This is a solicitation for non-personal base operations support services at Laughlin Air Force Base in Del Rio, Texas. The services include civil engineering, personnel, communications, logistics, security forces, contracting, and force support. The performance period is seven years. The requirement is set aside for competitive 8(a) small businesses. Offerors must register in the System for Award Management to participate. Questions regarding the solicitation should be directed to the identified contracting officer and contract specialist by April 19, 2022.
View the file
Other files for this federal contract opportunity
Show all 50
Laughlin Air Force Base (LAFB) - Base Operations Support (BOS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA300222R0002
22 Mar 2022
Q # PWS Paragraph Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
1 N/A Attachment 22, Section L, L.3.2.4 Based on a recent GAO decision ((Innovate Now, LLC, B-419546, April 26, 2021), in which the GAO sought SBA’s input to interpret the intent of its regulations, specifically regarding the application of 13 C.F.R. § 125.8(e) which states:
"A procuring activity may not require the protégé firm to individually meet the same evaluation or responsibility criteria as that required of other offerors generally. The partners to the joint venture in the aggregate must demonstrate the past performance, experience, business systems and certifications necessary to perform the contract."
In its opinion, GAO agreed with SBA that the CFR prohibits an agency from applying the same
See Amendment 0002 updated Attachments 22 and 23
2 Section I, Contract Clauses Solicitation Section I, Contract Clauses does not include SCA clause 52.222-41, but the SCA wage determination is included as Attachment 6. Will the Government please amend the solicitation to include appropriate SCA clauses?
Clause Added Amendment 0004
3 Section L.2.3.1 & L.2.5.1 The government is requesting a list of vehicles by quantity and type to be included in both Subfactor 1: Program Management Approach and Subfactor 3: Logistics Approach.
1) Due to page limits, will the government please remove the duplicate requirement and require only one vehicle list in Subfactor 1 or Subfactor 3?
The Government removed the duplicate requirement. See updated Attachment 22 para L.2.3.1(c)(3) and L.2.5.1(h); Attachment 23 para M.3.3.1.1(c)(3) and Attachment 24 Subfactor 1 (c)(3) and Subfactor 3(h)
4 Section L.2.3.1 & L.2.5.1 Due to page limits, will the government please exclude the list of vehicles and equipment from the page count?
The list of vehicles and equipment will not count toward the 120 page limit in Volume I - Technical Updated Attachment 22, para L.1.2.2
5 Section L.2.3.1, Attachment 18 Due to page llimits, will the government please exclude the Work Breakdown structure from the page count?
Completed Attachment 18 - Work Breakdown Structure will not be counted towards the 120 page count in Volume I - Technical. Updated Attachment 22, para L.1.2.2
6 Section L.2.3.1, Attachment 18 Should offerors submit the Work Breakdown Structure in Excel format as a separate file, or insert the Work Breakdown Structure in their response to Subfactor 1: Program Management Approach?
Completed Attachment 18 - Work Breakdown Structure shall be included in Volume I - Technical. Pricing column was removed from Attachment 18. Updated Attachment 22, para L.2.2 and L.2.3.1 .
7 Section L.2.2 & L.5.11.3 Section L.2.2 requires offerors to submit proposed teaming arrangments and/or letters of intent in Volume I. This requirement is repeated in L.5.11.3, which requires offerors to submit these documents in Volume IV. Does the government require this information in both volumes?
Updated Attachment 22, para L.2.2, requirement should be included only in Volume IV
8 Section L.2.2 & L.5.11.3 Will the government please provide a template for subcontractor letters of consent and client authorization letters?
Added Attachment 31- Subcontractor Consent Client Authorization Letter Sample 18 Feb 22 as an example
9 PWS 11.1.2.2.2 Requirements & Optimization (R&O)
PWS 11.1.2.2.2 refers to the AF approved Preventive Maintenance Task Lists (PMTLs) that should be used for preventive maintenance schedule development that are available here:
https://usaf.dps.mil/teams/10758/pmtl/module/pmtl%20home.aspx.
This website is inaccessible. Will the government please provide the referenced Preventive Maintenance Task Lists for offerors to review?
The three main types of PMTLs available for use in the PM program are the Air Force PMTL (AF-PMTLs), RSMeans® Procedure, and Base Specific or local supplement PMTL.
Each of the three have the same intent and purpose but are integrated to the PM program for different reasons. The AF-PMTLs website is:
https://usaf.dps.mil/teams/10758/pmtl/module/pmtl%20home.aspx. Once awarded, the SP will have access to the link via CAC.
SECTION J - ATTACH 27c Question and Comment Worksheet
Laughlin Base Operation Support
Q # PWS Paragraph Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
10 PWS 2.3.1.1, Government Furnished Property
PWS 2.3.1.1 states "The Government will furnish all property listed in all applicable PWS Appendix F of each functional area."
Will the government please provide Appendix F for each functional area or clarify if Appendix E for each functional area is the entire inventory of property (including equipment) the Government will provide?
Attachment 1 - Performance Work Statement Section 2, paragraph 2.3.1.1. was corrected to reflect Appendix E - Government Furnished Property (GFP), for applicable Sections of the Performance Work Statement ; Government Furnished Training (GFT) is listed in Appendix F of applicable Section of Performance Work Statement Sections.
11 PWS 2.1.2, Hours of Operation The PWS lists 10 x Federal Holidays to be observed under this contract. Independence Day (4 July) is not separately listed. Instead, there is a holiday listed as “Christmas Day Independence Day.” Will the Government clarify that Independence Day is an observed holiday, and that the total number of Federal Holiday days observed in the Calendar year is 11?
