Attachment 25_Seed Project Monaco Annunciator Panel Pictures and Fire Alarm Inspection Record.pdf

PDF 4 MB Posted

Attached to
Joint Base Andrews (JBA) and Joint Base Anacostia Bolling (JBAB) Simplified Acquisition of Base Engineering Requirements (SABER)
Solicitation number
FA286020R0005
Issued by

About this file

This document contains details of a pre-solicitation notice for a Simplified Acquisition of Base Engineering Requirements contract opportunity. The Department of the Air Force intends to issue an indefinite delivery indefinite quantity contract for construction services at Joint Base Andrews and Joint Base Anacostia Bolling, with a magnitude between $100 million and $250 million. Services will include carpentry, road and parking repairs, roofing, excavation, electrical, plumbing and other construction tasks. The solicitation is designated as an 8(a) competitive set-aside for SBA 8(a) firms located in the Mid-Atlantic region. Interested firms must show evidence of bonding capability up to $1 million for single projects and an aggregate total of $30 million. The anticipated solicitation posting date is January 27, 2020 on SAM.gov. The contract will have a five-year base period and two one-year options, with a minimum guarantee of $2,000. Evaluation criteria will consider technical acceptability, past performance, and price.

View the file

Other files

File Type Posted
SF 1442 Solicitation Amendment - FA2860-20-R-0005 0003.pdf PDF
Attachment 20_Revised3 - Section M Evaluation Criteria For Award.pdf PDF
SF 30 Solicitation Amendment FA286020-R-0005 0003.pdf PDF
SF 1442 Solicitation Amendment FA2860-20-R-0005 0002.pdf PDF
Attachment 15_Revised2 Section L Instructions Conditions and Notices to Bidders.pdf PDF
Attachment 14_Revised2 Section C SABER SOW.pdf PDF
Attachment 20_Revised2 - Section M Evaluation Criteria For Award.pdf PDF
Attachment 11_Revised2 JBA Demonstration Seed Project.pdf PDF
SF 30 Solicitation Amendment FA2860-20-R-0005 0002.pdf PDF
FA286020R0005 Clarification Questions to QandAs dated 14 Apr 2020.pdf PDF
Attachment 14_Revised Section C SABER SOW.pdf PDF
Attachment 23_ As Built As Circa 1990_Seed Project.pdf PDF
SF 30 Solicitation Amendment FA2860-20-R- 0005 0001.pdf PDF
Attachment 11_Revised JBA Demonstration Seed Project.pdf PDF
SF 1442 Solicitation Amendment - FA2860-20-R-0005 0001.pdf PDF
Attachment 22_ As Built As Circa 1990_Seed Project.pdf PDF
Attachment 24_JB Andrews Fire Protection Standards - Jan 2020.pdf PDF
Attachment 20_Revised Section M Evaluation Criteria For Award.pdf PDF
Attachment 15_Revised Section L - Instructions Conditions and Notices to Bidders.pdf PDF
FA286020R0005 QandA _SABER_Final 14 Apr 2020.docx DOCX document
Attachment 21 FA286020R0005 SABER Site Visit Minutes.pdf PDF
Attachment 7_Wage Determination MD20200066 PG Residential.pdf PDF
Attachment 8_Wage Determination MD20200039 AA Building.pdf PDF
Attachment 17_Present Past Performance Questionnaire (PPPQ) Cover Letter.pdf PDF
Attachment 16_Present Past Performance Information PPI.pdf PDF
Attachment 12_Section B Bid Schedule.pdf PDF
Attachment 20_Section M Evaluation Criteria For Award.pdf PDF
Attachment 5_Wage Determination MD20200021 PG Heavy.pdf PDF
Attachment 4_Wage Determination MD20200044 PG Building.pdf PDF
Attachment 6_Wage Determination MD20200074 PG Highway.pdf PDF
Attachment 19_Subcontractor Teaming Partner Consent Letter.pdf PDF
Attachment 1_Wage Determination DC20200002 Building.pdf PDF
Attachment 2_Wage Determination DC20200001 Heavy and Highway.pdf PDF
Attachment 14_Section C SABER SOW.pdf PDF
Attachment 15 Section L - Instructions, Conditions and Notices to Bidders.pdf PDF
Attachment 10_Wage Determination MD20200046 AA Highway.pdf PDF
Attachment 9_Wage Determination MD20200012 AA Heavy.pdf PDF
Attachment 3_Wage Determination DC20200003 Residential.pdf PDF
JBA-JBAB SABER Solicitation FA286020R0005.pdf PDF
Attachment 18_Present Past Performance Questionnaire.pdf PDF
Attachment 13_Price Evaluation Worksheet.xlsx XLSX spreadsheet
Attachment 11 JBA Demonstration Seed Project.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 25 SEED Project Monaco Annunciator Panel Pictures (7) Fire Alarm Inspection Record for B- 3285

::::t ........ --·--. --., -·

Fire Alarm Inspection Record for B- 3285

INSPECTION/TESTING/PREVENTATIVE MAINTENANCE REPORT FORM

TIME: 1200 DATE: 10-11-19

MEM Contracting, Inc.

