SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SPECIAL CONTRACT REQUIREMENTS
H-1 PROJECT DISTRIBUTION:
It is estimated that the maximum dollar amount of this IDIQ contract will be distributed approximately as follows:
| Distribution |
| Contract Line Item Coefficient Ranges |
| 45% |
| Project costs between $2000 - $99,999.99 during standard working hours |
| 25% |
| Project costs between $100,000 - $299,999.99 during standard working hours |
| 12% |
| Project costs between $300,000 - $499,999.99 during standard working hours |
| 14% |
| Project costs greater than $500,000.00 during standard working hours |
| 2% |
| Work during non-standard working hours |
| 2% |
| Work performed in secure areas |
100%
The above information is provided for estimating and planning purposes only. This information does not obligate the Government to meet this workload distribution in any way. Actual distribution of projects may vary from the above.
H-2 INTENTIONALLY LEFT BLANK
H-3 STATUTORY COST LIMITATIONS:
Some delivery orders may be subject to a statutory cost limitation. In those instances the following provision, DFARS 252.236-7006 “Cost Limitation (Jan 1997)” shall apply and it shall be referenced in those delivery orders.
H-4 BONDS:
a. The initial bond amount is based upon the contract minimum (est $300,000.00). When the value of delivery orders in progress exceeds the existing bonding, the contracting officer may require additional bond protection by directing the contractor to increase the penal amount of the existing bond, or to obtain additional bonds. Although the amount of the initial bond is based on the minimum dollar amount, bond premium costs should be included in the coefficients as an indirect cost based on the estimated annual contract amount of $9M, not just the bonding requirements imposed for the minimum amount at award. In accordance with FAR 52.232-5, the government will reimburse the contractor for bond premiums upon request if the contractor provides evidence of full payment of such premiums to the surety. Payment for such premiums will be treated the same as all other progress payments made under delivery orders. Payments for bond premiums, at any time during contract performance, are not additional costs under the contract.
b. BID BOND: A proposal/bid bond is not required with the proposal.
c. PERFORMANCE AND PAYMENT BONDS: The contractor shall submit a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25-A) with good and sufficient surety or sureties to the Government. The penal sum of such bonds will be as follows:
· PERFORMANCE BONDS: The penal amount of the performance bond shall equal one hundred percent (100%) of each delivery order issued.
· PAYMENT BONDS: The penal amount of the performance bond shall equal one hundred percent (100%) of each delivery order issued.
· Contractor selected for contract award must have the capability to obtain Performance and Payments bonds at the aggregate value of $9M in the event that an active workload of such value exists.
Required performance and payment bonds will be furnished by the contractor to the Government prior to commencement of contract performance. Performance and payment bonds, in the amounts stated above, will also be required for any options exercised.
H-5 CONTRACT PHASE-IN/PHASE-OUT:
a. The contractor shall commence any mobilization and familiarization activities prior to actual work on individual delivery orders as soon after contract award as practicable. However, within 15 calendar days after contract award, the contractor shall mobilize the necessary personnel and equipment to estimate and negotiate requirements. The contractor shall have fully operational field offices with all required facilities, staff and automated data processing (ADP) capabilities within thirty (30) calendar days after contract award.
b. Contractor must vacate government furnished office space and storage areas on the last day of the contract period. Premises must be returned in the same condition in which they were received or as agreed to by the contracting officer. All ongoing delivery orders must be completed from an approved field office or off-base location.
H-6 DAVIS-BACON WAGE RATE(s) APPLICATION
a. This contract is an indefinite-delivery, indefinite-quantity (IDIQ) requirement and contains options to extend the term of the contract. The specific sites of performance for the various delivery orders that may be issued are unknown. The wage determination issued under the Davis-Bacon Act by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, current at time of award or at the exercise of each option to extend the term of the contract, shall be incorporated into the contract in full text and, as applicable, by reference into each delivery order issued during each performance period. They shall be effective for the complete period of performance of those delivery orders without further revision.
b. Each offeror is provided an opportunity to propose separate prices/coefficients for the basic and each option period. Additionally at the beginning of each option period, a new Unit Pre-Priced Database (i.e. the Means Facilities Composite Database) with current year pricing will be incorporated and used to price individual projects in conformance with the terms and conditions specified herein. Therefore, no further adjustment to contract pricing will be permitted to cover any increase or decrease in wages and benefits as a result of:
(1) Incorporation of the wage determination(s) applicable at the exercise of the option to extend the term of the contract.
