Attachment_6_Price_Evaluation_Worksheet.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) - FA2860-15-R-0008
Solicitation number
FA2860-15-R-0008
Issued by

About this file

Revised Price Evaluation Worksheet

View the file

Other files

File Type Posted
FA2860-15-R-0008_P0012_SABER_Solicitation_Amendment.doc DOC document
FA2860-15-R-0008_P0009_SABER_Solicitation.doc DOC document
FA2860-15-R-0008_P0007_SABER_Solicitation.doc DOC document
Questions_Part_2_FA2860-15-R-0008.pdf PDF
Questions_Sol__No__FA2860-15-R-0008_13_Aug_15.pdf PDF
JBA_Tax_Exempt_Certificate.pdf PDF
FA2860-15-R-0008_P0006_SABER_Solicitation.doc DOC document
Questions_Sol__No__FA2860-15-R-0008_13_Aug_2015.pdf PDF
AF_66_Submittal_Sheet_for_AJXF_14-1584.xlsx XLSX spreadsheet
JBA_Architectural_and_Interior_Design_Standards.pdf PDF
FA2860-15-R-0008_P0005_Time_Ext.doc DOC document
Questions_and_Answers_as_of_29_July_15.pdf PDF
Water_Fountain_Near_TAC_Fit.jpg JPG image
FA2860-15-R-0008_P0004_SABER_Solicitation.doc DOC document
SABER_Site_Visit_Minutes_21_July_15.docx DOCX document
JBA_SABER_Sign_In_Sheet_PDF.pdf PDF
Elec_Panel_Pix_3.jpg JPG image
Elec_Panel_Pix_2.jpg JPG image
HVAC_System_Floor_Plan_Building_1444.pdf PDF
Repair_HVAC_System_Floor_Plan_Building_1444.pdf PDF
Water_Fountain_Near_Front_Desk.jpg JPG image
Elec_Panel_Pix_1.jpg JPG image
Bldg_1444_Floor_Drawing.pdf PDF
Mechanical_Drawing_Bldg_1444.pdf PDF
TAC_Fitness_Bldg_1445.pdf PDF
HVAC_System_Floor_Plan_Building_1444__Demo.pdf PDF
FA2860-15-R-0008_P00001_SABER_Solicitation.doc DOC document
Price_Evaluation_Worksheet_Attachment_6.xls XLS spreadsheet
Heavy_MD150035_MD35.pdf PDF
FA2860-15-R-0008_SABER_Solicitation_for_JBA_MD.doc DOC document
Residential_MD150081_MD81.docx DOCX document
AF_Form_66_SABER.xls XLS spreadsheet
Highway_MD150100_MD100.pdf PDF
Building_MD150058_MD58.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

CLINItem DescriptionWeight based on histroical dataProposed CoefficientWeighted Value Result
0001AAStandard Hours, $2000 - $99,999.9945%0.0000
0001ABStandard Hours, $100,000 - $299,999.9925%0.0000
0001ACStandard Hours, $300,000 - $499,999.9912%0.0000
0001ADStandard Hours, Greater than $500,00014%0.0000
0001AEWork during non-standard working hours2%0.0000
0001AFWork performed in secure areas2%0.0000
SUBTOTAL WEIGHTED COEFFICIENT RATE100%0
NOTE: Transfer subtotal weighted coefficient rate to the Base Year subtotal weighted coefficient column in the Price Evaluation Worksheet in the evaluation tab.

&"Times New Roman,Bold"&10Attachment 6 - Price Evaluation Sheet

BASE YEAR

Option Year Period 1

CLINItem DescriptionWeight based on histroical dataProposed CoefficientWeighted Value Result
1001AAStandard Hours, $2000 - $99,999.9945%0.0000
1001ABStandard Hours, $100,000 - $299,999.9925%0.0000
1001ACStandard Hours, $300,000 - $499,999.9912%0.0000
1001ADStandard Hours, Greater than $500,00014%0.0000
1001AEWork during non-standard working hours2%0.0000
1001AFWork performed in secure areas2%0.0000
SUBTOTAL WEIGHTED COEFFICIENT RATE100%0
NOTE: Transfer subtotal weighted coefficient rate to the Option Year 1 subtotal weighted coefficient column in the Price Evaluation Worksheet in the evaluation tab.

