, Contract Specialist

Derrick Thomas, Contract Specialist

Details

Indefinite Delivery/Indefinite Quantity Contract at Sheppard AFB, TX, Lake Texoma Annex, TX, Altus AFB, OK, and Frederick Airfield, OK

5-year Ordering Period Anticipate awarding up to 6 contracts as a result of solicitation

FA3020-18-R-0008

Maximum aggregate value of all task orders shall not exceed

$150M NAICS Code: 238990, size standard $15M Awardees will be required to propose on all subsequent task orders

Eligibility

Limited to 8(a) firms within geographical area, serviced by SBA district offices of Texas and Oklahoma and other 8(a) construction firms with bona fide place of business within the geographical area and the assigned NAICS code

All other 8(a) participants are deemed ineligible to submit offers

Significant Dates

Site Visit: 14 June 2018 at 0900 CST Questions Due: 20 June 2018 at 1400 CST

Must be submitted in writing to Christine and Derrick No questions will be answered during the site visit

Proposals Due: 10 July 2018 at 1400 CST Original plus 2 paper copies and 1 CD

Please continue to check www.fbo.gov for amendments.

Sample/Seed Project

VNVP 141207

Repair Training Facility, B10187 PoP 120 Days; Magnitude $250,000 - $500,000 The work includes demolition of existing 30 ft x 15 ft stick-framed building down to the concrete slab. Existing building slab shall be salvaged and prepared for reuse in construction of a new building of the same size according to the plans and specifications.

Building has tested negative for asbestos materials. New building will be used as a one-room classroom with power, lighting, HVAC, as detailed in the plans and specifications. Underground conduit and communications equipment will be contractor-furnished and installed. Cleaning and removal of an empty fuel tank and concrete berm, with other miscellaneous site work is also required.

Please note the cost breakdown may be altered, lines may be added or deleted as necessary; but ensure adequate details are captured

Contact Information

Christine Basham Christine.basham.1@us.af.mil 940-676-5184

Derrick Thomas Derrick.Thomas.6@us.af.mil 940-676-6374

File details come from the government source that posted it.