(2) Incorporation of a wage determination(s) otherwise applied to the contract by operation of law; or
(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the Davis-Bacon Act.
H-7 PRE-PROPOSAL CONFERENCE
A pre-proposal conference and site visit will be conducted on 21 July 15 in support of this requirement. A familiarization tour of Joint Base Andrews (JBA), MD as well as a site visit for the demonstration/seed project will follow the pre-proposal conference. Prospective offerors interested in attending should contact Tony Weedin via email with an attached letter or (company letterhead) identifying all personnel attending (no more than four personnel per company). The email and attached company letter can be sent to anthony.j.weedin.ctr@mail.mil NLT 20 July 15 to RSVP.
H-8 CONSTRUCTION EQUIPMENT
All equipment to be used on JBA, shall be safe and in good operating condition. The Contracting Officer and/or CE PM personnel assigned to the delivery orders reserve the right to inspect any on base equipment and reject the use of such equipment if he/she considers it unsafe, in poor operating condition, or inappropriate for work. Any equipment rejected due to operating condition will be removed from JBA immediately and any resulting costs will be the responsibility of the contractor.
H-9 CONTRACTOR RESPONSIBILITY
Contractors operating on JBA will be responsible for briefing and ensuring the employees adhere to the base safety, traffic rules and regulations. The Project Manager (PM) and/or any other personnel providing workman leadership will ensure all workers comply with these rules and regulations. Speed limits on base are posted and must be complied with. Air Force Security Forces and Maryland State Troopers personnel utilize speed detection devices to monitor speed and citations carrying monetary fines will be issued to violators. Personnel who park in areas other than those designated for parking will be cited. Individuals are to obey all entry procedures; all instructions given by Air Force Security Forces personnel at the entry points (gates) shall be complied with immediately.
H-10 HOLIDAYS
The following Federal legal holidays are observed by this base:
· New Year’s Day
· Martin Luther King’s Birthday
· President’s Day
· Memorial Day
· Independence Day
· Labor Day
· Columbus Day
· Veterans Day
· Thanksgiving Day
· Christmas Day
H-11 INSURANCE
The following insurance will be required IAW FAR 28.307-2:
Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
General liability:
- The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
- Property damage liability insurance shall be required only in special circumstances as determined by the agency.
Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
H-12 PERSONNEL SECURITY PROGRAM MANAGEMENT - AFI 31-501 (20 Aug 2010)
The contractor shall not employ any person for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor employ any person under this contract who has an outstanding criminal warrant as identified by the National Agency Check with Inquires Crime (NACI). NACI checks will verify if a person is wanted by local, state, and federal agencies. All contractor personnel must consent to NACI background checks. Contractor personnel who do not consent to an NACI check will be denied access to the installation. Information required to conduct an NACI check includes: full name, driver's license number/state issued/expiration date, social security number, and date of birth of the person entering the installation and shall be submitted in conjunction with the contractor's request for vehicle passes. Completion of a successful NACI check does not invalidate the requirement for an escort when contractor personnel are working within controlled or restricted areas.
Contractors shall ensure their employees and those of their subcontractors have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities.
The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required. The contractor shall flow this clause down to all subcontracts.
The following have been deleted:
| 52.228-1 |
| Bid Guarantee |
| SEP 1996 |
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
252.228-7004 BONDS OR OTHER SECURITY (DEC 1991)
(1) A performance bond in the penal amount of the contractors seed project after notice of award and
(2) Payment in full of any sum due the Government.
(b) The Contractor shall furnish the performance bond to the Contracting Officer within 10 (ten) days after receipt of the notice of award. The Contracting Officer will not issue the notice to proceed until receipt of an acceptable performance bond and payment of any sum due the Government.
(c) Bonds supported by sureties whose names appear on the list contained in Treasury Department Circular 570 are acceptable. Performance bonds from individual sureties are acceptable if each person acting as a surety provides a SF 28, Affidavit of Individual Surety, and a pledge of assets acceptable to the Contracting Officer.
(End of clause)
(End of Summary of Changes)