3608 Patrick Ave. Bldg. #: 3285

Joint Base Andrews, MD 20762 Address: NAVY BUILDING

Representative: B. Hoerr/F. Lujan Bldg. P.O.C.: Clifford.minor.1@us.af.mil

Telephone #: Telephone #: 240-857-6651

MONITORING ENTITY APPROVING AGENCY

Contact: AAF FD Contact:

Telephone: 301-981-4986 Telephone:

TYPE TRANSMISSION SERVICE

Telephone Lines Weekly

Radio Transmitter Monthly

McCullough Quarterly

Digital Semi-Annually

Multiplex Annually

Control Unit Fire Lite Model # 424A

Circuit Style 6 Number of Circuits 2 zones

Software Rev

Last Date System Was Serviced

Last Date Software/Configuration Revised

ALARM-INITIATING DEVICES/CIRCUIT INFORMATION

Quantity Circuit Style

6 Manual Fire Alarm Boxes

Ion Smoke Detectors

Photo Smoke Detectors

Duct Smoke Detectors

6 Heat Detectors

Water-flow Switches

Supervisory Switches

Other:

ALARM NOTIFICATION APPLIANCES/CIRCUIT INFORMATION

Quantity Circuit Style

See Device List Bells

See Device List Horns

See Device List Strobes

See Device List Z Horn/Strobes

See Device List Chimes

See Device List Speakers

See Device List Other:

Number of Alarm Notification Circuits: 1

Number of N.A.C. Panels: 0

Are Circuits Monitored for Integrity? Yes No

SUPERVISORY SIGNAL-INITIATING DEVICES/CIRCUIT INFORMATION

Quantity Circuit Style

Fire Pump Power

Fire Pump Running

Fire Pump Auto Position

Fire Pump/Controller Trouble

Valve Tamper Trouble

Low Air Pressure

Generator Running

Other:

SIGNALING LINE CIRCUITS

Quantity Style(s)

SYSTEM POWER SUPPLIES

A. Primary (Main): Nominal Volts 120v Amps 20amp.

Over-current Protection: Type DTK Amps 20amp.

Location (Primary Supply Power) Mech closet

B. Secondary (Standby)

2 -12v Storage Battery: Amp Hours 7AHR.

TYPE OF BATTERY

Dry Cell

Nickel-Cadmium

Sealed Lead-Acid

Lead Acid

Gel-Cell

Other: 12.99v/12.90v 6.2ah

PRIOR TO ANY TESTING

NOTIFICATIONS ARE MADE Yes No Who Time

Monitoring Entity AFD 1200

Building Occupants Personnel 1200

Building P.O.C

Other:

AHJ (Notified) If Problems

SYSTEM TESTS AND INSPECTION

TYPE Visual Functional Comments

Control Unit (S)

Interface Equip. Monaco # 297

Lamps/L.E.D.’s 12.98v 5.9ah

Fuses

Primary Power Sup

Trouble Signals

Disc. Switch

Ground Faults

SECONDARY POWER

TYPE Visual Functional Comments

Battery Condition

Load Voltage

Discharge Test

Charger Test

Specific Gravity

Surge Suppressor

Remote Annunciator

NOTIFICATION APPLIANCES

TYPE Visual Functional Comments

Audible

Visual

Speaker

Voice Clarity

EMRGENCY COMMUNICATION EQUIPMENT

TYPE Visual Functional Comments

Phone Set

Phone Jacks

Off Hook Lamp

Amplifiers

Tone Generator

Call In Signal

System Performance

INTERFACE EQUIPMENT Visual Operation Simulation

Specify Monaco

Specify

SPECIAL HAZARD SYSTEM

Specify

Specify

Special Procedures:

Comments:

SUPERVISING STATION MONITORING

TYPE Yes No Time Comments

Alarm Signal 1020 10-11-19

Alarm Restoration 1021

Trouble Signal 1025

Supervisory Signal

Supervisory Restoration

NOTIFICATION THAT TEST IS COMPLETE

Notified Yes No Who Time

Building P.O.C

Monitoring Entity AFD 1300

Building Occupants Personnel 1300

SEE ATTACHED DISCREPANCIES SHEET FOR LIST OF ITEMS.

System Restored To Normal Operation: Date 10-11-19 Time 1300

THIS TESTING WAS PERFORMED IN ACCORDANCE WITH APPLICABLE NFPA

STANDARDS.

Name of Inspector(s): Bill Hoerr / Fernando Lujan Date: 10-11-19 Time: 1300

Bldg. Name: Navy Building Polygraph Bldg. # 3285 Date: 10-11-19

# Device Location Visual ZONE/ADDRESS Pass Fail

1. P South entrance Z-1

2. HD South part of building Z-2

3. HD South part of building Z-2

4. HD South part of building Z-2

5. HD South part of building Z-2

6. P North exit Z-1

7. H-ST hallway

8. HD South part of building Z-2

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

P - Pull Station WF - Water-flow TS - Valve Tamper PS - Pressure Switch SD - Smoke Detector HD - Heat Detector

DD - Duct Detector GD - Gas Detector B - Bell ST-Strobe H - Horn S – Speaker A - Abort SV - Solenoid Valve

DC - Door Closure

Comments:

Discrepancy Report

1.

Field Report

Recommendation:

File details come from the government source that posted it. Updated .