The Performance Work Statement Section 2, paragraph 2.1.2. has been updated to reflect Independence Day is observed as a Federal holiday; The Federal holidays listed in the Performance Work Statement were reformatted to reflect the eleven (11) holidays in sequential order.
12 PWS Section 2.1.9.6 RFP Att. 1 Historically, what is the incidence and amount of environmental fines and restoration costs? The Base has not been fined or paid restoration cost in the last ten years.
13 RFP Att. 14, Section H.1 Key Personnel requirement is that these positions be staffed from contract mobilization. These KPs include bus and truck drivers, vehicle mechanics, and other CBA workforce positions. If the requirement is to staff these positions from mobilization, then a non-incumbent offeror would not be able to hire the incumbent workforce for any key personnel. In addition, there would be no work for the "operators" to perform during mobilization. Would the government consider changing this requirement to read "day 1 of Operations"?
See updated Attachment 14 paragraph H.1
14 Solicitation, Section I, 52.245-2 The Government property provided under this clause is blank. Will the government please list which GFP this clause is applicable to?
Clause Updated Amendment 0004.
15 Solicitation, Section I, 252.208-7000 Will the resulting contract require the manufacture of items containing precious metals and, if so, does the Government intend to furnish such metals?
Clause Removed Amendment 0004.
16 Solicitation, Section I, 252.237-7024 IAW this clause, a Mission Essential Services Plan is required with submission of proposal, but there is no volume specified. Please confirm if this document should be part of proposal submission and if so, in which volume should it be included.
Updated Attachment 22 para L.2.3.1, Attachment 23 para M.3.3.1.1, and Attachment 24 Subfactor 1e.
17 RFP Att. 22, Section L.2.3.1.b Section L.2.3.1.b requires offerors to propose a work breakdown structure. Answering this comprehensively will require a significant amount of pages (as much as 50 pages). Would the government exempt the WBS response from the 120 page Volume I limit?
Completed Attachment 18 - Work Breakdown Structure will not be counted towards the 120 page count in Volume I - Technical. Updated Attachment 22, para L.1.2.2
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
18 RFP Att. 22, Section L.3.2.4 We are requesting the Government update Section L.3.2.4 to clarify affiliate past performance as follows:
For background, the procurement rules endorse and encourage the Government crediting a Prime Offeror with past performance of its affiliates where the offeror’s proposal demonstrates that the resources of the affiliate (e.g., workforce, management, facilities, or other resources) will be “meaningfully contributed” to contract performance. That “contribution” could very well include the affiliate giving tools, resources, or even personnel to the Prime for use by the Prime in performance, and with affiliate personnel becoming employees of the Prime offeror. In such case, the affiliate’s past performance is attributed to the Prime Contractor as the Prime Contractor’s past performance.
Section L.3.2.4 states that three contract citations “must be prime contractor contracts, which allows a maximum of three (3) contracts specific to joint ventures, partners, affiliates, subcontractors, etc.
performing meaningful work to achieve successful performance.” As described above, because an affiliate may not be itself “performing” on the contract, but instead contributing its resources to the Prime Offeror, we request that the Government to confirm that it will permit the Prime Contractor to submit affiliate past performance citations for the three Prime Contractor contracts (described in L.3.2.4) as long as the Prime Contractor demonstrates how the affiliate’s resources will be meaningfully contributed to contract performance. This approach will still allow the remaining three
(3) contracts described in L.3.2.4 to be submitted by a joint venture, partner, affiliate, subcontractor, etc. who will be performing workshare as part of the contract. The approach will further benefit the Government through increased and improved competition, giving the Government access to, and not unduly disadvantaging, contractors that happen to go to market through more than one operating company. This also gives the Government access to the full range of services and experience those contractors can offer. Moreover, the Government can continue to permit the three additional citations.
See Amendment 0002 & 0003, and updated Attachment 22 and Attachment 23.
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
19 Att. 22 Section L.1.2.1 Table L.1, Section L.3.2.1, and Section L.3.2.4.
And Att. 23 Section M.3.4.3.
Table L.1 states that the total page count for the Past Performance Volume is “40 pages” and L.3.2.1 state that “The Past Performance Volume shall be organized according to the following outline: a) Table of Contents; b) Summary Page; c) Past Performance Information Worksheet; d) Specific Content;
e) Subcontractor Letters of Consent/Client Authorization Letters; f) Organizational Structure Change History; and, g) Glossary.” Section L.3.2.4 states that “the PPI worksheets do not count against the page limitation (40 pages) for Volume II - Past Performance.” In addition, Section M.3.4.3 states, “Relevant performance measures the extent of similarity in scope, magnitude, and complexity of the Offeror’s past performance and the solicitation requirements. For each Past Performance effort, relevancy will be determined by the similarity to the scope, magnitude of effort and complexity of the Offerors’ performance. Magnitude similarity will be calculated as an estimated annual value (EAV) as part of the relevancy determination.”
Question (a) Please confirm that the PPI worksheets are included in the Past Performance Volume, but do not count against the page limitation (40 pages).
Question (b) The PPI Worksheets follow the Summary Page (limited to one page), but the PPI Worksheets are excluded from the Past Performance Volume page limit. Because L.1.2.3 states, “the Pages shall be numbered sequentially by volume” should the PPI Worksheets be provided at the end of the volume, so it is easier to assess that the volume is within page count?
Question (c) Because the order of the organization of the Past Performance Volume per L.3.2.1 does not appear to allow further information that addresses relevancy to the PWS, what else is the Government expecting in the Past Performance Volume that will take 40 pages to cover?
Question (d) Because the Past Performance Volume is being evaluated on the similarity of scope, magnitude, and complexity, can the Offeror use the page count in the Past Performance Volume to address relevancy to the PWS (scope, magnitude, complexity) and meaningful involvement/contribution of an affiliate contract citation?
