Attach 18 Work Breakdown Structure WBS Template 09 Mar 2022.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- FA300222R0002
About this file
This solicitation is for non-personal base operations support services at Laughlin Air Force Base in Del Rio, Texas. The Department of the Air Force Air Education and Training Command is seeking these services through solicitation FA300222R0002, a competitive 8(a) small business set-aside. The incumbent contractor will provide services including civil engineering, personnel, communications, services, and law enforcement to support over 4,000 people and 1,200 students annually for the 47th Mission Support Group at Laughlin Air Force Base. Offerors must regularly check SAM.gov for any amendments and are required to register in SAM to participate. All questions must be submitted in writing to the identified contracting officer and contract specialist by the specified due date.
View the file
Other files
Show 40 more
Latest 50 of 93 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Laughlin WBS
| WORK BREAKDOWN STRUCTURE (WBS) TEMPLATE | FA300222R0002 | |||||||||||
| Attachment 18 | ||||||||||||
| 9-Mar-22 | ||||||||||||
| PWS PARA | REQUIREMENT | SKILL | SKILL LEVEL | LABOR CLASS CBA/Exempt | UNIT | TIME PER UNIT | NUMBER UNITS ANNUALLY | MANYEAR HOURS | Total FTE | Position Description | Cross Utilization Information | |
| EXAMPLE 23.1.2.3 | EXAMPLE Computer/Systems Operations | Computer Programer | Exempt | EXAMPLE Daily | 8.00 | 260.00 | 2080.00 | 1.00 | EXAMPLE Have and maintain Information Assurance (IA) level certification(s) IAW with DoD 8570.01-M, Information Assurance Workforce Improvement Program. Assist the AFSC to maintain the integrity of Air Force Logistics Management Information Systems. Serve as the local point of contact for Logistics Management Information Systems software, hardware, and network issues. Maintain Asset Management System (AMS) hardware and software to include mobile devices. Ensure compliance with AF and AETC published Checklists. Ensure compliance with AF and AETC SII & CII. Perform LRF and joint LRF and AFSC Computer Operations responsibilities |
EXAMPLE 11.1.2.3. EXAMPLE Heavy Repair EXAMPLE Heavy Repair Operator EXAMPLE CBA EXAMPLE Daily 8.00 260.00 2080.00 1.00 Manage and provide properly functioning all real property structures, interior and exterior areas at LAFB and all attached or related properties under the control of LAFB such as, facilities, pavements, roads, sidewalks, and fences. Maintain all airfields IAW Bird Air Strike Hazard (BASH) standards. Provide pavement clearance, pavement sustainment, signage, storm drainage system, and structure systems. SIGANGE Fabricate, install, maintain, and repair appropriately 1,880 standardized signs in compliance with the most current UFC 3-120-01, Design: Sign Standards. Signs such as for buildings, traffic lights, traffic control, reserved parking, and handicap access (ADA), building names, dedication signs, and visitor directions, main gate signs and marquees shall meet UFC 3-120-01 requirements. Signage 11.1.2.3.1.3.
&"-,Bold"
SECTION J - ATTACH X FA300221R0012
20 MAY 2021
File details come from the government source that posted it. Updated .