Option Year Period 1

Option Year Period 2

CLINItem DescriptionWeight based on histroical dataProposed CoefficientWeighted Value Result
2001AAStandard Hours, $2000 - $99,999.9945%0.0000
2001ABStandard Hours, $100,000 - $299,999.9925%0.0000
2001ACStandard Hours, $300,000 - $499,999.9912%0.0000
2001ADStandard Hours, Greater than $500,00014%0.0000
2001AEWork during non-standard working hours2%0.0000
2001AFWork performed in secure areas2%0.0000
SUBTOTAL WEIGHTED COEFFICIENT RATE100%0
NOTE: Transfer subtotal weighted coefficient rate to the Option Year 2 subtotal weighted coefficient column in the Price Evaluation Worksheet in the evaluation tab.

Option Year Period 2

Option Year Period 3

CLINItem DescriptionWeight based on histroical dataProposed CoefficientWeighted Value Result
3001AAStandard Hours, $2000 - $99,999.9945%0.0000
3001ABStandard Hours, $100,000 - $299,999.9925%0.0000
3001ACStandard Hours, $300,000 - $499,999.9912%0.0000
3001ADStandard Hours, Greater than $500,00014%0.0000
3001AEWork during non-standard working hours2%0.0000
3001AFWork performed in secure areas2%0.0000
SUBTOTAL WEIGHTED COEFFICIENT RATE100%0
NOTE: Transfer subtotal weighted coefficient rate to the Option Year 3 subtotal weighted coefficient column in the Price Evaluation Worksheet in the evaluation tab.

Option Year Period 3

Option Year Period 4

CLINItem DescriptionWeight based on histroical dataProposed CoefficientWeighted Value Result
4001AAStandard Hours, $2000 - $99,999.9945%0.0000
4001ABStandard Hours, $100,000 - $299,999.9925%0.0000
4001ACStandard Hours, $300,000 - $499,999.9912%0.0000
4001ADStandard Hours, Greater than $500,00014%0.0000
4001AEWork during non-standard working hours2%0.0000
4001AFWork performed in secure areas2%0.0000
SUBTOTAL WEIGHTED COEFFICIENT RATE100%0
NOTE: Transfer subtotal weighted coefficient rate to the Option Year 4 subtotal weighted coefficient column in the Price Evaluation Worksheet in the evaluation tab.

Option Year Period 4

6-Month Extension

CLINItem DescriptionWeight based on histroical dataProposed CoefficientWeighted Value Result
5001AAStandard Hours, $2000 - $99,999.9945%0.0000
5001ABStandard Hours, $100,000 - $299,999.9925%0.0000
5001ACStandard Hours, $300,000 - $499,999.9912%0.0000
5001ADStandard Hours, Greater than $500,00014%0.0000
5001AEWork during non-standard working hours2%0.0000
5001AFWork performed in secure areas2%0.0000
SUBTOTAL WEIGHTED COEFFICIENT RATE100%0
NOTE: Transfer subtotal weighted coefficient rate to the 6-Month Extension subtotal weighted coefficient column in the Price Evaluation Worksheet in the evaluation tab.

6-Month Extension

EVALUATION

FA2860-15-R-0008 Attachment 6 PRICE EVALUATION WORKSHEET Simplified Acquisition of Base Engineer Requirements (SABER) Contract

Equation: (For Evaluation Purposes Only!) Base Year Price = $10M x coefficient Option Years Price = $10M x coefficient 6-Month Extension = $5M x coefficient Total Evaluated Price = Base Year Price + All Option Year Prices

Instruction to Offerors: The weighted coefficient rates will be evaluated. Fill-in highlighted boxes only; data to correspond with offerors proposed prices as inserted within the Solicitation/Contract Line Items. The coefficient shall be no further out than to the hundredths (0.000).

Estimate Aggregate Total of Yearly ProjectsSubtotal Weighted Coefficient RatesEvaluated Total(s)
Base Year$10,000,000.00x=$0.00
Option Year 1$10,000,000.00x=$0.00
Option Year 2$10,000,000.00x=$0.00
Option Year 3$10,000,000.00x=$0.00
Option Year 4$10,000,000.00X=$0.00
6-Month Extension$5,000,000.00x=$0.00

Total Evaluated Price: $0.00

File details come from the government source that posted it. Updated .