Updated Attachment 22 paragraph L.3.2.1
a) Yes, PPI can be included in Volume II.
b) See paragraph L.3.2.1
c) See Attachment 22 paragraph L.3 and subparagraphs, Offeror can provide information within the Specific Content and is not required to use all 40 pages.
d) See Attachment 22 paragraph L.3 and subparagraph. Yes the Offeror can use the Past Performance Volume to address similarity of scope, magnitude and complexity.
20 Att. 23, Section L.3.2.5 and Att. 26 Section L.3.2.5 states that “The Offeror shall exert its best effort to ensure that a current POC, per relevant contract, submits a completed PPQ directly to the Government not later than the required due date. The due date is NLT 3:00 PM (Central Time, San Antonio, TX) on April 11, 2022. However, the Past Performance Questionnaire (Attachment 26) states that “In order to meet the acquisition milestones, we request your written response No Later than 3:00 PM (Central Time, San Antonio, TX) on April 06, 2022.” Please confirm that the Past Performance Questionniare is due no late than the proposal due date - NLT 3:00 PM (Central Time, San Antonio, TX) on April 11, 2022.
Updated Attachment 26, para 2
Please note that the proposal due date has changed to 19 April 2022.
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
21 Att. 22, Section L.3.3.1 and Att. 25 Att. 25 Section F states that “If applicable, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods etc.” Att. 22 Section L.3.3.1 states that "If problems were encountered during the performance of the identified contracts, provide evidence of the ability to isolate the root causes of problems and include in the Past Performance volume a description of programs or actions taken to resolve those causes. Problems not addressed but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/circumstances have not changed, DO NOT repeat them here.
Question: Both these sections are asking for the same information. Will the Government amend the PPI Worksheet to exclude F so the information is only included in Specific Content? That will allow an Offeror to submit more information on scope, magnitude, and complexity in the PPI Worksheet.
See updated Attachment 25 is an optional form and will be left as is to provide any rationale behind any substandard performance.
22 Att. 22 Section L.2.3.1.d Att. 22 Section L.2.3.1.d states that the offeror: “Provides a comprehensive process to manage, update, configure government designated legacy systems and replacement systems, in support of all PWS Sections.” There is no mention of specific requirements to manage, update, or configure government information systems except in PWS Section 11 (Operations and Maintenance).
Question (a) Outside of CE O&M, are there any other Government information systems which the contractor will have to manage, update, configure the existing legacy system and any designated replacement system?
Question (b) Can the Government provide a list of the legacy information systems and their designated replacements?
Yes, the SP will provide designated functional system administration support for all Legacy systems and their designated replacements. Legacy systems are listed in Attachment 1, Performance Work Statement Section 11. The Legacy systems are but not limited to: (1) ACES (will be replaced by NEXGEN), (2) GIS (Geospatial Information System), (3) Computer Aided Design and Drafting (CADD), (4) Sustainment Management System (SMS), (5) EMCS (Energy Monitoring and Control System), (6) EESOMIS (Generator/Refrigerants). Legacy systems required reports/Contract Requirement Data List include but not limited to backflow testing, corrosion control, cathodic protection,and cross connection control.
There are no legacy systems for Performance Work Statement Sections 23 and 25.
23 11.1.2.8.2 Att. 1, Section 11.1.2.8.2 Section 11.1.2.8.2 states "Provide designated functional system administration support for CE AIS systems, and other Government mandated/designated systems." For which specific CE Automated Information Systems will the contractor be required to provide Functional System Administration Support? If known, please list the designated replacement system for each CE AIS the contractor will be responsible for. For example:
- Do the BUILDER, PAVER, ROOFER, UTILITIES, GIS systems require FSA Support?
- Does ACES require FSA Support?
- Do IGIS/NexGen IT require FSA Support?
The SP's FSA will only work on SP's government furnished computer equipment for the following: Request and maintain user accounts, set up and maintain user permissions, install software on client desktop computers, troubleshoot user problems, and open trouble calls to respective help desks and track the calls through resolution. Create, maintain, and assist users with development of required reports and queries, and perform required system administrator functions to include to include, but not limited to processing end of session and interface programs/procedures.
24 Att. 18 and Att. 22, Sections L.2.3.1.b and L.4.3.2
The offeror understands the utility of including Column J (Per Hour Labor Cost) within Attachment 18, cost/price information as an evaluation tool. However, it does not appear suitable to include this cost/price information within Volume I, Technical as required per Att. 22 Section L.2.3.1.b. Would the Government consider:
1) For the submission of the WBS in Volume I, per Att. 22 Section L.2.3.1.b, allowing offerors to redact the cost/price information from Attachment 18?
2) Require that Attachment 18, inclusive of Column J, be submitted as part of Volume III, Price.
1. See Updated Attachment 18 - removed Per Hour Labor Cost and Total.
2. No longer applicable.
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
25 Att. 18 and Att. 22, Sections L.2.3.1.b
Is it the government's intent that we include cost information as part of the WBS in the Technical volume?
See Updated Attachment 18 - removed Per Hour Labor Cost and Total.
26 Att. 4, Section 12.2 and Att. 17 The Annual Accrual hours per Years of Service in Att. 17 do not match the accrued hours in section
12.2 of the USW CBA contract (Att. 4). For example: 0-5 hours shows 120 hours accrued in Attachment 17 but shows 136 in section 12.2 of the CBA. Can the government please clarify?
See updated Attachment 17.
27 Solicitation, page 40 - CLIN 0029 The period of performance for CLIN 0029 - Mobilization shows 01 Oct 2023 to 30 Nov 2023. Should the date be corrected to 2022?
