Pmt_SOB.PDF

PDF 13 KB Posted

Attached to
Vehicle Operations and Maintenance
Solicitation number
FA2521-07-R-8506
Issued by

About this file

Statement of Basis

View the file

Other files

File Type Posted
FA2521-07-R-8506 AMENDMENT 10 29 MAY 08.doc DOC document
FA2521-07-R-8506 AMENDMENT 09 21 MAY 08.pdf PDF
CCEMP JHB 2000_Basic.zip ZIP file
0090005-010-avf.pdf PDF
FINAL_Cov Ltr.PDF PDF
Cov_Ltr.PDF PDF
APP_TV-6.PDF PDF
APP_H-1.PDF PDF
App. A-1.PDF PDF
APP_U-1.PDF PDF
APP_I-1.PDF PDF
Pmt_SPC.PDF PDF
PAFB Title V Permit.zip ZIP file
Reference Material 9.zip ZIP file
Reference Material 10.zip ZIP file
Reference Material 8.zip ZIP file
Reference Material 7.zip ZIP file
Reference Material 3.zip ZIP file
Reference Material 4.zip ZIP file
Reference Material 5.zip ZIP file
Reference Material 2.zip ZIP file
Reference Material 6.zip ZIP file
Reference Material 1A.zip ZIP file
Dispatch Report 01-06 through 12-06.pdf PDF
DD Form 254.pdf PDF
OLVIMS Reports —
FA2521-07-R-8506-U0008 AMENDMENT 8 14 APR 08.doc DOC document
VOMS PWS 18 JAN 08 FINAL UPDATED 14 MAR 08.rtf RTF text file
VOMS PWS 18 JAN 08 FINAL UPDATED 4 Mar 08.rtf RTF text file
VOMS PWS 18 JAN 08 FINAL UPDATED 15 FEB 08.rtf RTF text file
VOMS PWS 18 JAN 08 FINAL UPDATED 9 FEB 08.rtf RTF text file
VOMS PWS 18 JAN 08 FINAL.rtf RTF text file
VOMS QUESTIONS POSTED TO FEDBIZOPSS 15 FEB 08.doc DOC document
QUESTIONS ANSWERS FINAL AS OF 14 MAR 08 Final.doc DOC document
VOMS OFFEROR QUESTIONS AND ANSWERS 18 JAN 08.doc DOC document
VOMS Pre Proposal Conference Slides —
VOMS Minutes of Pre-Proposal Site-Visit Conference.doc DOC document
FA2521-07-R-8506 U0007 AMENDMENT 7 22 MAR 08.doc DOC document
FA2521-07-R-8506-U0006 AMENDMENT 6 14 MAR 08.doc DOC document
FA2524-07-R-8506- U0005 Amendment 5.doc DOC document
FA2521-07-R-8506-U0004 AMENDMENT 4 28 FEB 08.doc DOC document
AMENDMENT-MOD 3 TO FA2521-07-8506 15 FEB 08.doc DOC document
AMENDMENT-MOD 02 FA2521-07-R-8506 9 FEB 08 FINAL.pdf PDF
CONFORMED FA2521-07-R-8506 AMENDMENT 2 9 FEB 08 FINAL.doc DOC document
CONFORMED AMENDMENT 1 FA2521-07-R-8506 1 FEB 08.doc DOC document
AMENDMENT ONE TO FA2521-07-R-8506 1 FEB 08.doc DOC document
FA2521-07-R-8506 VOMS FINAL RFP.pdf PDF
VOMS OFFEROR QUESTIONS.doc DOC document
DRAFT VOMS PWS FEDBIZOPPS AS OF 13 DEC 07.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF BASIS

U. S. Air Force Cape Canaveral Air Station Facility ID No.: 0090005

Brevard County

Renewal Title V Air Operation Permit FINAL Permit No.: 0090005-010-AV

This Title V air operation permit is issued under the provisions of Chapter 403, Florida Statutes (F.S.), and Florida Administrative Code (F.A.C.) Chapters 62-4, 62-210, and 62-213. The above named permittee is hereby authorized to perform the work or operate the facility shown on the application and approved drawing(s), plans, and other documents, attached hereto or on file with the permitting authority, in accordance with the terms and conditions of this permit.

This is a military facility that contains the following emission units:

a) Eight Steam Boilers as follows: CCAFS Boiler #1, #2, #7, and #8 (Donlee Technology), CCAFS Boilers #3 and #4 (Cleaver Brooks) CCAFS Boilers #5 and #6 (Portable)

b) - CCAFS Solvent Sinks Set #1 and Five Paint Spray Booths as follows: CCAFS Solvent Sink Set #1, used for cleaning and preparation of small parts and tools equipped with a single hood, and CCAFS Paint Spray Booths #1,#3, #4, and #5 equipped with dry paint filters and CCAFS Paint Spray Booth #2 equipped with water fall

c) Abrasive Blasting Yards #1, #2, #3, #4, and CCAFS Abrasive Blasting Booth #1

d) CCAFS Engine Driven Chiller #1, fueled by natural gas. This unit constructed was under air construction permit number 0090005-005-AC, issued February 15, 2000, and incorporated into the Title V permit by revision 0090005-006-AV, issued November 13, 2000.

Also included in this permit are miscellaneous insignificant and unregulated emission units and/or activities Based on the initial Title V permit application received June 3, 1996, this facility is a major source of hazardous air pollutants (HAPs).

The applicable emission limitations are as follows:

a) Eight Steam Boilers - VE limit per Rule 62-296.406(1), F.A.C.; BACT per Rule 62- 296.406(2)&(3), F.A.C.

b) Three Solvent Sinks and Five Paint Spray Booths - general VOC standard per Rule 62- 296.320(1)(a), F.A.C.; annual VOC limit per construction permits; VE limit per Rule 62- 296.320(4)(b), F.A.C

c) No. 2 Fuel Oil Storage Tanks #81900 (12,000 gal. AST) and #60533A (16,000 gal. AST) - 40 CFR Part 60, NSPS Subpart Kb

d) Abrasive Blasting - VE limit per Rule 62-296.320(4)(b), F.A.C.

e) Engine Driven Chiller #1 - VE limit per Rule 62-296.406(1), F.A.C.

Construction permit 0090005-008-AC was issued to make the facility a minor for HAP emissions (remains a major facility for other pollutants) and therefore avoid being subject to NESHAP 40 CFR 63, Subpart ZZZZ. HAP emission are limited to less than 9.5/24.5 tons/yr. The permit also sets a limit of 352,000 gals/yr of diesel fuel fired for the IC engines and generators (reclassified as permitted but previously listed as insignificant units); adds a 28,000 gal. kerosene storage tank subject to NSPS Subpart Kb recordkeeping only (24 lb/yr VOC emissions); and allows the firing of bio-diesel fuel in the boilers.

File details come from the government source that posted it. Updated .