Corrected Amendment 0004
28 25.1.2.1.3 Att. 1, Section 25.1.2.1.3 Section 25.1.2.1.3 of the PWS states that the Service Provider shall “assume sole responsibility for all associated utilization costs of Government Furnished Equipment Vehicles (GFE-V), including operation, maintenance, repair, licensing/registration, and replacement of ASC 051 GFE-Vs.”
Transportation Services including the maintenance and replacement requirements in Attachment-1 are an essential component of the Ft. Laughlin performance work statement. However, unlike other sections of the Solicitation (e.g., Government Furnished Equipment), the Government does not provide any details regarding the condition of the GFE-Vs, including the GFE-Vs that the Service Provider will be required to replace. Providing such condition information would level the playing field to the maximum extent practicable pursuant to FAR 45.103(a)(2) and FAR 45.202, and would enable non-incumbent offerors to estimate maintenance and replacement costs for Government Furnished Vehicles. Question: Will the Government provide the condition and replacement cost of Government Furnished Vehicles?
Assets listed in the Performance Work Statement Section 25, paragraph 25.1.2.1.3 are in serviceable condition. Replacement costs cannot be estimated due to current vehicle market conditions which are fluid. Assets were available for review at the site visit.
29 23E.1.2.2 Att. 1, Section 23E.1.2.2 Section 23E.1.2.2 is identified as Government Furnished/Contractor Replaced and includes a list of property, including two “Bendi Forklifts.” The Government does not provide any information relating to the condition of the property, but most importantly the two Bendi Forklifts. Providing such condition information would level the playing field to the maximum extent practicable pursuant to FAR 45.103(a)(2) and FAR 45.202 would allow non-incumbents to properly account for potential replacement costs. Question: Will the Government provide the condition of the two Bendi Forklifts in
PWS 23E.1.2.2?
Both forklifts are 2 years old and 100% serviceable with very low hours of use. The forklifts are NOT classified as GF Vehicles but classified as GF Equipment. Assets were available for review at the site visit.
30 Att. 22, Section L.4.3.1 It is understood that the offeror should not price the cost reimburseable CLINs. Please confirm that during the execution of the contract, that the contractor will be allowed to apply indirect cost (no Fee) to actual costs incurred for the Cost Reimburseable CLINs.
Updated Attachment 22 para L.4.8 Offerors will not be allowed to apply indirect cost to the Cost Reimbursable CLINS after award. Therefore, Offerors should propose their indirect rates accordingly.
31 Att. 3, Article 14 In the IAM CBA, the direct labor rate table show rates through 2023. However, in the Benefits section of the CBA, the H&W and Pension show rates only through 2020. Was there an addendum to the CBA that was not included with the RFP release or should the offeror price the H&W and Pension according to the rates for 2020?
See updated Attachment 3 - CDS IAM Laughlin 30 Jun 2021
32 11.1.2.2.2.1.5. Optimize CE Operation Databases.
Attachment 1 Performance Work Sta Is the current Service Provider (SP) using NexGen IT? The current contractor will start using NexGen in April 2022.
33 11.1.2.2.2.1.5. Optimize CE Operation Databases.
Attachment 1 Performance Work Sta Will the SP use NexGen IT from day one of the contract? Yes, the SP shall utilize NexGen on the first day of contract start.
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
34 11.1.2.2.2.1.9.1.1.3. Facility Condition Assessment
Attachment 1 Performance Work Sta What is the status of the builder data currently in BUILDER SMS, PAVER, UTILITIES, Geospatial Information System (GIS) on the current contract?
BUILDER SMS is constantly updated; PAVER is up to date; UTILITES has not been released by manufacturer yet; GIS for utility lines; GIS is constantly updated jointly by the Government and the SP - the Government maintains the Common Installation Picture and SP updates utility lines when adding new lines or errors are discovered when unearthed.
35 11.1.2.2.2.1.5. Optimize CE Operation Databases.
Attachment 1 Performance Work Sta Is the the data in BUILDER SMS, PAVER, UTILITIES, Geospatial Information System (GIS) on the current contract up to date?
BUILDER SMS is constantly updated; PAVER is up to date; UTILITES has not been released by manufacturer yet; GIS for utility lines; GIS is constantly updated jointly by the Government and the SP - the Government maintains the Common Installation Picture and SP updates utility lines when adding new lines or errors are discovered when unearthed.
36 RFP Att. 14, Section H.1 Are key personnel required on day one of the mobilization? See updated Attachment 14 paragraph H.1 37 RFP Att. 14, Section H.1 Are all key personnel required to be a part of the mobilization, including those covered by the CBAs? See updated Attachment 14 paragraph H.1
38 RFP Att. 14, Section H.1 Are key personnel incumbent hires needed to be a part of the mobilization? See updated Attachment 14 paragraph H.1 39 RFP Att. 14, Section H.1 Since the RFP requires all Key Personnel to be a part of mobilization, is it the government's intent that incumbent employees not be hired by a new Service Provider (SP) for Key Personnel positions?
Updated Attachment 14 paragraph H.1
40 Please confirm the NAICS code is 561210. NAICS Code is 561210 41 Att. 14, Section H.1.2 What are the qualification / certification requirements for the Project Manager? See updated Attachment 1, PWS Section 2, paragraph 2.1.3.3 to reflect the qualifications for the Program Manager. And added subparagraph 2.1.3.3.1. to outline requirements for the Contract Manager.
42 L.3.2.4 Attach 22-Section L Instructions Conditions and Notices to Offerors 12 Jan 2022
The PPI worksheets should be submitted within 30 days after solicitation and emailed to the Contracting Officer and Contracting Specialist listed in Table L.2 only. T Performance.
However, the instructions do not state calendar days or business days. Can the government please provide clarity with a specific due date and time?
See updated Attachment 22 paragraph L.1.4.2
43 L.3.2.5 Attach 22-Section L Instructions Conditions and Notices to Offerors 12 Jan 2022
Would the Government consider permitting respondents to submit CPARs or previously completed PPQs completed within the past year in lieu of new PPQs?
Government requires Attachment 26 - Past Performance Questionnaire (PPQ) IAW Attachment paragraphs L.3.2.5 and L.3.2.5.1
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
44 Attach 22 - Section L - Instructions Conditions and Notices to Offerors 12 Jan 2022, Section L.3.4 Early Proposal Information
Question: If offerors submit early proposal information by 12 February 2022, will offerors be able to submit a revised Volume II Past Performance submission by the proposal due date of 11 April 2022?
Yes, Offerors will be able to submit revised Volume II Past Performance with the submission of the proposal. Please note that the proposal due date has changed to 19 April 2022.
Attachment 25 – Past Performance Information Worksheet is optional, and it meant to facilitate a timelier past performance evaluation. The Government will evaluate what is submitted in Volume II with the final proposal.
Attachment 22 para - L.3.4.1 The Government request that early proposal information associated with Volume II Past Performance (i.e. PPI Worksheets) be provided within 30 business days after the solicitation is posted and shall be submitted thru email to the Contracting Officer and Contract Specialist listed in Table L.2 only. This will facilitate a timelier past performance evaluation. Failure to submit Volume II by the earlier date will not result in Offeror disqualification.
45 L.3.2.4 Attach 22-Section L Instructions Conditions and Notices to Offerors 12 Jan 2022
The PPI worksheets should be submitted within 30 days after solicitation and emailed to the Contracting Officer and Contracting Specialist listed in Table L.2 only. T Performance.
However, the instructions do not state calendar days or business days. Can the government please provide clarity with a specific due date and time?
See updated Attachment 22 paragraph L.1.4.2
46 L.3.2.5 Attach 22-Section L Instructions Conditions and Notices to Offerors 12 Jan 2022
Would the Government consider permitting respondents to submit CPARs or previously completed PPQs completed within the past year in lieu of new PPQs?
Government requires Attachment 26 - Past Performance Questionnaire (PPQ) IAW Attachment paragraphs L.3.2.5 and L.3.2.5.1
47 Solicitation, Section I, Contract Clauses
FAR 52.222-62, Paid Sick Leave Under EO 13706, is not listed under Contract Clauses. Since the Executive Order is mandatory for all solicitations issued after 1/1/2017, please confirm this clause is applicable.
Clause Added Amendment 0004
48 23E.1.1 RFP Att. 1 In the Main Admin (Building 77) table row, what does the 'P' in P65,546 SQ FT mean? The "P "is a typo and the Performance Work Statement was updated to reflect the correction.
49 25E.1.2.1 RFP Att. 1 In the Cyclone 3000 Port A Cool table row, the Item Cost is listed as 25.00, the QTY On Hand as 2, and the Total Cost as 75.00. This math is not correct. Can the government please clarify?
There are (3) Cyclone 3000 Port A Cool at a Item Cost of:$25.00 each. The total cost is:
$75.00. The PWS was corrected to change quantity on ha hand from 2 to 3
50 25E.1.2.1 RFP Att. 1 In the 7 Step Grip Step Ladder table row, the Item Cost is listed as 544.00, the QTY On Hand as 1, and the Total Cost as 709.63. This math is not correct. Can the government please clarify?
The actual cost of the 7 Step Grip Step Ladder Item Cost is: $544.00, when including the Shipping/Handling cost of $165.63 the full cost to the government is: $709.63.
51 25E.1.2.1 RFP Att. 1 In the Port A Cool Evaporative Cooler table row, the Item Cost is listed as 825.00, the QTY On Hand as 1, and the Total Cost as 909.88. This math is not correct. Can the government please clarify?
The actual cost of the Port A Cool Compact Evaporative Cooler Item Cost is: $825.00, when including the Shipping/Handling cost of $84.88 the full cost to the government is:
$909.88.
52 25E.1.2.1 RFP Att. 1 On pages 512-514, there are two sections numbered 25E.1.2.1 - Government Furnished/Contractor Replaced and Government Furnished/Government Replaced. Can the government please clarify whether there section numbering is incorrect, or if something else in the PWS should be updated?
Performance Work Statement Section 25E.1.2.1 This numbering section is correct. There are two separate titles. Government Furnished/Contractor Replaced (first portion) and Government Furnished/Government Replaced (second portion). Each section specifies the items and responsibilities for replacement.
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
53 25E.1.2.1 RFP Att. 1 The data inside the Zebra GK420T Label Printers table row is not readable. Can the government please provide a legible copy of this information?
The PWS has been formatted to make table readable. Here is the information stated:
ZEBRA GK420T LABEL PRINTERS, Item Cost: $300.00, Quantity on hand: 4, Location:
Bldg. 77, Total Cost: $1200.00, Room Location: 156.
54 Solicitation, Section I, Contract Clauses
52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026, is not an applicable clause in Section I. This clause would have pricing impact since the Executive Order raises minimum wages to $15/hr. In some cases, this is higher than the CBA Labor Cat Wage. Will the Government add this clause to Section I and should the Offerors price accordingly?
Clause Added Amendment 0004
55 25.1.2.1.3 RFP Att. 1 Can the government confirm that no 051E, GSA, or Contractor owned vehicles will be worked on within the maintenance facilty or on base.
Confirmed and correct. No 051, GSA or contractor owned vehicles may be maintained on base
56 25E.3.6.1 RFP Att. 1 Can the government provide the facility that will house the Ground Transportation team and their vehicles.
Bldg. 131 (Vehicle Maintenance and Ground Transportation) will house the Ground Transportation team and their vehicles.
57 25E.3.6.1 RFP Att. 1 Can the government confirm that both fire truck and refuel truck maintenance will be accomplished in the same facility, Bldg 1250.
No, Updated Attachment 1, Performance Work Statement Section 25, Section 25E.3.6.1.
Refuel trucks are maintained in building 9. Fire trucks and all other authorized government vehicles are maintained in building 131.
58 25.1.2.4.7 RFP Att. 1 Is it the government's intent here to set-up a Trainers for Vehicle Operators (TVO) section for training and certifying IAW AFI 24-301?
Yes, the Government's intend is to set-up TVO for training and certifying IAW AFI 24-301 para 1.12 and DODM 4500.36 Ch.3; a minimum of 2 TVO's will be appointed by the SP and endorsed by the Government.
59 25.1.3.3.1 RFP Att. 1 Is there a paint booth/body shop area located in the maintenance facilities? Yes, the paint booth is located in bldg. 131.
60 25.1.2.8.2 RFP Att. 1 Can the government please name all the airports the SP be required to service for passenger pick-up/drop-off?
See updated Attachment 1, PWS, Section 25, paragraph 25.1.2.8.2. for airport information.
61 25.1.1 RFP Att. 1 Will the SP be required to provide day to day Personal Property and Passenger Travel Office Services? Yes. SP will be required to provide all services IAW Attachment 1 - Performance Work Statement Section 25 paragraph 25.1 and all sub-paragraphs.
62 11.1.2.1.1 RFP Att. 1 Is the BUILDER data 100% complete and 100% accurate? The initial BIULDER data was provided by a separate contractor prior to award the current contract. Once the R&O modification was awarded in August 2020, the current SP was required to review and update at least 20%, of total square footage in BUILDER/year.
Since the modification award, the SP has approximately 37% of Builder assessed/reviewed and is considered accurate. However, BUILDER is a living document and shall be updated daily by the SP.
63 11.1.2.1.1 RFP Att. 1 Can the government provide a copy of the most current Final 09 Building System Quick View Report? Added Attachment 33 - AF Final 09 Building System Quick View 22 Feb 2022, document is only current as of 22 Feb 2022 and is regularly updated.
64 11.1.2.2 RFP Att. 1 Is the R&O section completely established? R&O section is established.
65 11.1.2.2 RFP Att. 1 Can the government provide historical work load date by skill set required to complete the R&O task? See appendix Performance Work Statement 11-B; 11B.1. Workload Data; Table:
Requirement & Optimization (R&O) Estimated Time Accounting (ETA) Personnel
66 11.1.2.2.2 RFP Att. 1 Is it the government's intent for the SP to provide 3 fulltime engineers to support the 3 AMPs and 9 fulltime engineers to support the Sub-AMP activities?
The Government's expectation is for the SP to provide adequate staffing in support of the requirements IAW Attachment 1 - Performance Work Statement.
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
67 11.1.2.2.2.1.7 RFP Att. 1 Can the government provide a copy of the current PM1 Report? Added Attachment 34 - AAF PM 01 PMOSS Report 22 Feb 2022, document is only current as of 22 Feb 2022 and is regularly updated.
68 11.1.2.2.2.1.7 RFP Att. 1 Can the government provide a copy of the current PMTLs? Added Attachment 30 - PMTL D3035160195001 Details, document is only current as of 22 Feb 2022 and is regularly updated.
69 11.1.2.2.2.1.7 RFP Att. 1 Can the government provide copies of the current PM job plans? No, the current PM job plan belongs to the current SP.
70 11.1.2.2.2.1.8 RFP Att. 1 Is the U-Fix-it program currently operational? There is currently no U-Fix-it Store in place, the contractor awarded the contract will be responsible to establish the U-Fix-It Store.
71 11.1.2.2.2.1.8 RFP Att. 1 Can the government provide historical work load data for the U-Fix-It Store? There is no historical data. U-Fix-It program has never existed; Establishment of the program is based on AFI 32-1001 and CE Material Control Playbooks.
72 11.1.2.2.2.1.9.1.1.4.2 RFP Att. 1 Can the government provide the most current pavement condition index and/or PCI report? The Pavement Condition Index is CUI and will be provided at the time of contract award.
73 11.1.2.2.2.1.9.1.1.4.3 RFP Att. 1 Can the government provide the most current electrical distribution study? The most current study was accomplished in 2008 by the current primary electrical power contractor. This document is CUI and once the contract is awarded the SP will be able to review it.
74 11.1.2.2.2.1.9.1.1.4.7 RFP Att. 1 Can the government provide the work load data required to support the Facilities AMP Manager? See Attachment 1 - Performance Work Statement appendix 11-B; 11B.1. Workload Data;
Table 11: Requirement & Optimization (R&O) Estimated Time Accounting (ETA) Personnel
75 11.1.2.2.3.1 RFP Att. 1 Can the government provide the work load data required to support the Facilities AMP Manager? See Attachment 1 - Performance Work Statement appendix 11-B; 11B.1. Workload Data;
Table 11: Requirement & Optimization (R&O) Estimated Time Accounting (ETA) Personnel
76 11.1.2.2.3.4 RFP Att. 1 Is NextGen-IT or TRIRIGA being utilized at Laughlin AFB? NexGen will be implemented in April 2022.
77 11.1.2.2.9 RFP Att. 1 Can the government provide historical work load data required to support the WRRB meeting? No, the Work Request Review Board (WRRB) Meetings is a meeting where approval and execution decisions are made based on inputs from the WRWG. Not all requirements reviewed by the WRWG will be reviewed by the WRRB but all WRRB decisions require WRWG input. The WRRB typically meets weekly and typically covers the following: (1) CEO chairs (Government Employee); (2) Determines if resources available to authorize requirement and manages requirement until such time resources (funding) can be applied; (3) Establishes schedule; (4) Approves/Disapproves/Alternative Execution Method; and (5) Sends FP to CEN if work is out-of-scope for Operations
78 2.1.4.1 RFP Att. 1 This PWS element states that "Any hazards for which a work around has been established are located in Technical Library. The Government will correct these hazards IAW base-wide Government-developed plans of abatement taking into account safety and health priorities." Will the Government provide the status of the remediation of each of these known hazards?
The Asbestos Management and Operation Plan for hazardous material is located in the Technical Library, Operation Plan (OPLAN).
79 2.1.12 RFP Att. 1 This PWS element states "Comply with wing/base/installation Fire Regulations." Would the Government provide them?
Added Attachment 37 – Fire Emergency Services LAFB AFI32-2001 05 Dec 2019
80 2.1.10.4 RFP Att. 1 PWS 2.1.10.4 cites the "LAFB Comprehensive Emergency Management Plan (CEMP) 10-2" in reference to LAFB Base Shelters. Would the Government provide this document?
This document is Controlled Unclassified Information (CUI) and will be available to the SP awarded the contract.
81 RFP Att. 22 Section L goes from Section L.5.4.1 at the bottom of page 16 to Section L.5.6 at the top of page 17. Can the government please clarify whether there is a section L.5.5 missing, or if the section numbering should be corrected?
Updated, Attachment 22 para L.5.5
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
82 N/A Attachment 25, Past Performance Information Worksheet (page 2 of 3)
Would the Government please clarify what is meant by "development and/or production, or other acquisition phase"?
Updated Attachment 25 para B.
83 N/A Attachment 25, Past Performance Information Worksheet (page 2 of 3)
Would the Government please clarify #4 Estimate at Completion?
Is this referring to the estimated value of the contract at completion of the period of performance?
Updated Attachment 25 - para C, removed #4,5 and 6
84 N/A Attachment 25, Past Performance Information Worksheet (page 2 of 3)
Under D Primary Customer Points of Contact, would the Government please confirm the Program Manager is also known as the Contracting Officer Representative (COR)?
Updated Attachment 25 - D
85 N/A Attachment 22, Section L, L.1.4.3 (page 7 of 18)
Would the Government please clarify whether the cover letter should be submitted as a stand alone document/file or included in a volume?
If it should be included in one of the volumes, which one?
Updated Attachment 22 para L.1.4.2, L.1.4.3 and L.5.5 and subparagraph.
86 Section L.5.2.1, Contractor Responsibility
Section L.5.2.1 states, "If the Offeror is a combination of firms (including joint venture partners, individual companies which comprise the proposed organization, and/or major and key subcontractors), discuss the financial responsibilities among the companies."
Will the Government please define the terms "major subcontractor" and "key subcontractor"? Is there a dollar value that qualifies a subcontractor as a major or key subcontractor, or is it up to offerors to define subcontractors as major or key subcontractors?
Updated Attachment 22 paragraph L.5.2.1. IAW DFAR 252.209-7009 "Major Subcontractor" means a subcontractor that is awarded a subcontract that equals or exceeds—
(1) Both the certified cost or pricing data threshold and 10 percent of the value of the contract under which the subcontracts is awarded; or
(2) The threshold specified in the definition of “major subcontractor” at Defense Federal Acquisition Regulation Supplement 209.571-1 on the date of subcontract award.
87 PWS 25.1, Transportation & PWS
25.1.3 Vehicle Maintenance
PWS 25.1, Transportation and its subparagraphs require offerors to perform Transportation services, including Vehicle Maintenance (PWS 25.1.3), in accordance with AFI 24-302, Vehicle Management. AFI 24-302 includes references to a "VM Guidebook" but offerors cannot access the document via the link in the document.
Will the Government please provide a copy of the VM Guidebook referenced in AFI 24-302?
Added Attachment 35 – Vehicle Management Guidebook 27 Sep 2021
88 PWS 2.1.3.5 PWS 2.1.3.5 states "Current listing of employees. Submit to the ACO within (15) business days after contract start, a list of all employees by names, addresses, social security numbers, and level of security Ensure Privacy Act information is properly marked and protected from unauthorized access, disclosure, or manipulation. (CDRL 0201)."
Some of this information in PII. How will this information be protected once submitted to the Government?
Revised Performance Work Statement paragraph 2.1.3.5 to remove Privacy Act Information and some documentation requirements. Revised paragraph: "Current listing of employees. Submit to the ACO within (15) business days after contract start, a list of all employees by names, employee's job classification, and level of security Ensure Privacy Act information is properly marked and protected from unauthorized access, disclosure, or manipulation. (CDRL 0201)."
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
89 Section I - Contract Clauses 252.237-7024 Notice of Continuation of Essential Contractor Services. Oct 2010 (b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in attachment 1 - Performance Work Statement (PWS).
Will the Government please clarify where offerors should include the essential contractor services plan in their proposal?
Updated Attachment 22 para L.2.3.1, Attachment 23 para M.3.3.1.1, and Attachment 24 Subfactor 1e.
90 Section I - Contract Clauses 252.237-7024 Notice of Continuation of Essential Contractor Services. Oct 2010 (b) The offeror shall provide with its offer a written plan describing how it will continue to perform the essential contractor services listed in attachment 1 - Performance Work Statement (PWS).
Will the Government please clarify where offerors should include the essential contractor services plan in their proposal?
Updated Attachment 22 para L.2.3.1, Attachment 23 para M.3.3.1.1, and Attachment 24 Subfactor 1e.
91 PWS 2.1.3.14 CDRL 0203 Will the Government please provide an estimated date for the Pre-performance Conference? Government cannot provide dates at this time, Pre-performance Conference will occur during the mobilization period.
92 PWS 2.1.3.3 Attachment 1 - PWS The PWS requires the contractor to provide a "Contract Manager", who will be "responsible for the overall management and coordination of this contract and shall act as the central POC with the Government." This sounds like the traditional role of a Project Manager. In PWS 2.1.3.4.1, the Government lists a Project Manager and Contract Manager as key personnel. Will the Government clarify: What is the difference between the Project Manager and the Contract Manager?
See updated Attachment 1, PWS Section 2, paragraph 2.1.3.3. and added paragraph 2.1.3.3.1.
93 PWS, Appendix 11B, p 226 Table 9, LUC Operations Hours Will the Government further define what types of work orders are combined to equate to "Operations Hours?"
Collection Work Orders/Daily Ops Work Orders. See Performance Work Statement Appendix 11-B; 11B.1. Workload Data; Table 15: FY FOFP Services Performed By ATA Personnel (Specific Work Tasks) *Workload Effort/Tasks Already Captured on Tables
94 PWS, Appendix 11B, p 226 Table 9, LUC Operations Hours Will the Government explain the significant (~24k to ~61k Hours) between FY18 to FY20? The publicly available information on expenditures at Laughlin don't appear to support a 3 fold increase in Operations Hours, Increase hours due to but not limited to aircraft mishaps, natural disasters recovery efforts and aging infrastructure that occurred between FY18 and FY20. SP reasonability shall be to track workload properly.
95 PWS, Appendix 11B, p 226 Table 9, LUC Operations Hours Will the Government provide additional workload or clarifying narrative information to explain the difference in Operations Hours for Entomology between FY18 (10,295hrs) and FY20 (32,792hrs)? This variance leads to vastly different assessments in any standard estimating system, and we don't believe the basis for an estimate (3 x multiple over 3 years) likely supportable.
Weed control for the Xeroscape (27 Acres)
96 PWS, Appendix 11B Workload Hours Will the Governent confirm that subcontractor and vendor costs are included within the lump sum workload hours in the 11B.1 Workload Data?
Workload data for 11B.1 has been provided. Government does not control vendor or subcontractor costs
97 PWS, Appendix 11B Workload Hours Can the Government confirm whether requirements and optimization hours are included in the 11B.1 workload hours?
Yes, see Attachment 1 - Performance Work Statement Appendix 11-B; 11B.1. Workload Data; Table 11: Requirement & Optimization (R&O) Estimated Time Accounting (ETA) Personnel
98 PWS, Appendix 11B Workload Hours Can the Government confirm that all of the 24/7 EMCS hours are included within the 11B.1 workload hours?
Yes, see Attachment 1 - Performance Work Statement Appendix 11-B; 11B.1. Workload Data; Table 13: Other ETA Personnel (FY-Annual Work Effort/Tasks)
Reference (If Applicable)
Reference Document (If Applicable) QUESTION RESPONSE (RESERVED FOR GOVERNMENT)
99 PWS, Appendix 11B and Appendix 13B.1
Entomology Workload Can the Government clarify that whether any entomology workload (i.e. xeriscape related) are included in the grounds maintenance workload in section 13B.1?
Yes, there is entomology workload for weed control. Attachment 1, Performance Work Statement Section 13B which has been updated. SP is required to meet the workload requirement. Offerors shall propose accordingly.
100 General Solicitation Question Vendors Can the Government provide a list of the current second tier & third tier subcontractors/vendors supporting the installation (i.e. water treatment, vertical transportation, grounds, proprietary technology vendors, specialty certification & testing vendors, etc).
Government does not have this information.
101 2.1.24.1 RFP Att. 1 The PWS states that "Property Inventory and Accountability. Make property custodians and their alternates available no later than five (5) business days prior to start of the basic contract period for government provided initial custodial training." Can the Government confirm that the cost of this activity, prior to contract start, is to be at Offeror expense?
See updated Attachment 1 - Performance Work Statement Section 2, paragraph 2.1.24.1.
Offeror should propose accordingly.
102 2.1.24.1 RFP Att. 1 The PWS states "Property Inventory and Accountability. Conduct a pre-inventory and identify missing items and items in need of repair to the Government thirty (30) calendar days prior to follow-on contract start date." Can the Government confirm that the cost of this activity, prior to contract start, is to be at Offeror expense?
See updated Attachment 1 - Performance Work Statement Section 2, paragraph 2.1.24.1.
This will be required 30 days after contract award. (OFFER SHOULD PROPOSE
ACCORDINGLY #101)
103 2.1.24.1.2 RFP Att. 1 The PWS states "Conduct and provide annual equipment inventory, equipment test, inspection records, and ItPoP inventory ten (10) business days after start of contract and annually at start of FY to ACO and CORs." Can the Government confirm the requirement of this inventory, equipment test, inspection records, and ItPoP inventory 10 days after contract start?
The SP is required to complete within 10 business days after start of full performance of contract.
104 RFP Section I Contract Clauses The referenced contract clauses don't include clauses pertaining to the Service Contract Labor Standards. Attachments 3 through 13 are applicable CBAs, WDs, and Davis Bacon wages. Will the Government be adding clauses, e.g., 52.222-41 (Service Contract Labor Standards), 52.222-43 (SCA Price Adjustment), 52.222-26 (Equal Opportunity), etc. into the solicitation?
Clauses Added Amendment 0004
105 25.1.2.1.5 RFP Att. 1 Can the government clarify this PWS section, as it reads as the SP is responsible for procuring rental vehicles when they do not have vehicles available within the UDI fleet upon…